High Island Offshore System Notice 3146

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP
87740031

TSP Name
HIGH ISLAND OFFSHORE SYSTEM LLC

Notice Identifier
3146

Critical Notice Description (Critical Desc)
OPER ALERT

Notice Effective Date/Time
07/14/2023 12:00 am

Notice End Date/Time
07/31/2023 12:00 am

Prior Notice


Notice Stat Desc
Critical notice

Notice Type
Critical notice

Required Response Indicator Description
NO RESPONSE REQUIRED

Posting Date/Time
07/14/2023 9:46 am

Subject
Emergency Shut In And Blowdown of HIOS Pipeline - Update #2

Notice Text
EMERGENCY SHUT IN AND BLOWDOWN OF HIOS PIPELINE - UPDATE #2

HIOS is continuing the repairs on the leak at WC167. In addition to the current work, it has been identified that repairs are needed on certain equipment on the topside. This will require ALL platforms to shut down immediately with the exception of buyback meters. Buyback meters are not affected and may continue operations as normal. Platforms are being notified by Gas Control to shut down. Currently the expected duration is 4-7 days. Information will be posted as it becomes available.





TSP
87740031

TSP Name
HIGH ISLAND OFFSHORE SYSTEM LLC

Notice Identifier
3146

Critical Notice Description (Critical Desc)
OPER ALERT

Notice Effective Date/Time
07/14/2023 12:00 am

Notice End Date/Time
07/31/2023 12:00 am

Prior Notice


Notice Stat Desc
Critical notice

Notice Type
Critical notice

Required Response Indicator Description
NO RESPONSE REQUIRED

Posting Date/Time
07/14/2023 9:46 am

Subject
Emergency Shut In And Blowdown of HIOS Pipeline - Update #2

Notice Text
EMERGENCY SHUT IN AND BLOWDOWN OF HIOS PIPELINE - UPDATE #2

HIOS is continuing the repairs on the leak at WC167. In addition to the current work, it has been identified that repairs are needed on certain equipment on the topside. This will require ALL platforms to shut down immediately with the exception of buyback meters. Buyback meters are not affected and may continue operations as normal. Platforms are being notified by Gas Control to shut down. Currently the expected duration is 4-7 days. Information will be posted as it becomes available.