UPDATE - Station 175 (Job 557169) 2024 Planned Outage and Maintenance Summary
Transco 3mo ago
All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Critical: | Y |
Notice Eff Date: | 08/19/2024 |
Notice Eff Time: | 08:05:25 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 14861686 |
Notice Stat Desc: | Supersede |
Notice Type Desc: | Maint / Other |
Post Date: | 08/19/2024 |
Post Time: | 08:05:25 CDT |
Prior Notice: | 14759300 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: UPDATE - Station 175 (Job 557169) 2024 Planned Outage and Maintenance Summary
Transco will be performing necessary line outage associated with Job #557169 on its 2024 Planned Outage and Maintenance Summary. This work will require a pipeline segment outage to allow for a pipe replacement project as required by regulation due to recent DOT Class Location changes in this area. This maintenance activity will impact the availability of primary firm transportation services. The current schedule for this maintenance has been updated to July 15, 2024 through August 27, 2024 August 19, 2024.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through the location will not be available.
Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving north to south through the locations listed below. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through this location will not be impacted.
The receipt-based Throughput Section Boundaries (TSB) at mainline milepost 1500 (Station 175) and mainline milepost 1521.82 will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of primary-firm transportation services during the indicated period.
TSB Name - Location |
Location ID |
Flow Direction |
Total Primary-Firm Quantity Available (Mdt/d) |
Mainline MP 1500 TSB |
9011520 |
North to South |
2,100 |
Mainline MP 1521.82 |
9012963 |
North to South |
2,100 |
If you have any questions, please contact your Transportation Services Representative.
Critical: | Y |
Notice Eff Date: | 08/19/2024 |
Notice Eff Time: | 08:05:25 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 14861686 |
Notice Stat Desc: | Supersede |
Notice Type Desc: | Maint / Other |
Post Date: | 08/19/2024 |
Post Time: | 08:05:25 CDT |
Prior Notice: | 14759300 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: UPDATE - Station 175 (Job 557169) 2024 Planned Outage and Maintenance Summary
Transco will be performing necessary line outage associated with Job #557169 on its 2024 Planned Outage and Maintenance Summary. This work will require a pipeline segment outage to allow for a pipe replacement project as required by regulation due to recent DOT Class Location changes in this area. This maintenance activity will impact the availability of primary firm transportation services. The current schedule for this maintenance has been updated to July 15, 2024 through August 27, 2024 August 19, 2024.
During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving north to south through the location will not be available.
Operating Conditions resulting from this work will require Transco to manage primary-firm transportation services moving north to south through the locations listed below. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving south to north through this location will not be impacted.
The receipt-based Throughput Section Boundaries (TSB) at mainline milepost 1500 (Station 175) and mainline milepost 1521.82 will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity of primary-firm transportation services during the indicated period.
TSB Name - Location |
Location ID |
Flow Direction |
Total Primary-Firm Quantity Available (Mdt/d) |
Mainline MP 1500 TSB |
9011520 |
North to South |
2,100 |
Mainline MP 1521.82 |
9012963 |
North to South |
2,100 |
If you have any questions, please contact your Transportation Services Representative.