Tennessee Gas Pipeline Notice 392128
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
Notice Type Desc (1): MAINTENANCE | Notice Type Desc (2): MAINTENANCE |
Notice Eff Date/Time: 08/29/2024 3:56:11PM | Notice End Date/Time: 08/30/2024 9:00:00am |
Post Date/Time: 8/29/2024 3:56:11 PM | Notice ID: 392128 |
Reqrd Rsp: 1 | Rsp Date: 08/29/2024 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: TGP Outage Impact Report |
|
|
|
|
|
|
|
|||
|
|
|
TGP - Outage Impact Report |
|
|
|
-Major impact restrictions may be necessary |
||
|
|
Seven Day Forecast (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
||||
|
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
||||
Station / Seg |
Est Nominal Operating Capacity (Thousand Dth) |
Monday (9/2) |
Tuesday (9/3) |
Wednesday (9/4) |
Thursday (9/5) |
Friday (9/6) |
Saturday (9/7) |
Sunday (9/8) |
Primary Outage(s) that may Impact Throughput |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||||
Station 409 (Donna Line) (segment 490 FH) |
519 |
519 |
519 |
519 |
519 |
519 |
519 |
519 |
|
Station 1 (segment 101 BH) |
400 |
400 |
400 |
400 |
400 |
400 |
400 |
400 |
|
Station 9 (segment 109 BH) |
1,028 |
962 (66) |
962 (66) |
962 (66) |
962 (66) |
962 (66) |
1018 (10) |
1018 (10) |
MLV 3-1 TO MLV 4-1: Class Change / Wrinkle Bend Replacement (M) (7/23/2024 - 9/23/2024) MLV 6-1 to MLV 7-1: Anomaly Remediation (8/6/2024 - 9/6/2024) |
Station 17 (segment 117 BH) |
873 |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
873 |
842 (31) |
723 (150) |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
MLV 18-2A TO MLV 20-2A: Class Change / Wrinkle Bend Replacement (M) (8/27/2024 - 10/31/2024) MLV 25-2 to MLV 32-2: Pig Run - Maintenance (9/3/2024) |
Station 40 South (segment 132 BH) |
873 |
873 |
628 (245) |
873 |
873 |
863 (10) |
863 (10) |
863 (10) |
MLV 36-1A TO MLV 37-1: Hydrotest (9/6/2024 - 9/16/2024) MLV 36-1LA to MLV 40-1S: Pig Run - Maintenance (9/3/2024) |
Station 47 (segment 143 BH) |
1,016 |
1,016 |
771 (245) |
366 (650) |
671 (345) |
671 (345) |
671 (345) |
671 (345) |
MLV 40-3 to MLV 47-3: Pig Run - Maintenance (9/4/2024) MLV 40-4 to MLV 47-4: Pig Run - Maintenance (9/5/2024) MLV 41-2A to MLV 42-2: Make Piggable (9/7/2024 - 9/14/2024) MLV 50-3 to MLV 51-3: Anomaly Remediation (9/4/2024 - 9/13/2024) MLV 53-3 to MLV 53-3CR: Anomaly Remediation (9/4/2024 - 9/13/2024) Sta 54: Station PLC - Controls Upgrade (9/3/2024 - 9/27/2024) Sta 54: Unit 1D - Controls Upgrade (9/3/2024 - 9/20/2024) |
Station 63 (segment 163 BH) |
1,169 |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) MLV 58-1 to MLV 60-1: Shallow Pipe Replacement (9/3/2024 - 10/31/2024) MLV 77-2 to MLV 77-2A: Class Change / Pipe Replacement (8/12/2024 - 10/1/2024) Sta 63: Unit 2D - 60K hour inspections (8/26/2024 - 10/11/2024) |
Station 823 (segment 823 BH) |
686 |
686 |
686 |
686 |
686 |
686 |
686 |
686 |
|
Station 834 (segment 834 BH) |
679 |
670 (9) |
670 (9) |
670 (9) |
670 (9) |
670 (9) |
679 |
679 |
Sta 834: Unit 3A - 12K Engine Inspection (8/26/2024 - 9/6/2024) |
MLV 524 (segment 524 FH) |
335 |
280 (55) |
280 (55) |
280 (55) |
280 (55) |
280 (55) |
335 |
335 |
MLV 532-2 to MLV 533-2: Anomaly Remediation (9/2/2024 - 9/6/2024) |
MLV 548 (segment 542 BH) |
1,605 |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) Sta 542: Unit 3A - Overhaul (2/12/2024 - 9/30/2024) Sta 546: Unit 3A - Discharge Valve (4/30/2024 - 10/31/2024) Sta 546: Unit 3A - Overhaul (2/15/2024 - 9/30/2024) |
Station 860 (segment 548 BH) |
1,523 |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
Sta 555: Unit 3A - Exhaust System (9/2/2024 - 9/20/2024) Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
Station 860 North (Segment 860 BH) |
1,800 |
1615 (185) |
1615 (185) |
1615 (185) |
1615 (185) |
1615 (185) |
1700 (100) |
1700 (100) |
MLV 564-1 to MLV 565-1: Class Change (6/26/2024 - 9/13/2024) Sta 860: Force Majeure (8/18/2023 - TBD) Sta 860: Unit 1A - After Cooler (6/17/2024 - 9/30/2024) Sta 860: Unit 5A - Crank-end Head Gasket (6/17/2024 - 9/6/2024) |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,630 |
2400 (230) |
2400 (230) |
2400 (230) |
2400 (230) |
2400 (230) |
2150 (480) |
2150 (480) |
MLV 103-3 to MLV 104-3: Anomaly Remediation (9/7/2024 - 9/18/2024) MLV 105-3 to MLV 106-3: Anomaly Remediation (8/26/2024 - 9/6/2024) St 87: Unit 2E - Replace Engine Heads (7/22/2024 - 9/16/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 2B - Zero Base Engine Overhaul (8/6/2024 - 10/31/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) Sta 871: Unit 3A - Power Side Overhaul (7/22/2024 - 10/10/2024) |
Station 114 (segment 114 BH) |
918 |
918 |
918 |
918 |
918 |
918 |
918 |
918 |
|
Station 204 (Segment 204 BH) |
1,827 |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
MLV 200-2DBL to MLV 200-2A: Make Piggable / Replacement (M) (9/4/2024 - 9/14/2024) MLV 214-3L to MLV 215-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) MLV 215-3 to MLV 216-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) Sta 204: Operational Conditions (7/1/2024 - 9/30/2024) Sta 204: Unit 3A - Crankcase Inspection (9/3/2024 - 9/5/2024) Sta 209: Unit 3A - Crankcase Inspection (9/3/2024 - 9/5/2024) Sta 214: Unit 10A - Compressor Cylinder (7/8/2024 - 9/14/2024) Sta 214: Unit 8A - Oil System (9/21/2023 - 9/13/2024) |
Station 245 (segment 245 FH) |
998 |
998 |
998 |
998 |
998 |
998 |
998 |
998 |
|
|
|
|
|
|
|
|
-Primary impact restrictions may be necessary |
||
|
|
|
TGP - Outage Impact Report |
|
|
|
-Major impact restrictions may be necessary |
||
|
|
Seven Day Forecast (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
||||
|
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
||||
Station / Seg |
Est Nominal Operating Capacity (Thousand Dth) |
Monday (9/2) |
Tuesday (9/3) |
Wednesday (9/4) |
Thursday (9/5) |
Friday (9/6) |
Saturday (9/7) |
Sunday (9/8) |
Primary Outage(s) that may Impact Throughput |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||||
MLV 256 West (segment 249 FH) |
1,213 |
1,213 |
1,213 |
1145 (68) |
1,213 |
1,213 |
1,213 |
1,213 |
Sta 249: Unit 1A - Engine Frame (9/4/2024) |
Station 261 Discharge East (segment 261 FH) |
935 |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
Sta 264: Unit 1C & 2C Overhauls and Control System Upgrades (8/26/2024 - 9/20/2024) |
Station 307 (segment 307 BH) |
1,154 |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
Sta 219: Unit 1B - Engine Upgrade (6/10/2024 - 10/1/2024) Sta 307: Unit 6A - Engine Upgrade (7/11/2024 - 10/26/2024) |
MLV 314 EAST (segment 314 BH) |
1,770 |
1400 (370) |
1400 (370) |
1400 (370) |
1400 (370) |
1400 (370) |
1,770 |
1,770 |
MLV 313-1 to MLV 314-1: Hot Tap for New Meter Station - Greylock Potter Meter (9/2/2024 - 9/6/2024) |
Station 315 (segment 315 BH) |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
|
MLV 324 (segment 324 FH) |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
|
MLV 336 East (segment 336 FH) |
153 |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
MLV 337-1 to MLV 338-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 339-1 to MLV 340-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 340-1 to MLV 341-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 341-1 to MLV 342-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 342-1 to MLV 343-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 343-1 to MLV 344-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 344-1 to MLV 345-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
MLV 345 North of Derby Lateral (segment 355 BH) |
48 |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
MLV 346-1 to MLV 347-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 349-1 to MLV 350-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
Station 405 HC Line (segment 299 FH) |
803 |
803 |
803 |
803 |
803 |
803 |
803 |
803 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
||||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 409 (Donna Line) (segment 490 FH) |
519 |
|
519 |
519 |
519 |
|
Station 1 (segment 101 BH) |
400 |
|
400 |
400 |
400 |
|
Station 9 (segment 109 BH) |
1,028 |
|
663 (365) |
663 (365) |
1018 (10) |
