Millennium Pipeline Notice 25922042
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
|
TSP Name
Millennium Pipeline Company, L.L.C.
TSP
607821050
Date
Time
Notice ID
25922042
Notice Type Description: Operational Flow Order
Notice Stat Desc: Supersede
Prior Notice: 25922019
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
12/06/24
12/06/24
01/06/25
10:17:10 AM
12:00:00 AM
12:00:00 AM
Subject: LIFTED: Operational Flow Order Effective Gas Day Saturday, December 7, 2024
Author: Bonnie Carroll
Notice Text
Millennium Pipeline Company (MPC) notifies shippers that the previously posted Operational Flow Order is hereby lifted effective Timely Cycle Gas Day, December 7, 2024. However, the Operational Alert will remain in place until further notice. Segment Restrictions: Forward-haul Secondary out of path (SOP), and Interruptible (IT) transactions through the Wagoner East segment (PTJRWARW) and Minisink (MINISINK) will remain in effect. Imbalance Payback: MPC reserves the right to enact any restrictions necessary to maintain system integrity and operational performance. AutoPAL Reminder: AutoPAL Parks: 3,000 dthAutoPAL Loans: 3,000 dth MPC reminds customers the intent of the AutoPAL service is to utilize nominal quantities to resolve minor pool imbalances that result from small upstream or downstream reductions during the cycles of the Gas Day. These quantities are then paid back the next cycle of the Gas Day. AutoPAL should not be used for parking or loaning large quantities.
***Previous Posting***
As part of its commitment to communicate current operating conditions to customers, MPC will be elevating the current Operational Alert to include an equalization OFO. Millennium Pipeline Company, LLC (MPC) hereby notifies customers that system flexibility is projected to be limited with the forecasted sustained colder temperatures across the MPC service territory. As a result, MPC is issuing an Operational Flow Order (OFO) pursuant to the provisions of Section 17 of the General Terms and Conditions of its FERC Gas Tariff. (1) Date of issuance: November 26, 2024.(2) The OFO will become effective for Timely (TIM) cycle Gas Day Friday, November 29, 2024.(3) This OFO will remain in effect until further notice.(4) This OFO applies to all shippers. However, receipt and delivery point operators should be aware of the requirements of this OFO to avoid adverse impacts to their customers.(5) During the effectiveness of this OFO, shippers must equalize receipts and deliveries, both on an hourly and daily basis. To avoid adverse impacts to their customers, receipt point operators must ensure that actual receipts of gas into the system are equal to or greater than scheduled receipts and delivery point operators must ensure that actual deliveries off the system are equal to or less than scheduled deliveries. Pursuant to Section 9.1 of the GT&C, MPC may refuse to deliver a shipper’s gas at a delivery point if shipper or shipper’s upstream transporter is unable to provide equivalent quantities to MPC at the receipt point. Receipt point operators should flow 98% of scheduled quantities to prevent the potential for further action. MPC reminds power plant operators that they should provide information mandated by FERC Order No. 698. Information required includes the hourly consumption profile of directly connected power generation facilities. To avoid additional restrictions, shippers should adhere as closely as practicable to ratable hourly takes or increase nominations to ensure that hourly deliveries generally match hourly takes. (6) This OFO is necessary in order to maintain system pressures, integrity and reliability. Failure to adhere to this OFO could result in penalties and/or additional restrictions. Penalties:Pursuant to Section 19.3 of MPC’s Tariff, if a Shipper fails to comply with the OFO, a penalty will be assessed on all quantities taken or delivered in violation of the OFO based on a price per Dth equal to the greater of twenty-five dollars ($25.00) or three times the midpoint of the range of prices reported for "Texas Eastern, M-3 City-gate Index Price" as published in Platts Gas Daily price survey for the days on which the Operational Flow Order is issued. In assessing penalties, underdeliveries will be prorated among shippers that nominated receipts at the underdelivering point, unless the point operator provides more specific information to MPC Point RestrictionsNone Segment RestrictionsForward-haul Secondary out of path (SOP), and Interruptible (IT) transactions through the Wagoner East segment (PTJRWARW) and Minisink (MINISINK) will not be scheduled. AutoPAL Reminder:Starting with the Timely cycle for each Gas Day the AutoPAL limit will be: AutoPAL Parks: 3,000 dths
AutoPAL Loans: 3,000 dths
Millennium Pipeline Company, L.L.C.
