Texas Eastern Transmission Icon

TE Pipeline Conditions for 11/16/2024

Texas Eastern Transmission 5d ago

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
11/16/2024
09:00:00 AM
11/17/2024
09:00:00 AM
155291
Initiate
Capacity Constraint
11/15/2024
03:07:24 PM


No response required


TE Pipeline Conditions for 11/16/2024


Notice Text:

For Gas Day November 16, 2024, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:











Restricted Locations Scheduled and Sealed Priority % Restricted Notes
TABS IT 4B 4A 3 2 1
North of Berne                  
Meter 75660 Receipts(2) Yes







 
Meter 75919 Deliveries
N/A 100% 100% 100% 21%


 
Rec from AGT & Del West of Lambertville
100% 100% 100%




 
TE/AGT Lease Yes






To Lease Capacity
Nexus/TE Leased Meters Yes






To Lease Capacity
30" South of Berne                     
Berne South
N/A 100% 100%




Wheelersburg South(1)
N/A 100% 100% 100% 100% 100% 10% Planned Outage
Danville South
N/A 100% 100%




 
Tompkinsville South
N/A 100% 100%




 
Barton South Yes







 
Meter 73730 Receipts
N/A 100% 100% 100%



 
24"                     
Sarahsville South
N/A 100% 100%




 
Five Points South Yes







 
Lebanon South Yes







 
Access Area                  
Union Church
N/A 100% 100%




 
Receipt Meters 72972, 73073, 72831, 72319
N/A 100%




Planned Outage
Speaks 
N/A 100% 93%




 
Angleton West
N/A 100% 88%




 
                     
TABS Pool Restrictions - Tolerances ETX STX WLA ELA M1-24" M1-30" M2-24" M2-30" M3
TABS Pool - Length 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500
TABS Pool - Short 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000











No-Notice Restrictions




















OFO / Imbalance Notice









OFO No DS - M2-24, M2-30 and M3 effective 11/16/24.  Tolerance 2,000 Dth /8%




Action Alert ---








Customer Specific OFO ---








Imbalance Warnings Stay Balanced - Access Area, M1-24, and M1-30











FERC Order 698 M2-24, M2-30 and M3

















Systemwide Notes:


(1) Due to planned outages along the 30" system, TE anticipates restrictions at Wheelersburg to be between 10 - 14% of P1 nominations.  For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.











(2) Due to current TETLP system operating conditions and limited capacity on lateral 15-H, TE is restricting receipt nominations to approximately 220,000 Dth/d at meter 75660 - UGI APPALACHIA -DRY RIDGE-GREENE CO.,PA(D)73660/(R)73661 until further notice.  TETLP will continue to monitor system operations and nominated receipt volumes for future gas days.  











If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.

TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.











Please contact your Operations Account Representative should you have any questions.


TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
11/16/2024
09:00:00 AM
11/17/2024
09:00:00 AM
155291
Initiate
Capacity Constraint
11/15/2024
03:07:24 PM


No response required


TE Pipeline Conditions for 11/16/2024


Notice Text:

For Gas Day November 16, 2024, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:











Restricted Locations Scheduled and Sealed Priority % Restricted Notes
TABS IT 4B 4A 3 2 1
North of Berne                  
Meter 75660 Receipts(2) Yes







 
Meter 75919 Deliveries
N/A 100% 100% 100% 21%


 
Rec from AGT & Del West of Lambertville
100% 100% 100%




 
TE/AGT Lease Yes






To Lease Capacity
Nexus/TE Leased Meters Yes






To Lease Capacity
30" South of Berne                     
Berne South
N/A 100% 100%




Wheelersburg South(1)
N/A 100% 100% 100% 100% 100% 10% Planned Outage
Danville South
N/A 100% 100%




 
Tompkinsville South
N/A 100% 100%




 
Barton South Yes







 
Meter 73730 Receipts
N/A 100% 100% 100%



 
24"                     
Sarahsville South
N/A 100% 100%




 
Five Points South Yes







 
Lebanon South Yes







 
Access Area                  
Union Church
N/A 100% 100%




 
Receipt Meters 72972, 73073, 72831, 72319
N/A 100%




Planned Outage
Speaks 
N/A 100% 93%




 
Angleton West
N/A 100% 88%




 
                     
TABS Pool Restrictions - Tolerances ETX STX WLA ELA M1-24" M1-30" M2-24" M2-30" M3
TABS Pool - Length 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500 1% or 500
TABS Pool - Short 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000











No-Notice Restrictions




















OFO / Imbalance Notice









OFO No DS - M2-24, M2-30 and M3 effective 11/16/24.  Tolerance 2,000 Dth /8%




Action Alert ---








Customer Specific OFO ---








Imbalance Warnings Stay Balanced - Access Area, M1-24, and M1-30











FERC Order 698 M2-24, M2-30 and M3

















Systemwide Notes:


(1) Due to planned outages along the 30" system, TE anticipates restrictions at Wheelersburg to be between 10 - 14% of P1 nominations.  For future gas days TE will continue to monitor system conditions associated with the posted planned outages along the 30" system.











(2) Due to current TETLP system operating conditions and limited capacity on lateral 15-H, TE is restricting receipt nominations to approximately 220,000 Dth/d at meter 75660 - UGI APPALACHIA -DRY RIDGE-GREENE CO.,PA(D)73660/(R)73661 until further notice.  TETLP will continue to monitor system operations and nominated receipt volumes for future gas days.  











If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.

TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.











Please contact your Operations Account Representative should you have any questions.