MLV 3-1 TO MLV 4-1: Class Change / Wrinkle Bend Replacement (M) (7/23/2024 - 9/23/2024) MLV 5-2 to MLV 1-2D: Pig Runs - Cleaning 9/10/24 (M) (9/10/2024) MLV 5-2 to MLV 1-2D: Pig Runs - Cleaning 9/9/24 (M) (9/9/2024) MLV 5-2 to MLV 1-2D: Pig Runs - MFL-A 9/11/24 (M) (9/11/2024) MLV 9-1D to MLV 17-1S: Pig Runs - Cleaning 9/17/24 (M) (9/17/2024) MLV 9-1D to MLV 17-1S: Pig Runs - Cleaning/Gauge 9/16/24 (M) (9/16/2024) MLV 9-1D to MLV 17-1S: Pig Runs - MDS Tool with IMU/XYZ 9/19/24 (M) (9/19/2024) |
Station 17 (segment 117 BH) |
873 |
|
828 (45) |
828 (45) |
828 (45) |
Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
873 |
|
842 (31) |
842 (31) |
842 (31) |
MLV 18-2A TO MLV 20-2A: Class Change / Wrinkle Bend Replacement (M) (8/27/2024 - 10/31/2024) |
Station 40 South (segment 132 BH) |
873 |
|
643 (230) |
848 (25) |
838 (35) |
MLV 36-1A TO MLV 37-1: Hydrotest (9/6/2024 - 9/16/2024) MLV 36-2 TO MLV 36-2A: Special Permit / Pipe Replacement (9/17/2024 - 9/23/2024) MLV 36-3 TO MLV 36-3A: Special Permit / Pipe Replacement (9/26/2024 - 10/10/2024) Sta 32: Annual ESD Test & Electrical Inspection (9/9/2024 - 9/13/2024) |
Station 47 (segment 143 BH) |
1,016 |
|
386 (630) |
738 (278) |
731 (285) |
MLV 41-2A to MLV 42-2: Make Piggable (9/7/2024 - 9/14/2024) MLV 46-1 to MLV 46-1BR: Class Change (9/16/2024 - 10/18/2024) MLV 50-2 to MLV 51-2: Crossover Valve Replacement (9/23/2024 - 10/4/2024) MLV 50-3 to MLV 51-3: Anomaly Remediation (9/4/2024 - 9/13/2024) MLV 53-3 to MLV 53-3CR: Anomaly Remediation (9/4/2024 - 9/13/2024) Sta 47 West Monroe: Annual ESD (9/10/2024) Sta 54: Station PLC - Controls Upgrade (9/3/2024 - 9/27/2024) Sta 54: Unit 1D - Controls Upgrade (9/3/2024 - 9/20/2024) Sta 54: Unit 2D - Controls Upgrade (9/23/2024 - 10/11/2024) |
Station 63 (segment 163 BH) |
1,169 |
|
924 (245) |
1069 (100) |
924 (245) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) MLV 58-1 to MLV 60-1: Shallow Pipe Replacement (9/3/2024 - 10/31/2024) MLV 77-2 to MLV 77-2A: Class Change / Pipe Replacement (8/12/2024 - 10/1/2024) MLV 84-3 to MLV 85-3: Class Change (9/9/2024 - 10/20/2024) Sta 63 Batesville: Annual ESD Test (9/23/2024 - 9/24/2024) Sta 63: Inspect & Replace Gas Scrubber Filters (9/9/2024 - 9/15/2024) Sta 63: Unit 2D - 60K hour inspections (8/26/2024 - 10/11/2024) |
MLV 822 East (segment 822 BH) |
972 |
|
972 |
972 |
705 (267) |
MLV 821-1 to MLV 823-1: SCCDA (M) (9/23/2024 - 10/4/2024) |
Station 823 (segment 823 BH) |
686 |
|
686 |
686 |
686 |
|
Station 834 (segment 834 BH) |
679 |
|
670 (9) |
670 (9) |
679 |
Sta 834: Unit 6A - 12K Engine Inspection (9/9/2024 - 9/21/2024) |
Station 823 Muskrat Line (segment 509 BH) |
128 |
|
90 (38) |
128 |
128 |
Sta 823 to MLV 516: Pig Run - Maintenance (M) (9/11/2024) |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
MLV 524 (segment 524 FH) |
335 |
|
277 (58) |
277 (58) |
335 |
MLV 527-1 to MLV 529-1: Pig Runs - Caliper/IMU 9/19/24 (9/19/2024) MLV 527-1 to MLV 529-1: Pig Runs - Cleaning/Gauge 9/10/24 to 9/18/24 (9/11/2024 - 9/18/2024) MLV 527-1 to MLV 529-1: Pig Runs - MFL-C 9/21/24 (9/21/2024) |
MLV 548 (segment 542 BH) |
1,605 |
|
885 (720) |
885 (720) |
1205 (400) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) MLV 538-2 to MLV 534-2: Pig Runs - Cleaning/Gauge 9/10 (9/10/2024) MLV 538-2 to MLV 534-2: Pig Runs - MFL 9/12 (9/12/2024) MLV 542-2 to MLV 538-2: Pig Runs - Cleaning/Gauge 9/17 (9/17/2024) MLV 542-2 to MLV 538-2: Pig Runs - MFL 9/19 (9/19/2024) MLV 542-3 to MLV 541-3: Pig Run - Maintenance (9/10/2024) MLV 546-1 to MLV 546-1A: Pipe Replacement (9/10/2024 - 9/19/2024) Sta 542 Dekalb: Ground Fault (9/17/2024) Sta 542: Unit 1A - Orifice and Spacer Plates (9/18/2024 - 10/1/2024) Sta 542: Unit 3A - Overhaul (2/12/2024 - 9/30/2024) Sta 546: Unit 1B - Turbine Exchange (9/9/2024 - 10/18/2024) Sta 546: Unit 3A - Discharge Valve (4/30/2024 - 10/31/2024) Sta 546: Unit 3A - Overhaul (2/15/2024 - 9/30/2024) Sta. 546 (Columbus): Annual ESD & Maintenance (9/24/2024) |
Station 860 (segment 548 BH) |
1,523 |
|
1120 (403) |
1340 (183) |
1410 (113) |
MLV 555-1 to MLV 550-1: Pig Runs - Caliper/IMU 9/26 (9/26/2024) MLV 555-1 to MLV 550-1: Pig Runs - Chemical Cleaning 9/16 - 9/19 (9/16/2024 - 9/19/2024) MLV 555-1 to MLV 550-1: Pig Runs - Cleaning & Gauge 9/24 (9/24/2024) Sta 550: Unit 1B Safety Device Checks (9/16/2024 - 9/20/2024) Sta 555 Collinwood: Annual ESD Test & Maintenance (9/9/2024 - 9/13/2024) Sta 555: Unit 3A - Exhaust System (9/2/2024 - 9/20/2024) Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
Station 860 North (Segment 860 BH) |
1,800 |
|
1200 (600) |
1280 (520) |
1230 (570) |
MLV 562-1 to MLV 563-1: Class Change (9/23/2024 - 10/9/2024) MLV 564-1 to MLV 565-1: Class Change (6/26/2024 - 9/13/2024) Sta 563: Annual and Quarterly Safety Checks (9/9/2024 - 9/12/2024) Sta 563: Unit 1A - Overhaul (9/22/2024 - 9/30/2024) Sta 860: Annual ESD Test (9/16/2024 - 9/17/2024) Sta 860: Force Majeure (8/18/2023 - TBD) Sta 860: Unit 1A - After Cooler (6/17/2024 - 9/30/2024) |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,630 |
|
2080 (550) |
1995 (635) |
1720 (910) |
MLV 101-1 to MLV 96-1: Pig Runs - Caliper/IMU/MFL-A 9/26 (9/26/2024) MLV 101-1 to MLV 96-1: Pig Runs - Cleaning 9/24 (9/24/2024) MLV 101-3 to MLV 102-3: Anomaly Remediation (9/19/2024 - 9/30/2024) MLV 103-3 to MLV 104-3: Anomaly Remediation (9/7/2024 - 9/18/2024) MLV 107-5 to MLV 109-5A: Anomaly Remediation (9/23/2024 - 9/28/2024) St 87: Unit 1E - Replace Engine Heads (9/16/2024 - 9/27/2024) St 87: Unit 2E - Replace Engine Heads (7/22/2024 - 9/16/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 2B - Zero Base Engine Overhaul (8/6/2024 - 10/31/2024) Sta 87 Portland: Annual ESD Test (9/24/2024 - 9/25/2024) Sta 87: Building D - Scrubber Filter Inspection/Change Out (9/24/2024 - 9/25/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) Sta 871: Unit 1A - Engine Inspection (9/10/2024) Sta 871: Unit 2A - Engine Inspection (9/12/2024) Sta 871: Unit 3A - Power Side Overhaul (7/22/2024 - 10/10/2024) Sta 875: Install BAM 2.0 Material (9/17/2024 - 9/18/2024) Sta 96: Unit 5C - Torque Engine Base Frame Anchor Bolts (9/9/2024 - 9/12/2024) |
Station 114 (segment 114 BH) |
918 |
|
918 |
918 |
918 |
|
Station 200 (segment 200 BH) |
1,765 |
|
1685 (80) |
1335 (430) |
1365 (400) |
MLV 110-4 to MLV 111-4: Make Piggable (9/10/2024 - 9/22/2024) MLV 111-4A to MLV 200-2S: Make Piggable (9/19/2024 - 9/30/2024) |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 204 (Segment 204 BH) |
1,827 |
|
1477 (350) |
1477 (350) |
1477 (350) |
MLV 200-2DBL to MLV 200-2A: Make Piggable / Replacement (M) (9/4/2024 - 9/14/2024) MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) MLV 214-3L to MLV 215-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) MLV 215-3 to MLV 216-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) Sta 200: Unit 2A - Turbo (9/9/2024 - 9/13/2024) Sta 204: Operational Conditions (7/1/2024 - 9/30/2024) Sta 204: Scrubber Filter Change (9/25/2024 - 9/26/2024) Sta 204: Unit 11A - Crankcase Inspection (9/23/2024 - 9/26/2024) Sta 204: Unit 12A - Turbo Replacement (9/10/2024 - 9/19/2024) Sta 209: Scrubber Filter Change (9/23/2024 - 9/24/2024) Sta 209: Unit 8A - Replace OP Turbo & Crankcase Inspection (9/23/2024 - 9/26/2024) Sta 214: Unit 10A - Compressor Cylinder (7/8/2024 - 9/14/2024) Sta 214: Unit 8A - Oil System (9/21/2023 - 9/13/2024) |
Station 230C (segment 296 FH) |
743 |
|
680 (63) |
680 (63) |
680 (63) |
Station 230C: Unit 1A - Protective Device Tests (9/12/2024) Station 230C: Unit 2A - Protective Device Tests (9/19/2024) Station 230C: Unit 3A - Protective Device Tests (9/26/2024) |
Station 245 (segment 245 FH) |
998 |
|
775 (223) |
775 (223) |
775 (223) |
Sta 245 West Winfield: Building A & B Safety System Upgrade (9/12/2024 - 9/30/2024) Sta 245: Unit 7A - Controls Upgrade (9/11/2024 - 10/10/2024) |
Station 249 (segment 249 FH) |
1,089 |
|
1,089 |
1,089 |
830 (259) |
MLV 249-1 TO MLV 254-1: Pig Runs - EMAT 9/24 (9/24/2024) |
Station 261 Discharge East (segment 261 FH) |
935 |
|
555 (380) |
555 (380) |
935 |
Sta 264: Unit 1C & 2C Overhauls and Control System Upgrades (8/26/2024 - 9/20/2024) |
Station 307 (segment 307 BH) |
1,154 |
|
1065 (89) |
1065 (89) |
950 (204) |
Sta 219: Unit 1B - Engine Upgrade (6/10/2024 - 10/1/2024) Sta 307: Station Upgrade (9/23/2024 - 9/30/2024) Sta 307: Unit 6A - Engine Upgrade (7/11/2024 - 10/26/2024) |
MLV 314 EAST (segment 314 BH) |
1,770 |
|
1300 (470) |
1,770 |
1,770 |
MLV 313-2 to MLV 314-2: Hot Tap for New Meter Station - Greylock Potter Meter (9/9/2024 - 9/13/2024) |
