AGT Shipper Level OFO - For Receipts at Beverly Meters (00215,01215,99855)
Algonquin Gas Transmission 1d ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
Indicator Description: 
Response Date: 
Response Time: 
Subject: 
Algonquin Gas Transmission, LLC
Critical notice
02/06/2025
09:00:00 AM
04/29/2025
10:25:05 AM
158195
Initiate
Operational Flow Order
01/29/2025
01:00:00 PM
No response required
AGT Shipper Level OFO - For Receipts at Beverly Meters (00215,01215,99855)
Algonquin Gas Transmission (AGT) is currently experiencing large nomination changes to scheduled receipt quantities throughout the gas day at its Beverly Interconnect with Maritimes and Northeast Pipeline (M&N). In order to alleviate these conditions, which threaten to impair reliable firm service, AGT needs to minimize such large nomination fluctuations and is therefore issuing an Operational Flow Order (OFO) pursuant to Section 26 of the General Terms and Conditions of AGT's FERC Gas Tariff effective 9:00 AM CCT, February 6, 2025.
This OFO does not affect the ability of AGT to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.
During the effectiveness of this OFO, Shipper's scheduling receipt quantities at AGT's interconnect with M&N (meter numbers 00215,01215,99855), must have obtained physical supply with the intention of transporting such quantities through these interconnect locations.
With respect to each gas day for the period during which this OFO is in effect, Shippers will be penalized if their highest scheduled quantity for the gas day during any hourly cycle throughout the gas day is reduced such that the scheduled quantity at the end of the gas day is more than 15,000 Dth or 40% (whichever is higher) lower than such highest scheduled quantity. The tolerance of 15,000 Dth or 40% is based on the cumulative scheduled quantity amongst all of the Shipper's contracts (penalty is calculated at a Shipper level rather than each individual contract). With respect to any Shipper whose cumulative scheduled quantity is reduced by more than 15,000 Dth or 40% of its highest scheduled quantity during the gas day compared to the end of the gas day, that Shipper will be assessed a penalty for such gas day for an amount equal to the quantity in dekatherms outside of the tolerance multiplied by three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for "Algonquin, city-gates" for the day on which such violation occurred, as indicated in AGT's General Terms and Conditions Section 26.8. This OFO penalty shall apply unless the Shipper demonstrates to AGT's reasonable satisfaction that the scheduled quantity changes during the applicable gas day were the result of intraday bumping or an abnormal operational issue affecting Customer's supply or market related to the Shipper's highest scheduled quantity for such gas day at the meters listed above.
This OFO will remain in effect until further notice.
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
Indicator Description: 
Response Date: 
Response Time: 
Subject: 
Algonquin Gas Transmission, LLC
Critical notice
02/06/2025
09:00:00 AM
04/29/2025
10:25:05 AM
158195
Initiate
Operational Flow Order
01/29/2025
01:00:00 PM
No response required
AGT Shipper Level OFO - For Receipts at Beverly Meters (00215,01215,99855)
Algonquin Gas Transmission (AGT) is currently experiencing large nomination changes to scheduled receipt quantities throughout the gas day at its Beverly Interconnect with Maritimes and Northeast Pipeline (M&N). In order to alleviate these conditions, which threaten to impair reliable firm service, AGT needs to minimize such large nomination fluctuations and is therefore issuing an Operational Flow Order (OFO) pursuant to Section 26 of the General Terms and Conditions of AGT's FERC Gas Tariff effective 9:00 AM CCT, February 6, 2025.
This OFO does not affect the ability of AGT to receive or deliver quantities of gas for scheduled nominations to any customer or pipeline.
During the effectiveness of this OFO, Shipper's scheduling receipt quantities at AGT's interconnect with M&N (meter numbers 00215,01215,99855), must have obtained physical supply with the intention of transporting such quantities through these interconnect locations.
With respect to each gas day for the period during which this OFO is in effect, Shippers will be penalized if their highest scheduled quantity for the gas day during any hourly cycle throughout the gas day is reduced such that the scheduled quantity at the end of the gas day is more than 15,000 Dth or 40% (whichever is higher) lower than such highest scheduled quantity. The tolerance of 15,000 Dth or 40% is based on the cumulative scheduled quantity amongst all of the Shipper's contracts (penalty is calculated at a Shipper level rather than each individual contract). With respect to any Shipper whose cumulative scheduled quantity is reduced by more than 15,000 Dth or 40% of its highest scheduled quantity during the gas day compared to the end of the gas day, that Shipper will be assessed a penalty for such gas day for an amount equal to the quantity in dekatherms outside of the tolerance multiplied by three times the daily Platts Gas Daily "Daily Price Survey" posting for the High Common price for "Algonquin, city-gates" for the day on which such violation occurred, as indicated in AGT's General Terms and Conditions Section 26.8. This OFO penalty shall apply unless the Shipper demonstrates to AGT's reasonable satisfaction that the scheduled quantity changes during the applicable gas day were the result of intraday bumping or an abnormal operational issue affecting Customer's supply or market related to the Shipper's highest scheduled quantity for such gas day at the meters listed above.
This OFO will remain in effect until further notice.