Mountain Valley Pipeline Notice 112819
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
System Wide Notice Detail
TSP Name: MOUNTAIN VALLEY PIPELINE LLC (TSP: 062498393)
12/21/2024 8:01 PM
Page 1 of 1
TSP Name / TSP:
MOUNTAIN VALLEY PIPELINE LLC (062498393)
Post Date/Time:
06-19-2024 04:30:00 PM
Subject:
H-600 Pipeline Pig Run (Mobley Run IC to Bradshaw CS) 07-09-24
Notice Type:
PLANNED SERVICE OUTAGE/CAPACITY CONSTRAINT
Notice ID:
112819
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
06-19-2024
Notice Effective Time:
04:30:00 PM
Notice End Date:
09-30-2024
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Mountain Valley Pipeline, LLC will be conducting pipeline pigging on its H-600 Pipeline between Mobley Run IC and Bradshaw CS beginning at
10:00 AM ET on July 09, 2024.
In conjunction with this pigging, Operational Available Capacity at Meter 50004N (Great Hammerhead) will be reduced to 0 Dths and Operational
Available Capacity at Meter 50002N (ML_MVP) will be reduced to 725,000 Dths for July 09, 2024, Gas Day.
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Mountain Valley Pipeline’s FERC Gas
Tariff; scheduled quantities will be adjusted to not exceed the amounts designated above.
Customers should monitor Mountain Valley Pipeline’s Informational Postings Website for updates to this notice and applicable posted
Operationally Available Capacity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
TSP Name: MOUNTAIN VALLEY PIPELINE LLC (TSP: 062498393)
TSP Name / TSP:
MOUNTAIN VALLEY PIPELINE LLC (062498393)
Post Date/Time:
06-19-2024 04:30:00 PM
Subject:
H-600 Pipeline Pig Run (Mobley Run IC to Bradshaw CS) 07-09-24
Notice Type:
PLANNED SERVICE OUTAGE/CAPACITY CONSTRAINT
Notice ID:
112819
Notice Status Description:
Initiate
Critical Notice Description:
Critical Notice
Notice Effective Date:
06-19-2024
Notice Effective Time:
04:30:00 PM
Notice End Date:
09-30-2024
Notice End Time:
12:00:00 AM
Required Response Indicator Description:
NO RESPONSE REQUIRED
Notice Text:
Mountain Valley Pipeline, LLC will be conducting pipeline pigging on its H-600 Pipeline between Mobley Run IC and Bradshaw CS beginning at
10:00 AM ET on July 09, 2024.
In conjunction with this pigging, Operational Available Capacity at Meter 50004N (Great Hammerhead) will be reduced to 0 Dths and Operational
Available Capacity at Meter 50002N (ML_MVP) will be reduced to 725,000 Dths for July 09, 2024, Gas Day.
Nominations will be scheduled in accordance with Section 6.8 of the General Terms and Conditions of Mountain Valley Pipeline’s FERC Gas
Tariff; scheduled quantities will be adjusted to not exceed the amounts designated above.
Customers should monitor Mountain Valley Pipeline’s Informational Postings Website for updates to this notice and applicable posted
Operationally Available Capacity.
*This data represents data available within the last 3 months. For prior data to this time period, please contact your customer service representative.
12/21/2024 8:01 PM
Page 1 of 1