Station 315 (segment 315 BH) |
1,888 |
|
1,888 |
1,888 |
1,888 |
|
Station 317 (segment 317 BH) |
1,613 |
|
1,613 |
1560 (53) |
1,613 |
Sta 317: Unit 1B - 5-Year gearbox inspection (9/16/2024 - 9/20/2024) |
Station 321 (segment 321 FH) |
2,103 |
|
1588 (515) |
2,103 |
1640 (463) |
MLV 321-1 to MLV 325-1: Pig Runs - Cleaning/Gauge 9/10/24 (M) (9/10/2024) MLV 321-1 to MLV 325-1: Pig Runs - EMAT 9/12/24 (M) (9/12/2024) Sta 321 Clifford: Annual ESD Testing (9/24/2024 - 9/25/2024) |
MLV 324 (segment 324 FH) |
1,767 |
|
1,767 |
1602 (165) |
1602 (165) |
MLV 328-1 to MLV 329-1R: Anomaly Remediation (M) (9/16/2024 - 9/28/2024) |
|
|
|
||||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
MLV 336 East (segment 336 FH) |
153 |
|
0 (153) |
0 (153) |
0 (153) |
MLV 337-1 to MLV 338-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 339-1 to MLV 340-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 340-1 to MLV 341-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 341-1 to MLV 342-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 342-1 to MLV 343-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 343-1 to MLV 344-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 344-1 to MLV 345-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
MLV 345 North of Derby Lateral (segment 355 BH) |
48 |
|
0 (48) |
0 (48) |
0 (48) |
MLV 346-1 to MLV 347-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 349-1 to MLV 350-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
Station 405 HC Line (segment 299 FH) |
803 |
|
803 |
605 (198) |
803 |
Sta 313 Coudersport: Annual ESD Test (9/16/2024 - 9/20/2024) |
Station 224 (segment 224 FH) |
389 |
|
215 (174) |
389 |
389 |
Sta 229: Yard Piping (9/10/2024) |
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Primary impact restrictions may be necessary |
||
|
|
TGP - Outage Impact Report |
|
|
-Major impact restrictions may be necessary |
||
|
October 2024 (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
` |
Week 1 (9/30 - 10/6) |
Week 2 (10/7 - 10/13) |
Week 3 (10/14 - 10/20) |
Week 4 (10/21 - 10/27) |
Week 5 (10/28 - 11/3) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
Station 409 (Donna Line) (segment 490 FH) |
519 |
519 |
519 |
519 |
519 |
519 |
|
Station 1 (segment 101 BH) |
400 |
400 |
400 |
400 |
400 |
400 |
|
Station 9 (segment 109 BH) |
1,028 |
1,028 |
1,028 |
1,028 |
1,028 |
1,028 |
|
Station 17 (segment 117 BH) |
873 |
828 (45) |
738 (135) |
828 (45) |
828 (45) |
828 (45) |
Sta 17: Annual ESD Test (M) (10/9/2024) Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
873 |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
MLV 18-2A TO MLV 20-2A: Class Change / Wrinkle Bend Replacement (M) (8/27/2024 - 10/31/2024) |
Station 40 South (segment 132 BH) |
873 |
838 (35) |
838 (35) |
873 |
873 |
873 |
MLV 36-3 TO MLV 36-3A: Special Permit / Pipe Replacement (9/26/2024 - 10/10/2024) |
Station 47 (segment 143 BH) |
1,016 |
786 (230) |
746 (270) |
788 (228) |
1,016 |
1,016 |
MLV 46-1 to MLV 46-1BR: Class Change (9/16/2024 - 10/18/2024) MLV 50-2 to MLV 51-2: Crossover Valve Replacement (9/23/2024 - 10/4/2024) Sta 54 Greenville: Annual ESD Test (10/8/2024 - 10/10/2024) Sta 54: Unit 2D - Controls Upgrade (9/23/2024 - 10/11/2024) |
Station 63 (segment 163 BH) |
1,169 |
1069 (100) |
1069 (100) |
1069 (100) |
1084 (85) |
1059 (110) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) MLV 58-1 to MLV 60-1: Shallow Pipe Replacement (9/3/2024 - 10/31/2024) MLV 77-2 to MLV 77-2A: Class Change / Pipe Replacement (8/12/2024 - 10/1/2024) MLV 84-3 to MLV 85-3: Class Change (9/9/2024 - 10/20/2024) Sta 63: Unit 2D - 60K hour inspections (8/26/2024 - 10/11/2024) |
MLV 822 East (segment 822 BH) |
972 |
705 (267) |
972 |
972 |
972 |
972 |
MLV 821-1 to MLV 823-1: SCCDA (M) (9/23/2024 - 10/4/2024) |
Station 823 (segment 823 BH) |
686 |
686 |
686 |
220 (466) |
686 |
686 |
Sta 827 to Sta 823: Pig Run - Maintenance (M) (10/16/2024) Sta 834 to Sta 827: Maintenance Pig (M) (10/16/2024) |
Station 834 (segment 834 BH) |
679 |
679 |
679 |
675 (4) |
590 (89) |
679 |
Sta 834 Winnsboro: Annual ESD Test (10/23/2024) Sta 834: Unit 1A - 12K Engine Inspection (10/14/2024 - 10/18/2024) Sta 834: Unit 2A - 12K Engine Inspection (10/21/2024 - 10/25/2024) |
Station 847 (segment 847 BH) |
284 |
185 (99) |
284 |
284 |
0 (284) |
0 (284) |
MLV 854-1 to MLV 856-1: Make Piggable (10/22/2024 - 10/31/2024) Sta 836A Delhi: Annual ESD Test (9/30/2024 - 10/4/2024) Sta 836A: Unit 1A - Solar 8K Inspection & Air Filter Changeout (9/30/2024 - 10/4/2024) |
MLV 548 (segment 542 BH) |
1,605 |
1205 (400) |
900 (705) |
1295 (310) |
1600 (5) |
1598 (7) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) MLV 550-1 to MLV 546-1: Maintenance Pig (10/11/2024) MLV 550-2 to MLV 546-2: Maintenance Pig (10/10/2024) MLV 550-3 to MLV 549-3: Maintenance Pig (10/9/2024) Sta 542: Unit 1A - Orifice and Spacer Plates (9/18/2024 - 10/1/2024) Sta 542: Unit 2A - Orifice and Spacer Plates (10/2/2024 - 10/16/2024) Sta 542: Unit 3A - Overhaul (2/12/2024 - 9/30/2024) Sta 546: Unit 1B - Turbine Exchange (9/9/2024 - 10/18/2024) Sta 546: Unit 3A - Discharge Valve (4/30/2024 - 10/31/2024) Sta 546: Unit 3A - Overhaul (2/15/2024 - 9/30/2024) |
Station 860 (segment 548 BH) |
1,523 |
1375 (148) |
1515 (8) |
1515 (8) |
1320 (203) |
1510 (13) |
MLV 555-1 to MLV 550-1: Pig Runs - EMAT 10/3 (10/3/2024) MLV 555-1 to MLV 550-1: Pig Runs - MFL-C 10/1 (10/1/2024) Sta 550 Hamilton: Annual ESD Test (10/21/2024 - 10/25/2024) Sta 550: 480V Feed to 550-2 Valve (10/21/2024 - 10/25/2024) Sta 550: Fuel Coalescer (10/21/2024 - 10/25/2024) Sta 550: Unit 2A - Lube System Replacement (9/30/2024 - 10/4/2024) Sta 550: UPS Upgrade for Sta1 & Hyper Fuel System (10/21/2024 - 10/25/2024) Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
|
|
|
|
|
|||
|
|
TGP - Outage Impact Report |
|
|
-Major impact restrictions may be necessary |
||
|
October 2024 (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
` |
Week 1 (9/30 - 10/6) |
Week 2 (10/7 - 10/13) |
Week 3 (10/14 - 10/20) |
Week 4 (10/21 - 10/27) |
Week 5 (10/28 - 11/3) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
Station 860 North (Segment 860 BH) |
1,800 |
1230 (570) |
1530 (270) |
1350 (450) |
1350 (450) |
1510 (290) |
MLV 560-1 to MLV 561-1: Class Change (10/30/2024 - 12/22/2024) MLV 562-1 to MLV 563-1: Class Change (9/23/2024 - 10/9/2024) MLV 564-2: Valve Repair (10/14/2024 - 10/25/2024) Sta 563: Inverter Change Out / Battery Plate Replacement (9/30/2024 - 10/4/2024) Sta 563: Unit 1A - Overhaul (9/22/2024 - 9/30/2024) Sta 860: Force Majeure (8/18/2023 - TBD) Sta 860: HP Replacement (10/14/2024 - 10/25/2024) Sta 860: Unit 1A - After Cooler (6/17/2024 - 9/30/2024)TBD |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,630 |
2455 (175) |
2455 (175) |
2568 (62) |
2568 (62) |
2578 (52) |
MLV 100-3 to MLV 101-3: Anomaly Remediation (10/1/2024 - 10/12/2024) MLV 101-3 to MLV 102-3: Anomaly Remediation (9/19/2024 - 9/30/2024) MLV 110-4 to MLV 106-4: Pig Runs - AFD 10/31/24 (10/31/2024) MLV 110-4 to MLV 106-4: Pig Runs - Cleaning / Gauge 10/29/24 (10/29/2024) MLV 97-3 to MLV 98-3: Anomaly Remediation (10/25/2024 - 11/5/2024) MLV 98-3 to MLV 99-3: Anomaly Remediation (10/13/2024 - 10/24/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 2B - Zero Base Engine Overhaul (8/6/2024 - 10/31/2024) Sta 87: Unit 3D - Install New Air Distributor (10/14/2024 - 10/19/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) Sta 871: Unit 3A - Power Side Overhaul (7/22/2024 - 10/10/2024) |
Station 114 (segment 114 BH) |
918 |
918 |
918 |
918 |
805 (113) |
918 |
Sta 114: Unit 1D - 8K hour inspection (10/21/2024 - 10/23/2024) |
Station 200 (segment 200 BH) |
1,765 |
1365 (400) |
1,765 |
1,765 |
1,765 |
1,765 |
MLV 111-4A to MLV 200-2S: Make Piggable (9/19/2024 - 9/30/2024) |
Station 204 (Segment 204 BH) |
1,827 |
1477 (350) |
1780 (47) |
1780 (47) |
1780 (47) |
1777 (50) |
MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) MLV 214-3L to MLV 215-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) MLV 215-3 to MLV 216-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) Sta 200: Unit 1B - Annual Engine Inspection (9/30/2024 - 10/4/2024) Sta 204: Operational Conditions (7/1/2024 - 9/30/2024) |
Station 230C (segment 296 FH) |
743 |
