Equitrans Notice 120799
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
System Wide Notice Detail
TSP Name: EQUITRANS (TSP: 189569585)
4/4/2025 8:34 AM
Page 1 of 1
TSP Name / TSP:
EQUITRANS (189569585)
Post Date/Time:
03-11-2025 12:58:00 PM
Subject:
Blacksville Compressor Station Maintenance 03-25-25
Notice Type:
CAPACITY CONSTRAINT
Notice ID:
120799
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
03-25-2025
Notice Effective Time:
10:00:00 AM
Notice End Date:
03-26-2025
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Equitrans L.P. will perform maintenance at its Blacksville Compressor Station in its Mainline Operational Area 3 beginning at 10:00 AM ET on
March 25, 2025.
In conjunction with this maintenance, its H-508 and H-509 Pipelines in its Mainline Operational Area 4 is expected to experience higher than
normal pipeline pressure, along with reductions in flow. The maintenance is scheduled to begin at 10:00 AM ET and has an estimated duration
of 4 hours. Combined flow total on the H-508 and H-509 Pipelines during the maintenance is estimated to be 65,000 Dths.
Additionally, for March 25, 2025, Gas Day, the Operationally Available Capacity on its H-508 and H-509 Pipelines in its Mainline Operational
Area 4 will be reduced to 145,000 Dths.
The Impacted meters are as listed:
#24577 (Statler)
#24624 (Morrison)
#24479 (Wilsonburg I)
#5100117 (Wilsonburg II)
#M5209978 (Jarvisville)
#M5436771 (Valley Chapel)
Total scheduled quantities for the above six meters will be scheduled not to exceed 145,000 Dths for March 25, 2025, Gas Day.
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff.? Intraday
nomination changes may be required should the actual outage timeframe or level of impact differ from the estimates stated in this notification.
Customers should monitor Equitrans’ Informational Postings Website for updates to this notice, and applicable posted Operationally Available
Capacity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
TSP Name: EQUITRANS (TSP: 189569585)
TSP Name / TSP:
EQUITRANS (189569585)
Post Date/Time:
03-11-2025 12:58:00 PM
Subject:
Blacksville Compressor Station Maintenance 03-25-25
Notice Type:
CAPACITY CONSTRAINT
Notice ID:
120799
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
03-25-2025
Notice Effective Time:
10:00:00 AM
Notice End Date:
03-26-2025
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Equitrans L.P. will perform maintenance at its Blacksville Compressor Station in its Mainline Operational Area 3 beginning at 10:00 AM ET on
March 25, 2025.
In conjunction with this maintenance, its H-508 and H-509 Pipelines in its Mainline Operational Area 4 is expected to experience higher than
normal pipeline pressure, along with reductions in flow. The maintenance is scheduled to begin at 10:00 AM ET and has an estimated duration
of 4 hours. Combined flow total on the H-508 and H-509 Pipelines during the maintenance is estimated to be 65,000 Dths.
Additionally, for March 25, 2025, Gas Day, the Operationally Available Capacity on its H-508 and H-509 Pipelines in its Mainline Operational
Area 4 will be reduced to 145,000 Dths.
The Impacted meters are as listed:
#24577 (Statler)
#24624 (Morrison)
#24479 (Wilsonburg I)
#5100117 (Wilsonburg II)
#M5209978 (Jarvisville)
#M5436771 (Valley Chapel)
Total scheduled quantities for the above six meters will be scheduled not to exceed 145,000 Dths for March 25, 2025, Gas Day.
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Equitrans’ FERC Gas Tariff.? Intraday
nomination changes may be required should the actual outage timeframe or level of impact differ from the estimates stated in this notification.
Customers should monitor Equitrans’ Informational Postings Website for updates to this notice, and applicable posted Operationally Available
Capacity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
4/4/2025 8:34 AM
Page 1 of 1