Natural Gas Pipeline Icon

SEG 8 (CS 139) HOT TAP INSTALL

Natural Gas Pipeline 2mo ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP/TSP Name:  6931794-NATURAL GAS PIPELINE CO. Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  09/12/2024 2:39:54PM Notice End Date/Time:  10/31/2024 9:00:00am
Post Date/Time:  9/12/2024 2:39:54 PM Notice ID: 45394
Reqrd Rsp:  1 Rsp Date:  09/12/2024
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SEG 8 (CS 139) HOT TAP INSTALL
Notice Text:

COMPRESSOR STATION 139 – HOT TAP INSTALLATION

 

As posted on Natural's Outage Impact Report (X24-965590), Natural will be performing hot tap installation work on the Permian #1 line near Compressor Station 139 (CS 139) located in Lea County, New Mexico (Segment 9 of Natural's Permian Zone).  This work requires Natural to reduce its operating capacity, thus limiting Natural's throughput capacity northbound through Compressor Station 167 (CS 167).

 

The transport scheduling constraint will be at CS 167; therefore, any gas received south of CS 167 for delivery north of CS 167 into Segment 8 will be impacted for the duration of this restriction.  For scheduling purposes, the Permian Pool (LOC 25077) is located south of the constraint.  Additionally, firm transports associated with Permian storage withdrawals will be impacted.

 

As such, effective for gas day, Tuesday, October 1, 2024 only, Natural will schedule Primary Firm and Secondary in-path Firm transports to 72% of contract MDQ northbound through CS 167 from Segment 9 into Segment 8.  AOR/ITS and Secondary out-of-path Firm transports will not be available. 

 

The stated scheduling percentage is based upon the current level of firm capacity contracted for during this restriction and is subject to change based upon operational conditions and Shipper utilization.  Continue to monitor Natural's interactive website for any updates to the end date and/or scheduling percentage during this restriction.

 

Please contact your Account Director or Scheduling Representative if you have any questions.

 

TSP/TSP Name:  6931794-NATURAL GAS PIPELINE CO. Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  09/12/2024 2:39:54PM Notice End Date/Time:  10/31/2024 9:00:00am
Post Date/Time:  9/12/2024 2:39:54 PM Notice ID: 45394
Reqrd Rsp:  1 Rsp Date:  09/12/2024
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  SEG 8 (CS 139) HOT TAP INSTALL
Notice Text:

COMPRESSOR STATION 139 – HOT TAP INSTALLATION

 

As posted on Natural's Outage Impact Report (X24-965590), Natural will be performing hot tap installation work on the Permian #1 line near Compressor Station 139 (CS 139) located in Lea County, New Mexico (Segment 9 of Natural's Permian Zone).  This work requires Natural to reduce its operating capacity, thus limiting Natural's throughput capacity northbound through Compressor Station 167 (CS 167).

 

The transport scheduling constraint will be at CS 167; therefore, any gas received south of CS 167 for delivery north of CS 167 into Segment 8 will be impacted for the duration of this restriction.  For scheduling purposes, the Permian Pool (LOC 25077) is located south of the constraint.  Additionally, firm transports associated with Permian storage withdrawals will be impacted.

 

As such, effective for gas day, Tuesday, October 1, 2024 only, Natural will schedule Primary Firm and Secondary in-path Firm transports to 72% of contract MDQ northbound through CS 167 from Segment 9 into Segment 8.  AOR/ITS and Secondary out-of-path Firm transports will not be available. 

 

The stated scheduling percentage is based upon the current level of firm capacity contracted for during this restriction and is subject to change based upon operational conditions and Shipper utilization.  Continue to monitor Natural's interactive website for any updates to the end date and/or scheduling percentage during this restriction.

 

Please contact your Account Director or Scheduling Representative if you have any questions.