680 (63) |
743 |
743 |
743 |
743 |
Station 230C: Unit 4A - Protective Device Tests (10/3/2024) |
Station 245 (segment 245 FH) |
998 |
775 (223) |
880 (118) |
505 (493) |
998 |
998 |
MLV 237-2 TO MLV 245-2: Pig Runs - Maintenance (10/15/2024) Sta 241: Unit 1B - 2K Maintenance (10/7/2024 - 10/8/2024) Sta 241: Unit 2B - 2K Maintenance (10/9/2024 - 10/10/2024) Sta 245 West Winfield: Building A & B Safety System Upgrade (9/12/2024 - 9/30/2024) Sta 245: Unit 7A - Controls Upgrade (9/11/2024 - 10/10/2024) |
Station 261 Discharge East (segment 261 FH) |
935 |
935 |
935 |
735 (200) |
935 |
935 |
Station 261 Agawam: Annual ESD Test (M) (10/16/2024 - 10/17/2024) |
Station 307 (segment 307 BH) |
1,154 |
950 (204) |
1065 (89) |
580 (574) |
1065 (89) |
1010 (144) |
MLV 313-2 to MLV 307-2: Pig Runs - Cleaning 10/15 (10/15/2024) Sta 219: Unit 1B - Engine Upgrade (6/10/2024 - 10/1/2024) Sta 307: Station Upgrade (9/23/2024 - 9/30/2024) Sta 307: Unit 6A - Engine Upgrade (7/11/2024 - 10/26/2024) Sta 310: Unit 1A - Water Wash & Borescope (10/29/2024 - 10/30/2024) |
Station 315 (segment 315 BH) |
1,888 |
1,888 |
1,888 |
1,888 |
1715 (173) |
1,888 |
Sta 315: Unit 1B - Water Wash & Borescope (10/22/2024 - 10/23/2024) |
Station 317 (segment 317 BH) |
1,613 |
1,613 |
1405 (208) |
1,613 |
1,613 |
1,613 |
Sta 317 Troy: 5-year Electric Substation Inspection (10/7/2024 - 10/8/2024) |
MLV 324 (segment 324 FH) |
1,767 |
1707 (60) |
1707 (60) |
1707 (60) |
1707 (60) |
1707 (60) |
MLV 326-1 to MLV 327-1: Anomaly Remediation (9/30/2024 - 11/2/2024) |
|
|
|
|
|
-Primary impact restrictions may be necessary |
||
|
|
TGP - Outage Impact Report |
|
|
-Major impact restrictions may be necessary |
||
|
October 2024 (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
` |
Week 1 (9/30 - 10/6) |
Week 2 (10/7 - 10/13) |
Week 3 (10/14 - 10/20) |
Week 4 (10/21 - 10/27) |
Week 5 (10/28 - 11/3) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
MLV 336 East (segment 336 FH) |
153 |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
MLV 337-1 to MLV 338-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 339-1 to MLV 340-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 340-1 to MLV 341-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 341-1 to MLV 342-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 342-1 to MLV 343-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 343-1 to MLV 344-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 344-1 to MLV 345-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
MLV 345 North of Derby Lateral (segment 355 BH) |
48 |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
MLV 346-1 to MLV 347-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 349-1 to MLV 350-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
Station 405 HC Line (segment 299 FH) |
803 |
803 |
803 |
685 (118) |
803 |
803 |
Sta 405A: Unit 1A - 4K - 8K Solar Turbine Borescope Inspection (10/16/2024) Sta 405A: Unit 1A - 4k Water Wash (10/14/2024) |
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
||||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
November 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (11/4 - 11/10) |
Week 2 (11/11 - 11/17) |
Week 3 (11/18 - 11/24) |
Week 4 (11/25 - 12/1) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 409 (Donna Line) (segment 490 FH) |
541 |
541 |
541 |
541 |
541 |
|
MLV 406 (segment 406 BH) |
459 |
204 (255) |
459 |
459 |
459 |
MLV 400-1 to MLV 409-1: Pig Run - Maintenance Cleaning 11/5 (M) (11/5/2024) MLV 400-2 to MLV 409-2: Pig Run - Maintenance Cleaning 11/6 (11/6/2024) |
Station 1 (segment 101 BH) |
439 |
439 |
439 |
439 |
439 |
|
Station 9 (segment 109 BH) |
1,067 |
1,067 |
667 (400) |
1,067 |
1,067 |
MLV 5-2 to MLV 1-2D: Pig Runs - Maintenance Cleaning 11/14 (M) (11/14/2024) MLV 9-1S and MLV 1-1D: Pig Run - Maintenance Cleaning 11/12 (M) (11/12/2024) MLV 9-2 to MLV 5-2: Pig Runs - Maintenance Cleaning 11/14 (M) (11/14/2024) MLV 9-3 to MLV 4-3: Pig Runs - Maintenance Cleaning 11/13 (M) (11/13/2024) |
Station 17 (segment 117 BH) |
896 |
871 (25) |
871 (25) |
896 |
896 |
Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
896 |
896 |
891 (5) |
896 |
896 |
MLV 20-1 to MLV 20-1R: Anomaly Remediation / Replacement (11/11/2024 - 11/16/2024) |
Station 40 South (segment 132 BH) |
896 |
896 |
896 |
896 |
896 |
|
Carthage Lateral (segment 700 FH) |
322 |
215 (107) |
322 |
322 |
322 |
MLV 706-1 to MLV 700-1: Pig Run - Maintenance (M) (11/7/2024) |
Station 47 (segment 143 BH) |
1,074 |
1,074 |
1,074 |
894 (180) |
894 (180) |
MLV 40-2D to MLV 42-2BR: Make Piggable (11/18/2024 - 11/26/2024) |
Station 63 (segment 163 BH) |
1,230 |
1120 (110) |
1120 (110) |
1120 (110) |
1120 (110) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) |
Station 823 (segment 823 BH) |
711 |
711 |
711 |
711 |
711 |
|
Station 834 (segment 834 BH) |
701 |
701 |
692 (9) |
692 (9) |
701 |
Sta 834: Unit 7A - 12K Engine Inspection (11/11/2024 - 11/23/2024) |
MLV 548 (segment 542 BH) |
1,667 |
1660 (7) |
1660 (7) |
1660 (7) |
1660 (7) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) |
Station 860 (segment 548 BH) |
1,593 |
1580 (13) |
1580 (13) |
1580 (13) |
1580 (13) |
Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
Station 860 North (Segment 860 BH) |
1,892 |
1252 (640) |
1792 (100) |
1792 (100) |
1792 (100) |
MLV 560-1 to MLV 561-1: Class Change (10/30/2024 - 12/22/2024) MLV 863-1 to MLV 864-1: Class Change (11/4/2024 - 11/14/2024) Sta 563: Quarterly Safety Checks (11/4/2024 - 11/8/2024) Sta 860: Force Majeure (8/18/2023 - TBD) |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
November 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (11/4 - 11/10) |
Week 2 (11/11 - 11/17) |
Week 3 (11/18 - 11/24) |
Week 4 (11/25 - 12/1) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 110 (segment 187 BH) (south thru Kentucky) |
2,732 |
2630 (102) |
2630 (102) |
2730 (2) |
2730 (2) |
MLV 110-4 to MLV 106-4: Pig Runs - EMAT 11/5/24 (11/5/2024) MLV 96-3D to MLV 97-3: Anomaly Remediation (11/6/2024 - 11/17/2024) MLV 97-3 to MLV 98-3: Anomaly Remediation (10/25/2024 - 11/5/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) |
Station 114 (segment 114 BH) |
955 |
955 |
955 |
805 (150) |
955 |
Sta 119: Unit 1A - Turbine Inspection (11/18/2024 - 11/20/2024) |
Station 200 (segment 200 BH) |
1,830 |
1240 (590) |
1240 (590) |
1,830 |
1,830 |
MLV 200-2 to MLV 110-4: Pig Runs - AFD 11/12/24 (11/12/2024) MLV 200-2 to MLV 110-4: Pig Runs - Cleaning / Gauge 11/7/24 (11/7/2024) MLV 200-2 to MLV 110-4: Pig Runs - EMAT 11/14/24 (11/14/2024) |
Station 204 (Segment 204 BH) |
1,895 |
1845 (50) |
1845 (50) |
1800 (95) |
1800 (95) |
MLV 204-2 to MLV 200-2: Pig Runs - AFD 11/21/24 (11/21/2024) MLV 204-2 to MLV 200-2: Pig Runs - Cleaning / Gauge 11/19/23 (11/19/2024) MLV 204-2 to MLV 200-2: Pig Runs - EMAT 11/26/24 (11/26/2024) MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) |
Station 245 (segment 245 FH) |
1,065 |
1,065 |
1,065 |
1,065 |
1,065 |
|
Station 261 Discharge East (segment 261 FH) |
1,038 |
1,038 |
1,038 |
1,038 |
1,038 |
|
Station 307 (segment 307 BH) |
1,203 |
1,203 |
1055 (148) |
1,203 |
1,203 |
Sta 303: Unit 1A - Solar Software Upgrade (11/12/2024) |
Station 315 (segment 315 BH) |
1,900 |
1,900 |
1,900 |
1,900 |
1,900 |
|
MLV 324 (segment 324 FH) |
1,873 |
1,873 |
1,873 |
1,873 |
1,873 |
|
Station 405 HC Line (segment 299 FH) |
826 |
826 |
826 |
826 |
826 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
December 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (12/2 - 12/8) |
Week 2 (12/9 - 12/15) |
Week 3 (12/16 - 12/22) |
Week 4 (12/23 - 12/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 409 (Donna Line) (segment 490 FH) |
541 |
541 |
541 |
541 |
541 |
|
Station 1 (segment 101 BH) |
439 |
439 |
439 |
439 |
439 |
|
Station 9 (segment 109 BH) |
1,067 |
1,067 |
1,067 |
1,067 |
1,067 |
|
Station 25 (segment 125 BH) |
896 |
896 |
896 |
896 |
896 |
|
Station 40 South (segment 132 BH) |
896 |
896 |
896 |
896 |
896 |
|
Station 47 (segment 143 BH) |
1,074 |
894 (180) |
894 (180) |
1,074 |
1,074 |
Sta 40-2 to Sta 42-2: Pig Runs - Cleaning 12/3 to 12/4 (12/3/2024 - 12/4/2024) Sta 40-2 to Sta 42-2: Pig Runs - EMAT 12/12 (12/12/2024) Sta 40-2 to Sta 42-2: Pig Runs - MFL-C 12/10 (12/10/2024) Sta 40-2 to Sta 42-2: Pig Runs - MFL-S 12/5 (12/5/2024) |
