High Island Offshore System Notice 3148

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP
87740031

TSP Name
HIGH ISLAND OFFSHORE SYSTEM LLC

Notice Identifier
3148

Critical Notice Description (Critical Desc)
OPER ALERT

Notice Effective Date/Time


Notice End Date/Time


Prior Notice


Notice Stat Desc
Critical notice

Notice Type
Critical notice

Required Response Indicator Description
NO RESPONSE REQUIRED

Posting Date/Time
07/19/2023 1:55 pm

Subject
Emergency Shut In And Blowdown of HIOS Pipeline

Notice Text
Emergency Shut In And Blowdown of HIOS Pipeline

HIOS has been notified that a recent leak repair at HIA 264A has failed. The facility has been isolated and operations is in the process of blowing down the topside piping. At this time all platforms are being notified to shut in until further notice. All buyback meters will be allowed to continue to pull volumes until further notice, but no injections will be allowed to offset the buyback volumes. The estimated downtime of the facililty is unknown at this time, updates will be posted when the repair options are assessed. All nominations will need to be taken down to EPSQ for day 19 and zero for day 20 forward until further notice. Information will be posted as it becomes available.



TSP
87740031

TSP Name
HIGH ISLAND OFFSHORE SYSTEM LLC

Notice Identifier
3148

Critical Notice Description (Critical Desc)
OPER ALERT

Notice Effective Date/Time


Notice End Date/Time


Prior Notice


Notice Stat Desc
Critical notice

Notice Type
Critical notice

Required Response Indicator Description
NO RESPONSE REQUIRED

Posting Date/Time
07/19/2023 1:55 pm

Subject
Emergency Shut In And Blowdown of HIOS Pipeline

Notice Text
Emergency Shut In And Blowdown of HIOS Pipeline

HIOS has been notified that a recent leak repair at HIA 264A has failed. The facility has been isolated and operations is in the process of blowing down the topside piping. At this time all platforms are being notified to shut in until further notice. All buyback meters will be allowed to continue to pull volumes until further notice, but no injections will be allowed to offset the buyback volumes. The estimated downtime of the facililty is unknown at this time, updates will be posted when the repair options are assessed. All nominations will need to be taken down to EPSQ for day 19 and zero for day 20 forward until further notice. Information will be posted as it becomes available.