TSP
607821050
Date
Time
Notice ID
25922042
Notice Type Description: Operational Flow Order
Notice Stat Desc: Supersede
Prior Notice: 25922019
Critical: Y
Reqrd Rsp Desc: No Response Required
Post
Notice Effective
Notice End
Response
12/06/24
12/06/24
01/06/25
10:17:10 AM
12:00:00 AM
12:00:00 AM
Subject: LIFTED: Operational Flow Order Effective Gas Day Saturday, December 7, 2024
Author: Bonnie Carroll
Notice Text
Millennium Pipeline Company (MPC) notifies shippers that the previously posted Operational Flow Order is hereby lifted effective Timely Cycle Gas Day, December 7, 2024. However, the Operational Alert will remain in place until further notice. Segment Restrictions: Forward-haul Secondary out of path (SOP), and Interruptible (IT) transactions through the Wagoner East segment (PTJRWARW) and Minisink (MINISINK) will remain in effect. Imbalance Payback: MPC reserves the right to enact any restrictions necessary to maintain system integrity and operational performance. AutoPAL Reminder: AutoPAL Parks: 3,000 dthAutoPAL Loans: 3,000 dth MPC reminds customers the intent of the AutoPAL service is to utilize nominal quantities to resolve minor pool imbalances that result from small upstream or downstream reductions during the cycles of the Gas Day. These quantities are then paid back the next cycle of the Gas Day. AutoPAL should not be used for parking or loaning large quantities.
***Previous Posting***
As part of its commitment to communicate current operating conditions to customers, MPC will be elevating the current Operational Alert to include an equalization OFO. Millennium Pipeline Company, LLC (MPC) hereby notifies customers that system flexibility is projected to be limited with the forecasted sustained colder temperatures across the MPC service territory. As a result, MPC is issuing an Operational Flow Order (OFO) pursuant to the provisions of Section 17 of the General Terms and Conditions of its FERC Gas Tariff. (1) Date of issuance: November 26, 2024.(2) The OFO will become effective for Timely (TIM) cycle Gas Day Friday, November 29, 2024.(3) This OFO will remain in effect until further notice.(4) This OFO applies to all shippers. However, receipt and delivery point operators should be aware of the requirements of this OFO to avoid adverse impacts to their customers.(5) During the effectiveness of this OFO, shippers must equalize receipts and deliveries, both on an hourly and daily basis. To avoid adverse impacts to their customers, receipt point operators must ensure that actual receipts of gas into the system are equal to or greater than scheduled receipts and delivery point operators must ensure that actual deliveries off the system are equal to or less than scheduled deliveries. Pursuant to Section 9.1 of the GT&C, MPC may refuse to deliver a shipper’s gas at a delivery point if shipper or shipper’s upstream transporter is unable to provide equivalent quantities to MPC at the receipt point. Receipt point operators should flow 98% of scheduled quantities to prevent the potential for further action. MPC reminds power plant operators that they should provide information mandated by FERC Order No. 698. Information required includes the hourly consumption profile of directly connected power generation facilities. To avoid additional restrictions, shippers should adhere as closely as practicable to ratable hourly takes or increase nominations to ensure that hourly deliveries generally match hourly takes. (6) This OFO is necessary in order to maintain system pressures, integrity and reliability. Failure to adhere to this OFO could result in penalties and/or additional restrictions. Penalties:Pursuant to Section 19.3 of MPC’s Tariff, if a Shipper fails to comply with the OFO, a penalty will be assessed on all quantities taken or delivered in violation of the OFO based on a price per Dth equal to the greater of twenty-five dollars ($25.00) or three times the midpoint of the range of prices reported for "Texas Eastern, M-3 City-gate Index Price" as published in Platts Gas Daily price survey for the days on which the Operational Flow Order is issued. In assessing penalties, underdeliveries will be prorated among shippers that nominated receipts at the underdelivering point, unless the point operator provides more specific information to MPC Point RestrictionsNone Segment RestrictionsForward-haul Secondary out of path (SOP), and Interruptible (IT) transactions through the Wagoner East segment (PTJRWARW) and Minisink (MINISINK) will not be scheduled. AutoPAL Reminder:Starting with the Timely cycle for each Gas Day the AutoPAL limit will be: AutoPAL Parks: 3,000 dths
AutoPAL Loans: 3,000 dths