Station 63 (segment 163 BH) |
1,230 |
1120 (110) |
1120 (110) |
1120 (110) |
1120 (110) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) |
Station 823 (segment 823 BH) |
711 |
711 |
711 |
711 |
711 |
|
MLV 548 (segment 542 BH) |
1,667 |
1660 (7) |
1660 (7) |
1660 (7) |
1660 (7) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) |
Station 860 (segment 548 BH) |
1,593 |
1015 (578) |
1015 (578) |
1,593 |
1,593 |
MLV 555-2 to MLV 550-2: Pig Runs - Caliper/IMU 12/5 (12/5/2024) MLV 555-2 to MLV 550-2: Pig Runs - Cleaning 12/3 (12/3/2024) MLV 555-2 to MLV 550-2: Pig Runs - EMAT 12/11 (12/11/2024) MLV 555-2 to MLV 550-2: Pig Runs - MFL-C 12/9 (12/9/2024) |
Station 860 North (Segment 860 BH) |
1,892 |
1792 (100) |
1792 (100) |
1792 (100) |
1792 (100) |
MLV 560-1 to MLV 561-1: Class Change (10/30/2024 - 12/22/2024) Sta 860: Force Majeure (8/18/2023 - TBD) |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,732 |
2670 (62) |
2670 (62) |
2670 (62) |
2730 (2) |
MLV 105-1 to MLV 102-1: Pig Runs - AFD 12/17 (12/17/2024) MLV 105-1 to MLV 102-1: Pig Runs - Cleaning 12/3 (12/3/2024) MLV 105-1 to MLV 102-1: Pig Runs - EMAT 12/19 (12/19/2024) MLV 105-1 to MLV 102-1: Pig Runs - MFL-A 12/5 (12/5/2024) MLV 105-1 to MLV 102-1: Pig Runs - MFL-S 12/10 (12/10/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 1D - 4k Hr Inspection (12/3/2024 - 12/5/2024) |
Station 114 (segment 114 BH) |
955 |
955 |
955 |
900 (55) |
955 |
Sta 118A: Unit 1A - 8K Turbine Inspection (12/16/2024 - 12/18/2024) |
Station 204 (Segment 204 BH) |
1,895 |
1845 (50) |
1,895 |
1,895 |
1,895 |
MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) |
Station 245 (segment 245 FH) |
1,065 |
1,065 |
1,065 |
1,065 |
1,065 |
|
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
December 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (12/2 - 12/8) |
Week 2 (12/9 - 12/15) |
Week 3 (12/16 - 12/22) |
Week 4 (12/23 - 12/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 261 Discharge East (segment 261 FH) |
1,038 |
1,038 |
1,038 |
1,038 |
1,038 |
|
Station 307 (segment 307 BH) |
1,203 |
1,203 |
1,203 |
1,203 |
1,203 |
|
Station 315 (segment 315 BH) |
1,900 |
1,900 |
1,900 |
1,900 |
1,900 |
|
MLV 324 (segment 324 FH) |
1,873 |
1,873 |
1,873 |
1,873 |
1,873 |
|
Station 405 HC Line (segment 299 FH) |
826 |
826 |
826 |
826 |
826 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
TSP/TSP Name: 1939164-TENNESSEE GAS PIPELINE | Critical: Y |
Notice Type Desc (1): MAINTENANCE | Notice Type Desc (2): MAINTENANCE |
Notice Eff Date/Time: 08/29/2024 3:56:11PM | Notice End Date/Time: 08/30/2024 9:00:00am |
Post Date/Time: 8/29/2024 3:56:11 PM | Notice ID: 392128 |
Reqrd Rsp: 1 | Rsp Date: 08/29/2024 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: TGP Outage Impact Report |
|
|
|
|
|
|
|
|||
|
|
|
TGP - Outage Impact Report |
|
|
|
-Major impact restrictions may be necessary |
||
|
|
Seven Day Forecast (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
||||
|
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
||||
Station / Seg |
Est Nominal Operating Capacity (Thousand Dth) |
Monday (9/2) |
Tuesday (9/3) |
Wednesday (9/4) |
Thursday (9/5) |
Friday (9/6) |
Saturday (9/7) |
Sunday (9/8) |
Primary Outage(s) that may Impact Throughput |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||||
Station 409 (Donna Line) (segment 490 FH) |
519 |
519 |
519 |
519 |
519 |
519 |
519 |
519 |
|
Station 1 (segment 101 BH) |
400 |
400 |
400 |
400 |
400 |
400 |
400 |
400 |
|
Station 9 (segment 109 BH) |
1,028 |
962 (66) |
962 (66) |
962 (66) |
962 (66) |
962 (66) |
1018 (10) |
1018 (10) |
MLV 3-1 TO MLV 4-1: Class Change / Wrinkle Bend Replacement (M) (7/23/2024 - 9/23/2024) MLV 6-1 to MLV 7-1: Anomaly Remediation (8/6/2024 - 9/6/2024) |
Station 17 (segment 117 BH) |
873 |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
828 (45) |
Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
873 |
842 (31) |
723 (150) |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
MLV 18-2A TO MLV 20-2A: Class Change / Wrinkle Bend Replacement (M) (8/27/2024 - 10/31/2024) MLV 25-2 to MLV 32-2: Pig Run - Maintenance (9/3/2024) |
Station 40 South (segment 132 BH) |
873 |
873 |
628 (245) |
873 |
873 |
863 (10) |
863 (10) |
863 (10) |
MLV 36-1A TO MLV 37-1: Hydrotest (9/6/2024 - 9/16/2024) MLV 36-1LA to MLV 40-1S: Pig Run - Maintenance (9/3/2024) |
Station 47 (segment 143 BH) |
1,016 |
1,016 |
771 (245) |
366 (650) |
671 (345) |
671 (345) |
671 (345) |
671 (345) |
MLV 40-3 to MLV 47-3: Pig Run - Maintenance (9/4/2024) MLV 40-4 to MLV 47-4: Pig Run - Maintenance (9/5/2024) MLV 41-2A to MLV 42-2: Make Piggable (9/7/2024 - 9/14/2024) MLV 50-3 to MLV 51-3: Anomaly Remediation (9/4/2024 - 9/13/2024) MLV 53-3 to MLV 53-3CR: Anomaly Remediation (9/4/2024 - 9/13/2024) Sta 54: Station PLC - Controls Upgrade (9/3/2024 - 9/27/2024) Sta 54: Unit 1D - Controls Upgrade (9/3/2024 - 9/20/2024) |
Station 63 (segment 163 BH) |
1,169 |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
1079 (90) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) MLV 58-1 to MLV 60-1: Shallow Pipe Replacement (9/3/2024 - 10/31/2024) MLV 77-2 to MLV 77-2A: Class Change / Pipe Replacement (8/12/2024 - 10/1/2024) Sta 63: Unit 2D - 60K hour inspections (8/26/2024 - 10/11/2024) |
Station 823 (segment 823 BH) |
686 |
686 |
686 |
686 |
686 |
686 |
686 |
686 |
|
Station 834 (segment 834 BH) |
679 |
670 (9) |
670 (9) |
670 (9) |
670 (9) |
670 (9) |
679 |
679 |
Sta 834: Unit 3A - 12K Engine Inspection (8/26/2024 - 9/6/2024) |
MLV 524 (segment 524 FH) |
335 |
280 (55) |
280 (55) |
280 (55) |
280 (55) |
280 (55) |
335 |
335 |
MLV 532-2 to MLV 533-2: Anomaly Remediation (9/2/2024 - 9/6/2024) |
MLV 548 (segment 542 BH) |
1,605 |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
1570 (35) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) Sta 542: Unit 3A - Overhaul (2/12/2024 - 9/30/2024) Sta 546: Unit 3A - Discharge Valve (4/30/2024 - 10/31/2024) Sta 546: Unit 3A - Overhaul (2/15/2024 - 9/30/2024) |
Station 860 (segment 548 BH) |
1,523 |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
1510 (13) |
Sta 555: Unit 3A - Exhaust System (9/2/2024 - 9/20/2024) Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
Station 860 North (Segment 860 BH) |
1,800 |
1615 (185) |
1615 (185) |
1615 (185) |
1615 (185) |
1615 (185) |
1700 (100) |
1700 (100) |
MLV 564-1 to MLV 565-1: Class Change (6/26/2024 - 9/13/2024) Sta 860: Force Majeure (8/18/2023 - TBD) Sta 860: Unit 1A - After Cooler (6/17/2024 - 9/30/2024) Sta 860: Unit 5A - Crank-end Head Gasket (6/17/2024 - 9/6/2024) |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,630 |
2400 (230) |
2400 (230) |
2400 (230) |
2400 (230) |
2400 (230) |
2150 (480) |
2150 (480) |
MLV 103-3 to MLV 104-3: Anomaly Remediation (9/7/2024 - 9/18/2024) MLV 105-3 to MLV 106-3: Anomaly Remediation (8/26/2024 - 9/6/2024) St 87: Unit 2E - Replace Engine Heads (7/22/2024 - 9/16/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 2B - Zero Base Engine Overhaul (8/6/2024 - 10/31/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) Sta 871: Unit 3A - Power Side Overhaul (7/22/2024 - 10/10/2024) |
Station 114 (segment 114 BH) |
918 |
918 |
918 |
918 |
918 |
918 |
918 |
918 |
|
Station 204 (Segment 204 BH) |
1,827 |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
1477 (350) |
MLV 200-2DBL to MLV 200-2A: Make Piggable / Replacement (M) (9/4/2024 - 9/14/2024) MLV 214-3L to MLV 215-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) MLV 215-3 to MLV 216-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) Sta 204: Operational Conditions (7/1/2024 - 9/30/2024) Sta 204: Unit 3A - Crankcase Inspection (9/3/2024 - 9/5/2024) Sta 209: Unit 3A - Crankcase Inspection (9/3/2024 - 9/5/2024) Sta 214: Unit 10A - Compressor Cylinder (7/8/2024 - 9/14/2024) Sta 214: Unit 8A - Oil System (9/21/2023 - 9/13/2024) |
Station 245 (segment 245 FH) |
998 |
998 |
998 |
998 |
998 |
998 |
998 |
998 |
|
|
|
|
|
|
|
|
-Primary impact restrictions may be necessary |
||
|
|
|
TGP - Outage Impact Report |
|
|
|
-Major impact restrictions may be necessary |
||
|
|
Seven Day Forecast (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
||||
|
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
||||
Station / Seg |
Est Nominal Operating Capacity (Thousand Dth) |
Monday (9/2) |
