Changelog - Thursday, Aug 29, 2024

< Back
PipeRiv has added 5 more pipeline systems to the critical notice tracker bringing the total to 80 (goal of 175). Here are current stats:
  • Critical Notice Tracking: 80
  • Capacity Connection (display): 10
  • Capacity Tracking (saving to db, notifications): 2


Carlsbad Gateway


Cove Point LNG


Eastern Gas Transmission and Storage


Great Basin Gas Transmission


TransCameron Pipeline