UPDATE - Station 80 (Job 455422) Planned Outage and Maintenance Summary
Transco 3mo ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Critical: | Y |
Notice Eff Date: | 08/07/2024 |
Notice Eff Time: | 12:49:16 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 14833243 |
Notice Stat Desc: | Supersede |
Notice Type Desc: | Maint |
Post Date: | 08/07/2024 |
Post Time: | 12:49:16 CDT |
Prior Notice: | 14800670 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: UPDATE - Station 80 (Job 455422) Planned Outage and Maintenance Summary
Transco will be performing necessary planned maintenance associated with Job #455422 on its 2024 Planned Outage and Maintenance Summary. Work going on at this time consists of activities associated with Williams Emissions Reduction Program and the Hard Spot Remediation Program. This maintenance activity requires a compressor station outage and will impact the availability of transportation services. The current schedule for this maintenance is September 1, 2024 through October 30, 2024.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south south to north through the location will not be available.
Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving north to south through this location will not be impacted.
The receipt-based Throughput Section Boundary (TSB) at mainline milepost 740.50 (Station 80) will be used to manage capacity availability including any required changes to the expected total quantity available during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of transportation services during the indicated period.
TSB Name - Location |
Location ID |
Flow Direction |
Total Primary-Firm Quantity Available (Mdt/d) |
Station 80 MP 740.50 |
9012483 |
South to North |
1,926 |
If you have any questions, please contact your Transportation Services Representative.
Critical: | Y |
Notice Eff Date: | 08/07/2024 |
Notice Eff Time: | 12:49:16 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 14833243 |
Notice Stat Desc: | Supersede |
Notice Type Desc: | Maint |
Post Date: | 08/07/2024 |
Post Time: | 12:49:16 CDT |
Prior Notice: | 14800670 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: UPDATE - Station 80 (Job 455422) Planned Outage and Maintenance Summary
Transco will be performing necessary planned maintenance associated with Job #455422 on its 2024 Planned Outage and Maintenance Summary. Work going on at this time consists of activities associated with Williams Emissions Reduction Program and the Hard Spot Remediation Program. This maintenance activity requires a compressor station outage and will impact the availability of transportation services. The current schedule for this maintenance is September 1, 2024 through October 30, 2024.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south south to north through the location will not be available.
Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving north to south through this location will not be impacted.
The receipt-based Throughput Section Boundary (TSB) at mainline milepost 740.50 (Station 80) will be used to manage capacity availability including any required changes to the expected total quantity available during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of transportation services during the indicated period.
TSB Name - Location |
Location ID |
Flow Direction |
Total Primary-Firm Quantity Available (Mdt/d) |
Station 80 MP 740.50 |
9012483 |
South to North |
1,926 |
If you have any questions, please contact your Transportation Services Representative.