Tuesday (9/3) |
Wednesday (9/4) |
Thursday (9/5) |
Friday (9/6) |
Saturday (9/7) |
Sunday (9/8) |
Primary Outage(s) that may Impact Throughput |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||||
MLV 256 West (segment 249 FH) |
1,213 |
1,213 |
1,213 |
1145 (68) |
1,213 |
1,213 |
1,213 |
1,213 |
Sta 249: Unit 1A - Engine Frame (9/4/2024) |
Station 261 Discharge East (segment 261 FH) |
935 |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
555 (380) |
Sta 264: Unit 1C & 2C Overhauls and Control System Upgrades (8/26/2024 - 9/20/2024) |
Station 307 (segment 307 BH) |
1,154 |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
1065 (89) |
Sta 219: Unit 1B - Engine Upgrade (6/10/2024 - 10/1/2024) Sta 307: Unit 6A - Engine Upgrade (7/11/2024 - 10/26/2024) |
MLV 314 EAST (segment 314 BH) |
1,770 |
1400 (370) |
1400 (370) |
1400 (370) |
1400 (370) |
1400 (370) |
1,770 |
1,770 |
MLV 313-1 to MLV 314-1: Hot Tap for New Meter Station - Greylock Potter Meter (9/2/2024 - 9/6/2024) |
Station 315 (segment 315 BH) |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
1,888 |
|
MLV 324 (segment 324 FH) |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
1,767 |
|
MLV 336 East (segment 336 FH) |
153 |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
MLV 337-1 to MLV 338-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 339-1 to MLV 340-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 340-1 to MLV 341-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 341-1 to MLV 342-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 342-1 to MLV 343-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 343-1 to MLV 344-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 344-1 to MLV 345-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
MLV 345 North of Derby Lateral (segment 355 BH) |
48 |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
MLV 346-1 to MLV 347-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 349-1 to MLV 350-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
Station 405 HC Line (segment 299 FH) |
803 |
803 |
803 |
803 |
803 |
803 |
803 |
803 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
||||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 409 (Donna Line) (segment 490 FH) |
519 |
|
519 |
519 |
519 |
|
Station 1 (segment 101 BH) |
400 |
|
400 |
400 |
400 |
|
Station 9 (segment 109 BH) |
1,028 |
|
663 (365) |
663 (365) |
1018 (10) |
MLV 3-1 TO MLV 4-1: Class Change / Wrinkle Bend Replacement (M) (7/23/2024 - 9/23/2024) MLV 5-2 to MLV 1-2D: Pig Runs - Cleaning 9/10/24 (M) (9/10/2024) MLV 5-2 to MLV 1-2D: Pig Runs - Cleaning 9/9/24 (M) (9/9/2024) MLV 5-2 to MLV 1-2D: Pig Runs - MFL-A 9/11/24 (M) (9/11/2024) MLV 9-1D to MLV 17-1S: Pig Runs - Cleaning 9/17/24 (M) (9/17/2024) MLV 9-1D to MLV 17-1S: Pig Runs - Cleaning/Gauge 9/16/24 (M) (9/16/2024) MLV 9-1D to MLV 17-1S: Pig Runs - MDS Tool with IMU/XYZ 9/19/24 (M) (9/19/2024) |
Station 17 (segment 117 BH) |
873 |
|
828 (45) |
828 (45) |
828 (45) |
Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
873 |
|
842 (31) |
842 (31) |
842 (31) |
MLV 18-2A TO MLV 20-2A: Class Change / Wrinkle Bend Replacement (M) (8/27/2024 - 10/31/2024) |
Station 40 South (segment 132 BH) |
873 |
|
643 (230) |
848 (25) |
838 (35) |
MLV 36-1A TO MLV 37-1: Hydrotest (9/6/2024 - 9/16/2024) MLV 36-2 TO MLV 36-2A: Special Permit / Pipe Replacement (9/17/2024 - 9/23/2024) MLV 36-3 TO MLV 36-3A: Special Permit / Pipe Replacement (9/26/2024 - 10/10/2024) Sta 32: Annual ESD Test & Electrical Inspection (9/9/2024 - 9/13/2024) |
Station 47 (segment 143 BH) |
1,016 |
|
386 (630) |
738 (278) |
731 (285) |
MLV 41-2A to MLV 42-2: Make Piggable (9/7/2024 - 9/14/2024) MLV 46-1 to MLV 46-1BR: Class Change (9/16/2024 - 10/18/2024) MLV 50-2 to MLV 51-2: Crossover Valve Replacement (9/23/2024 - 10/4/2024) MLV 50-3 to MLV 51-3: Anomaly Remediation (9/4/2024 - 9/13/2024) MLV 53-3 to MLV 53-3CR: Anomaly Remediation (9/4/2024 - 9/13/2024) Sta 47 West Monroe: Annual ESD (9/10/2024) Sta 54: Station PLC - Controls Upgrade (9/3/2024 - 9/27/2024) Sta 54: Unit 1D - Controls Upgrade (9/3/2024 - 9/20/2024) Sta 54: Unit 2D - Controls Upgrade (9/23/2024 - 10/11/2024) |
Station 63 (segment 163 BH) |
1,169 |
|
924 (245) |
1069 (100) |
924 (245) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) MLV 58-1 to MLV 60-1: Shallow Pipe Replacement (9/3/2024 - 10/31/2024) MLV 77-2 to MLV 77-2A: Class Change / Pipe Replacement (8/12/2024 - 10/1/2024) MLV 84-3 to MLV 85-3: Class Change (9/9/2024 - 10/20/2024) Sta 63 Batesville: Annual ESD Test (9/23/2024 - 9/24/2024) Sta 63: Inspect & Replace Gas Scrubber Filters (9/9/2024 - 9/15/2024) Sta 63: Unit 2D - 60K hour inspections (8/26/2024 - 10/11/2024) |
MLV 822 East (segment 822 BH) |
972 |
|
972 |
972 |
705 (267) |
MLV 821-1 to MLV 823-1: SCCDA (M) (9/23/2024 - 10/4/2024) |
Station 823 (segment 823 BH) |
686 |
|
686 |
686 |
686 |
|
Station 834 (segment 834 BH) |
679 |
|
670 (9) |
670 (9) |
679 |
Sta 834: Unit 6A - 12K Engine Inspection (9/9/2024 - 9/21/2024) |
Station 823 Muskrat Line (segment 509 BH) |
128 |
|
90 (38) |
128 |
128 |
Sta 823 to MLV 516: Pig Run - Maintenance (M) (9/11/2024) |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
MLV 524 (segment 524 FH) |
335 |
|
277 (58) |
277 (58) |
335 |
MLV 527-1 to MLV 529-1: Pig Runs - Caliper/IMU 9/19/24 (9/19/2024) MLV 527-1 to MLV 529-1: Pig Runs - Cleaning/Gauge 9/10/24 to 9/18/24 (9/11/2024 - 9/18/2024) MLV 527-1 to MLV 529-1: Pig Runs - MFL-C 9/21/24 (9/21/2024) |
MLV 548 (segment 542 BH) |
1,605 |
|
885 (720) |
885 (720) |
1205 (400) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) MLV 538-2 to MLV 534-2: Pig Runs - Cleaning/Gauge 9/10 (9/10/2024) MLV 538-2 to MLV 534-2: Pig Runs - MFL 9/12 (9/12/2024) MLV 542-2 to MLV 538-2: Pig Runs - Cleaning/Gauge 9/17 (9/17/2024) MLV 542-2 to MLV 538-2: Pig Runs - MFL 9/19 (9/19/2024) MLV 542-3 to MLV 541-3: Pig Run - Maintenance (9/10/2024) MLV 546-1 to MLV 546-1A: Pipe Replacement (9/10/2024 - 9/19/2024) Sta 542 Dekalb: Ground Fault (9/17/2024) Sta 542: Unit 1A - Orifice and Spacer Plates (9/18/2024 - 10/1/2024) Sta 542: Unit 3A - Overhaul (2/12/2024 - 9/30/2024) Sta 546: Unit 1B - Turbine Exchange (9/9/2024 - 10/18/2024) Sta 546: Unit 3A - Discharge Valve (4/30/2024 - 10/31/2024) Sta 546: Unit 3A - Overhaul (2/15/2024 - 9/30/2024) Sta. 546 (Columbus): Annual ESD & Maintenance (9/24/2024) |
Station 860 (segment 548 BH) |
1,523 |
|
1120 (403) |
1340 (183) |
1410 (113) |
MLV 555-1 to MLV 550-1: Pig Runs - Caliper/IMU 9/26 (9/26/2024) MLV 555-1 to MLV 550-1: Pig Runs - Chemical Cleaning 9/16 - 9/19 (9/16/2024 - 9/19/2024) MLV 555-1 to MLV 550-1: Pig Runs - Cleaning & Gauge 9/24 (9/24/2024) Sta 550: Unit 1B Safety Device Checks (9/16/2024 - 9/20/2024) Sta 555 Collinwood: Annual ESD Test & Maintenance (9/9/2024 - 9/13/2024) Sta 555: Unit 3A - Exhaust System (9/2/2024 - 9/20/2024) Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
Station 860 North (Segment 860 BH) |
1,800 |
|
1200 (600) |
1280 (520) |
1230 (570) |
MLV 562-1 to MLV 563-1: Class Change (9/23/2024 - 10/9/2024) MLV 564-1 to MLV 565-1: Class Change (6/26/2024 - 9/13/2024) Sta 563: Annual and Quarterly Safety Checks (9/9/2024 - 9/12/2024) Sta 563: Unit 1A - Overhaul (9/22/2024 - 9/30/2024) Sta 860: Annual ESD Test (9/16/2024 - 9/17/2024) Sta 860: Force Majeure (8/18/2023 - TBD) Sta 860: Unit 1A - After Cooler (6/17/2024 - 9/30/2024) |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,630 |
|
2080 (550) |
1995 (635) |
1720 (910) |
MLV 101-1 to MLV 96-1: Pig Runs - Caliper/IMU/MFL-A 9/26 (9/26/2024) MLV 101-1 to MLV 96-1: Pig Runs - Cleaning 9/24 (9/24/2024) MLV 101-3 to MLV 102-3: Anomaly Remediation (9/19/2024 - 9/30/2024) MLV 103-3 to MLV 104-3: Anomaly Remediation (9/7/2024 - 9/18/2024) MLV 107-5 to MLV 109-5A: Anomaly Remediation (9/23/2024 - 9/28/2024) St 87: Unit 1E - Replace Engine Heads (9/16/2024 - 9/27/2024) St 87: Unit 2E - Replace Engine Heads (7/22/2024 - 9/16/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 2B - Zero Base Engine Overhaul (8/6/2024 - 10/31/2024) Sta 87 Portland: Annual ESD Test (9/24/2024 - 9/25/2024) Sta 87: Building D - Scrubber Filter Inspection/Change Out (9/24/2024 - 9/25/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) Sta 871: Unit 1A - Engine Inspection (9/10/2024) Sta 871: Unit 2A - Engine Inspection (9/12/2024) Sta 871: Unit 3A - Power Side Overhaul (7/22/2024 - 10/10/2024) Sta 875: Install BAM 2.0 Material (9/17/2024 - 9/18/2024) Sta 96: Unit 5C - Torque Engine Base Frame Anchor Bolts (9/9/2024 - 9/12/2024) |
