TSP Name: EQUITRANS (TSP: 189569585)

9/16/2024 4:39 PM

Page 1 of 2

TSP Name / TSP:

EQUITRANS (189569585)

Post Date/Time:

07-18-2024 06:40:00 PM

Subject:

Corona Compressor Station Maintenance 08-13-24

Notice Type:

PLANNED SERVICE OUTAGE/CAPACITY CONSTRAINT

Notice ID:

113637

Notice Status Description:

Initiate

Critical Notice Description:

Critical Notice

Notice Effective Date:

07-18-2024

Notice Effective Time:

06:40:00 PM

Notice End Date:

10-31-2024

Notice End Time:

12:00:00 AM

Required Response Indicator Description:

NO RESPONSE REQUIRED

System Wide Notice Detail

TSP Name: EQUITRANS (TSP: 189569585)

9/16/2024 4:39 PM

Page 2 of 2

Notice Text:

Equitrans L.P. will perform maintenance at its Plasma and Corona Compressor Stations in its Mainline Operational Area 3 beginning August 13,
2024, Gas Day, and continuing through August 15, 2024, Gas Day.
In conjunction with this maintenance, the following Operationally Available Capacity reductions will be in effect for August 13, 2024, Gas Day
through August 15, 2024, Gas Days.

Operationally Available Capacity through the Corona_CS Meter will be reduced to 345,000 Dths.

Operationally Available Capacity through the Plasma_OVC Meter will be reduced to a Net Delivered Operational Capacity of 1,000,000 Dths.

Net Delivered Dths are calculated by netting Receipt and Delivery Scheduled Quantities at the Plasma _OVC Meter listed above.

Operationally Available Capacity on its H-509 and H-508 Pipelines in its Mainline Operational Area 4 will be reduced to 120,000 Dths. The
Impacted meters are as listed:

#24577 (Statler)
#24624 (Morrison)
#24479 (Wilsonburg I)
#5100117 (Wilsonburg II)
#M5209978 (Jarvisville)
#M5436771 (Valley Chapel)

Total scheduled quantities for the above 6 meters will be scheduled not to exceed 120,000 Dths.

Scheduled Quantities will be adjusted to not exceed these amounts. Amounts are based on projected operating conditions and are subject to
change.

Customers may experience higher than normal pressures on the following pipelines in Mainline Operational Area 3 and Mainline Operational
Area 4: H-302, H-306, GSF-912, GSF-993, H-557, GSF-604, H-527, H-515, H-518, H-511, H-509, H-508, H-115, and H-111.

Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. Intraday
nomination changes may be required should the actual outage timeframe or level of impact differ from the estimates stated in this notification.

Customers should monitor Equitrans’ Informational Postings Website for updates to this notice, and applicable posted Operationally Available
Capacity.

*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.

System Wide Notice Detail
TSP Name: EQUITRANS (TSP: 189569585)
TSP Name / TSP:
EQUITRANS (189569585)
Post Date/Time:
07-18-2024 06:40:00 PM
Subject:
Corona Compressor Station Maintenance 08-13-24
Notice Type:
PLANNED SERVICE OUTAGE/CAPACITY CONSTRAINT
Notice ID:
113637
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
07-18-2024
Notice Effective Time:
06:40:00 PM
Notice End Date:
10-31-2024
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
NO RESPONSE REQUIRED
9/16/2024 4:39 PM
Page 1 of 2

System Wide Notice Detail
TSP Name: EQUITRANS (TSP: 189569585)
Notice Text:
Equitrans L.P. will perform maintenance at its Plasma and Corona Compressor Stations in its Mainline Operational Area 3 beginning August 13,
2024, Gas Day, and continuing through August 15, 2024, Gas Day.
In conjunction with this maintenance, the following Operationally Available Capacity reductions will be in effect for August 13, 2024, Gas Day
through August 15, 2024, Gas Days.
Operationally Available Capacity through the Corona_CS Meter will be reduced to 345,000 Dths.
Operationally Available Capacity through the Plasma_OVC Meter will be reduced to a Net Delivered Operational Capacity of 1,000,000 Dths.
Net Delivered Dths are calculated by netting Receipt and Delivery Scheduled Quantities at the Plasma _OVC Meter listed above.
Operationally Available Capacity on its H-509 and H-508 Pipelines in its Mainline Operational Area 4 will be reduced to 120,000 Dths. The
Impacted meters are as listed:
#24577 (Statler)
#24624 (Morrison)
#24479 (Wilsonburg I)
#5100117 (Wilsonburg II)
#M5209978 (Jarvisville)
#M5436771 (Valley Chapel)
Total scheduled quantities for the above 6 meters will be scheduled not to exceed 120,000 Dths.
Scheduled Quantities will be adjusted to not exceed these amounts. Amounts are based on projected operating conditions and are subject to
change.
Customers may experience higher than normal pressures on the following pipelines in Mainline Operational Area 3 and Mainline Operational
Area 4: H-302, H-306, GSF-912, GSF-993, H-557, GSF-604, H-527, H-515, H-518, H-511, H-509, H-508, H-115, and H-111.
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff. Intraday
nomination changes may be required should the actual outage timeframe or level of impact differ from the estimates stated in this notification.
Customers should monitor Equitrans’ Informational Postings Website for updates to this notice, and applicable posted Operationally Available
Capacity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
9/16/2024 4:39 PM
Page 2 of 2