Equitrans Notice 110394

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

System Wide Notice Detail

TSP Name: EQUITRANS (TSP: 189569585)

12/21/2024 8:12 PM

Page 1 of 1

TSP Name / TSP:

EQUITRANS (189569585)

Post Date/Time:

03-19-2024 04:55:00 PM

Subject:

Gas Quality Notification (Mainline)

Notice Type:

GAS QUALITY

Notice ID:

110394

Notice Status Description:

Initiate

Critical Notice Description:

Critical Notice

Notice Effective Date:

03-19-2024

Notice Effective Time:

04:55:00 PM

Notice End Date:

06-30-2024

Notice End Time:

12:00:00 AM

Required Response Indicator Description:

NO RESPONSE REQUIRED

Notice Text:

Equitrans, LP is notifying customers on its Transmission pipeline system in Mainline Operational Area 4 that due to Downstream Pipeline Gas
Quality specifications Equitrans may no longer permit gas that contains a heating value greater than 1,100 Btus per cubic foot calculated on a
dry basis at 14.73 psia and 60 degree Fahrenheit at receipt points to flow into Mainline Operational Area 4.

This action is pursuant to Section 6.4 [2(vii)] of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. If, at any time, gas tendered by
Customer for transportation or by Equitrans after transportation shall fail to conform to the aforementioned quality specifications and, Equitrans is
unable to blend the gas before it is delivered to the downstream pipelines, Equitrans will refuse to accept delivery pending correction of the
deficiency by the delivering party.

Customers should monitor Equitrans’ Informational Postings website for updates to this notice.

Please contact your Account Manager should you have any questions.

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name: EQUITRANS (TSP: 189569585)
TSP Name / TSP:
EQUITRANS (189569585)
Post Date/Time:
03-19-2024 04:55:00 PM
Subject:
Gas Quality Notification (Mainline)
Notice Type:
GAS QUALITY
Notice ID:
110394
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
03-19-2024
Notice Effective Time:
04:55:00 PM
Notice End Date:
06-30-2024
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Equitrans, LP is notifying customers on its Transmission pipeline system in Mainline Operational Area 4 that due to Downstream Pipeline Gas
Quality specifications Equitrans may no longer permit gas that contains a heating value greater than 1,100 Btus per cubic foot calculated on a
dry basis at 14.73 psia and 60 degree Fahrenheit at receipt points to flow into Mainline Operational Area 4.
This action is pursuant to Section 6.4 [2(vii)] of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. If, at any time, gas tendered by
Customer for transportation or by Equitrans after transportation shall fail to conform to the aforementioned quality specifications and, Equitrans is
unable to blend the gas before it is delivered to the downstream pipelines, Equitrans will refuse to accept delivery pending correction of the
deficiency by the delivering party.
Customers should monitor Equitrans’ Informational Postings website for updates to this notice.
Please contact your Account Manager should you have any questions.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
12/21/2024 8:12 PM
Page 1 of 1