Station 114 (segment 114 BH) |
918 |
|
918 |
918 |
918 |
|
Station 200 (segment 200 BH) |
1,765 |
|
1685 (80) |
1335 (430) |
1365 (400) |
MLV 110-4 to MLV 111-4: Make Piggable (9/10/2024 - 9/22/2024) MLV 111-4A to MLV 200-2S: Make Piggable (9/19/2024 - 9/30/2024) |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 204 (Segment 204 BH) |
1,827 |
|
1477 (350) |
1477 (350) |
1477 (350) |
MLV 200-2DBL to MLV 200-2A: Make Piggable / Replacement (M) (9/4/2024 - 9/14/2024) MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) MLV 214-3L to MLV 215-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) MLV 215-3 to MLV 216-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) Sta 200: Unit 2A - Turbo (9/9/2024 - 9/13/2024) Sta 204: Operational Conditions (7/1/2024 - 9/30/2024) Sta 204: Scrubber Filter Change (9/25/2024 - 9/26/2024) Sta 204: Unit 11A - Crankcase Inspection (9/23/2024 - 9/26/2024) Sta 204: Unit 12A - Turbo Replacement (9/10/2024 - 9/19/2024) Sta 209: Scrubber Filter Change (9/23/2024 - 9/24/2024) Sta 209: Unit 8A - Replace OP Turbo & Crankcase Inspection (9/23/2024 - 9/26/2024) Sta 214: Unit 10A - Compressor Cylinder (7/8/2024 - 9/14/2024) Sta 214: Unit 8A - Oil System (9/21/2023 - 9/13/2024) |
Station 230C (segment 296 FH) |
743 |
|
680 (63) |
680 (63) |
680 (63) |
Station 230C: Unit 1A - Protective Device Tests (9/12/2024) Station 230C: Unit 2A - Protective Device Tests (9/19/2024) Station 230C: Unit 3A - Protective Device Tests (9/26/2024) |
Station 245 (segment 245 FH) |
998 |
|
775 (223) |
775 (223) |
775 (223) |
Sta 245 West Winfield: Building A & B Safety System Upgrade (9/12/2024 - 9/30/2024) Sta 245: Unit 7A - Controls Upgrade (9/11/2024 - 10/10/2024) |
Station 249 (segment 249 FH) |
1,089 |
|
1,089 |
1,089 |
830 (259) |
MLV 249-1 TO MLV 254-1: Pig Runs - EMAT 9/24 (9/24/2024) |
Station 261 Discharge East (segment 261 FH) |
935 |
|
555 (380) |
555 (380) |
935 |
Sta 264: Unit 1C & 2C Overhauls and Control System Upgrades (8/26/2024 - 9/20/2024) |
Station 307 (segment 307 BH) |
1,154 |
|
1065 (89) |
1065 (89) |
950 (204) |
Sta 219: Unit 1B - Engine Upgrade (6/10/2024 - 10/1/2024) Sta 307: Station Upgrade (9/23/2024 - 9/30/2024) Sta 307: Unit 6A - Engine Upgrade (7/11/2024 - 10/26/2024) |
MLV 314 EAST (segment 314 BH) |
1,770 |
|
1300 (470) |
1,770 |
1,770 |
MLV 313-2 to MLV 314-2: Hot Tap for New Meter Station - Greylock Potter Meter (9/9/2024 - 9/13/2024) |
Station 315 (segment 315 BH) |
1,888 |
|
1,888 |
1,888 |
1,888 |
|
Station 317 (segment 317 BH) |
1,613 |
|
1,613 |
1560 (53) |
1,613 |
Sta 317: Unit 1B - 5-Year gearbox inspection (9/16/2024 - 9/20/2024) |
Station 321 (segment 321 FH) |
2,103 |
|
1588 (515) |
2,103 |
1640 (463) |
MLV 321-1 to MLV 325-1: Pig Runs - Cleaning/Gauge 9/10/24 (M) (9/10/2024) MLV 321-1 to MLV 325-1: Pig Runs - EMAT 9/12/24 (M) (9/12/2024) Sta 321 Clifford: Annual ESD Testing (9/24/2024 - 9/25/2024) |
MLV 324 (segment 324 FH) |
1,767 |
|
1,767 |
1602 (165) |
1602 (165) |
MLV 328-1 to MLV 329-1R: Anomaly Remediation (M) (9/16/2024 - 9/28/2024) |
|
|
|
||||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
September 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (9/2 - 9/8) |
Week 2 (9/9 - 9/15) |
Week 3 (9/16 - 9/22) |
Week 4 (9/23 - 9/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
MLV 336 East (segment 336 FH) |
153 |
|
0 (153) |
0 (153) |
0 (153) |
MLV 337-1 to MLV 338-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 339-1 to MLV 340-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 340-1 to MLV 341-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 341-1 to MLV 342-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 342-1 to MLV 343-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 343-1 to MLV 344-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 344-1 to MLV 345-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
MLV 345 North of Derby Lateral (segment 355 BH) |
48 |
|
0 (48) |
0 (48) |
0 (48) |
MLV 346-1 to MLV 347-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 349-1 to MLV 350-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
Station 405 HC Line (segment 299 FH) |
803 |
|
803 |
605 (198) |
803 |
Sta 313 Coudersport: Annual ESD Test (9/16/2024 - 9/20/2024) |
Station 224 (segment 224 FH) |
389 |
|
215 (174) |
389 |
389 |
Sta 229: Yard Piping (9/10/2024) |
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Primary impact restrictions may be necessary |
||
|
|
TGP - Outage Impact Report |
|
|
-Major impact restrictions may be necessary |
||
|
October 2024 (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
` |
Week 1 (9/30 - 10/6) |
Week 2 (10/7 - 10/13) |
Week 3 (10/14 - 10/20) |
Week 4 (10/21 - 10/27) |
Week 5 (10/28 - 11/3) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
Station 409 (Donna Line) (segment 490 FH) |
519 |
519 |
519 |
519 |
519 |
519 |
|
Station 1 (segment 101 BH) |
400 |
400 |
400 |
400 |
400 |
400 |
|
Station 9 (segment 109 BH) |
1,028 |
1,028 |
1,028 |
1,028 |
1,028 |
1,028 |
|
Station 17 (segment 117 BH) |
873 |
828 (45) |
738 (135) |
828 (45) |
828 (45) |
828 (45) |
Sta 17: Annual ESD Test (M) (10/9/2024) Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
873 |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
842 (31) |
MLV 18-2A TO MLV 20-2A: Class Change / Wrinkle Bend Replacement (M) (8/27/2024 - 10/31/2024) |
Station 40 South (segment 132 BH) |
873 |
838 (35) |
838 (35) |
873 |
873 |
873 |
MLV 36-3 TO MLV 36-3A: Special Permit / Pipe Replacement (9/26/2024 - 10/10/2024) |
Station 47 (segment 143 BH) |
1,016 |
786 (230) |
746 (270) |
788 (228) |
1,016 |
1,016 |
MLV 46-1 to MLV 46-1BR: Class Change (9/16/2024 - 10/18/2024) MLV 50-2 to MLV 51-2: Crossover Valve Replacement (9/23/2024 - 10/4/2024) Sta 54 Greenville: Annual ESD Test (10/8/2024 - 10/10/2024) Sta 54: Unit 2D - Controls Upgrade (9/23/2024 - 10/11/2024) |
Station 63 (segment 163 BH) |
1,169 |
1069 (100) |
1069 (100) |
1069 (100) |
1084 (85) |
1059 (110) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) MLV 58-1 to MLV 60-1: Shallow Pipe Replacement (9/3/2024 - 10/31/2024) MLV 77-2 to MLV 77-2A: Class Change / Pipe Replacement (8/12/2024 - 10/1/2024) MLV 84-3 to MLV 85-3: Class Change (9/9/2024 - 10/20/2024) Sta 63: Unit 2D - 60K hour inspections (8/26/2024 - 10/11/2024) |
MLV 822 East (segment 822 BH) |
972 |
705 (267) |
972 |
972 |
972 |
972 |
MLV 821-1 to MLV 823-1: SCCDA (M) (9/23/2024 - 10/4/2024) |
Station 823 (segment 823 BH) |
686 |
686 |
686 |
220 (466) |
686 |
686 |
Sta 827 to Sta 823: Pig Run - Maintenance (M) (10/16/2024) Sta 834 to Sta 827: Maintenance Pig (M) (10/16/2024) |
Station 834 (segment 834 BH) |
679 |
679 |
679 |
675 (4) |
590 (89) |
679 |
Sta 834 Winnsboro: Annual ESD Test (10/23/2024) Sta 834: Unit 1A - 12K Engine Inspection (10/14/2024 - 10/18/2024) Sta 834: Unit 2A - 12K Engine Inspection (10/21/2024 - 10/25/2024) |
Station 847 (segment 847 BH) |
284 |
185 (99) |
284 |
284 |
0 (284) |
0 (284) |
MLV 854-1 to MLV 856-1: Make Piggable (10/22/2024 - 10/31/2024) Sta 836A Delhi: Annual ESD Test (9/30/2024 - 10/4/2024) Sta 836A: Unit 1A - Solar 8K Inspection & Air Filter Changeout (9/30/2024 - 10/4/2024) |
MLV 548 (segment 542 BH) |
1,605 |
1205 (400) |
900 (705) |
1295 (310) |
1600 (5) |
1598 (7) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) MLV 550-1 to MLV 546-1: Maintenance Pig (10/11/2024) MLV 550-2 to MLV 546-2: Maintenance Pig (10/10/2024) MLV 550-3 to MLV 549-3: Maintenance Pig (10/9/2024) Sta 542: Unit 1A - Orifice and Spacer Plates (9/18/2024 - 10/1/2024) Sta 542: Unit 2A - Orifice and Spacer Plates (10/2/2024 - 10/16/2024) Sta 542: Unit 3A - Overhaul (2/12/2024 - 9/30/2024) Sta 546: Unit 1B - Turbine Exchange (9/9/2024 - 10/18/2024) Sta 546: Unit 3A - Discharge Valve (4/30/2024 - 10/31/2024) Sta 546: Unit 3A - Overhaul (2/15/2024 - 9/30/2024) |
Station 860 (segment 548 BH) |
1,523 |
1375 (148) |
1515 (8) |
1515 (8) |
1320 (203) |
1510 (13) |
MLV 555-1 to MLV 550-1: Pig Runs - EMAT 10/3 (10/3/2024) MLV 555-1 to MLV 550-1: Pig Runs - MFL-C 10/1 (10/1/2024) Sta 550 Hamilton: Annual ESD Test (10/21/2024 - 10/25/2024) Sta 550: 480V Feed to 550-2 Valve (10/21/2024 - 10/25/2024) Sta 550: Fuel Coalescer (10/21/2024 - 10/25/2024) Sta 550: Unit 2A - Lube System Replacement (9/30/2024 - 10/4/2024) Sta 550: UPS Upgrade for Sta1 & Hyper Fuel System (10/21/2024 - 10/25/2024) Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
|
|
|
|
|
|||
|
|
TGP - Outage Impact Report |
|
|
-Major impact restrictions may be necessary |
||
|
October 2024 (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
` |
Week 1 (9/30 - 10/6) |
Week 2 (10/7 - 10/13) |
Week 3 (10/14 - 10/20) |
Week 4 (10/21 - 10/27) |
Week 5 (10/28 - 11/3) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
Station 860 North (Segment 860 BH) |
1,800 |
1230 (570) |
1530 (270) |
1350 (450) |
1350 (450) |
1510 (290) |
MLV 560-1 to MLV 561-1: Class Change (10/30/2024 - 12/22/2024) MLV 562-1 to MLV 563-1: Class Change (9/23/2024 - 10/9/2024) MLV 564-2: Valve Repair (10/14/2024 - 10/25/2024) Sta 563: Inverter Change Out / Battery Plate Replacement (9/30/2024 - 10/4/2024) Sta 563: Unit 1A - Overhaul (9/22/2024 - 9/30/2024) Sta 860: Force Majeure (8/18/2023 - TBD) Sta 860: HP Replacement (10/14/2024 - 10/25/2024) Sta 860: Unit 1A - After Cooler (6/17/2024 - 9/30/2024)TBD |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,630 |
2455 (175) |
2455 (175) |
2568 (62) |
2568 (62) |
2578 (52) |
MLV 100-3 to MLV 101-3: Anomaly Remediation (10/1/2024 - 10/12/2024) MLV 101-3 to MLV 102-3: Anomaly Remediation (9/19/2024 - 9/30/2024) MLV 110-4 to MLV 106-4: Pig Runs - AFD 10/31/24 (10/31/2024) MLV 110-4 to MLV 106-4: Pig Runs - Cleaning / Gauge 10/29/24 (10/29/2024) MLV 97-3 to MLV 98-3: Anomaly Remediation (10/25/2024 - 11/5/2024) MLV 98-3 to MLV 99-3: Anomaly Remediation (10/13/2024 - 10/24/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 2B - Zero Base Engine Overhaul (8/6/2024 - 10/31/2024) Sta 87: Unit 3D - Install New Air Distributor (10/14/2024 - 10/19/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) Sta 871: Unit 3A - Power Side Overhaul (7/22/2024 - 10/10/2024) |
Station 114 (segment 114 BH) |
918 |
918 |
918 |
918 |
805 (113) |
918 |
Sta 114: Unit 1D - 8K hour inspection (10/21/2024 - 10/23/2024) |
Station 200 (segment 200 BH) |
1,765 |
1365 (400) |
1,765 |
1,765 |
1,765 |
1,765 |
MLV 111-4A to MLV 200-2S: Make Piggable (9/19/2024 - 9/30/2024) |
Station 204 (Segment 204 BH) |
1,827 |
1477 (350) |
1780 (47) |
1780 (47) |
1780 (47) |
1777 (50) |
MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) MLV 214-3L to MLV 215-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) MLV 215-3 to MLV 216-3: PHMSA Immediate Anomaly Remediation (8/15/2024 - 10/4/2024) Sta 200: Unit 1B - Annual Engine Inspection (9/30/2024 - 10/4/2024) Sta 204: Operational Conditions (7/1/2024 - 9/30/2024) |
Station 230C (segment 296 FH) |
743 |
680 (63) |
743 |
743 |
743 |
743 |
Station 230C: Unit 4A - Protective Device Tests (10/3/2024) |
Station 245 (segment 245 FH) |
998 |
775 (223) |
880 (118) |
505 (493) |
998 |
998 |
MLV 237-2 TO MLV 245-2: Pig Runs - Maintenance (10/15/2024) Sta 241: Unit 1B - 2K Maintenance (10/7/2024 - 10/8/2024) Sta 241: Unit 2B - 2K Maintenance (10/9/2024 - 10/10/2024) Sta 245 West Winfield: Building A & B Safety System Upgrade (9/12/2024 - 9/30/2024) Sta 245: Unit 7A - Controls Upgrade (9/11/2024 - 10/10/2024) |
Station 261 Discharge East (segment 261 FH) |
935 |
935 |
935 |
735 (200) |
935 |
935 |
Station 261 Agawam: Annual ESD Test (M) (10/16/2024 - 10/17/2024) |
Station 307 (segment 307 BH) |
1,154 |
950 (204) |
1065 (89) |
580 (574) |
1065 (89) |
1010 (144) |
MLV 313-2 to MLV 307-2: Pig Runs - Cleaning 10/15 (10/15/2024) Sta 219: Unit 1B - Engine Upgrade (6/10/2024 - 10/1/2024) Sta 307: Station Upgrade (9/23/2024 - 9/30/2024) Sta 307: Unit 6A - Engine Upgrade (7/11/2024 - 10/26/2024) Sta 310: Unit 1A - Water Wash & Borescope (10/29/2024 - 10/30/2024) |
Station 315 (segment 315 BH) |
1,888 |
1,888 |
1,888 |
1,888 |
1715 (173) |
1,888 |
Sta 315: Unit 1B - Water Wash & Borescope (10/22/2024 - 10/23/2024) |
Station 317 (segment 317 BH) |
1,613 |
1,613 |
1405 (208) |
1,613 |
1,613 |
1,613 |
Sta 317 Troy: 5-year Electric Substation Inspection (10/7/2024 - 10/8/2024) |
MLV 324 (segment 324 FH) |
1,767 |
1707 (60) |
1707 (60) |
1707 (60) |
1707 (60) |
1707 (60) |
MLV 326-1 to MLV 327-1: Anomaly Remediation (9/30/2024 - 11/2/2024) |
|
|
|
|
|
-Primary impact restrictions may be necessary |
||
|
|
TGP - Outage Impact Report |
|
|
-Major impact restrictions may be necessary |
||
|
October 2024 (updated 08/29/24) |
|
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
` |
Week 1 (9/30 - 10/6) |
Week 2 (10/7 - 10/13) |
Week 3 (10/14 - 10/20) |
Week 4 (10/21 - 10/27) |
Week 5 (10/28 - 11/3) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
MLV 336 East (segment 336 FH) |
153 |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
0 (153) |
MLV 337-1 to MLV 338-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 339-1 to MLV 340-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 340-1 to MLV 341-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 341-1 to MLV 342-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 342-1 to MLV 343-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 343-1 to MLV 344-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 344-1 to MLV 345-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
MLV 345 North of Derby Lateral (segment 355 BH) |
48 |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
0 (48) |
MLV 346-1 to MLV 347-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) MLV 349-1 to MLV 350-1: PHMSA Immediate Anomaly Remediation (8/16/2024 - 11/1/2024) |
Station 405 HC Line (segment 299 FH) |
803 |
803 |
803 |
685 (118) |
803 |
803 |
Sta 405A: Unit 1A - 4K - 8K Solar Turbine Borescope Inspection (10/16/2024) Sta 405A: Unit 1A - 4k Water Wash (10/14/2024) |
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
||||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
November 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (11/4 - 11/10) |
Week 2 (11/11 - 11/17) |
Week 3 (11/18 - 11/24) |
Week 4 (11/25 - 12/1) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 409 (Donna Line) (segment 490 FH) |
541 |
541 |
541 |
541 |
541 |
|
MLV 406 (segment 406 BH) |
459 |
204 (255) |
459 |
459 |
459 |
MLV 400-1 to MLV 409-1: Pig Run - Maintenance Cleaning 11/5 (M) (11/5/2024) MLV 400-2 to MLV 409-2: Pig Run - Maintenance Cleaning 11/6 (11/6/2024) |
Station 1 (segment 101 BH) |
439 |
439 |
439 |
439 |
439 |
|
Station 9 (segment 109 BH) |
1,067 |
1,067 |
667 (400) |
1,067 |
1,067 |
MLV 5-2 to MLV 1-2D: Pig Runs - Maintenance Cleaning 11/14 (M) (11/14/2024) MLV 9-1S and MLV 1-1D: Pig Run - Maintenance Cleaning 11/12 (M) (11/12/2024) MLV 9-2 to MLV 5-2: Pig Runs - Maintenance Cleaning 11/14 (M) (11/14/2024) MLV 9-3 to MLV 4-3: Pig Runs - Maintenance Cleaning 11/13 (M) (11/13/2024) |
Station 17 (segment 117 BH) |
896 |
871 (25) |
871 (25) |
896 |
896 |
Sta 17: Unit 2C - Engine Seal Inspection (8/26/2023 - 11/15/2024) |
Station 25 (segment 125 BH) |
896 |
896 |
891 (5) |
896 |
896 |
MLV 20-1 to MLV 20-1R: Anomaly Remediation / Replacement (11/11/2024 - 11/16/2024) |
Station 40 South (segment 132 BH) |
896 |
896 |
896 |
896 |
896 |
|
Carthage Lateral (segment 700 FH) |
322 |
215 (107) |
322 |
322 |
322 |
MLV 706-1 to MLV 700-1: Pig Run - Maintenance (M) (11/7/2024) |
Station 47 (segment 143 BH) |
1,074 |
1,074 |
1,074 |
894 (180) |
894 (180) |
MLV 40-2D to MLV 42-2BR: Make Piggable (11/18/2024 - 11/26/2024) |
Station 63 (segment 163 BH) |
1,230 |
1120 (110) |
1120 (110) |
1120 (110) |
1120 (110) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) |
Station 823 (segment 823 BH) |
711 |
711 |
711 |
711 |
711 |
|
Station 834 (segment 834 BH) |
701 |
701 |
692 (9) |
692 (9) |
701 |
Sta 834: Unit 7A - 12K Engine Inspection (11/11/2024 - 11/23/2024) |
MLV 548 (segment 542 BH) |
1,667 |
1660 (7) |
1660 (7) |
1660 (7) |
1660 (7) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) |
Station 860 (segment 548 BH) |
1,593 |
1580 (13) |
1580 (13) |
1580 (13) |
1580 (13) |
Sta 555: Unit 4A - Foundation Regrout (9/3/2024 - 12/1/2024) |
Station 860 North (Segment 860 BH) |
1,892 |
1252 (640) |
1792 (100) |
1792 (100) |
1792 (100) |
MLV 560-1 to MLV 561-1: Class Change (10/30/2024 - 12/22/2024) MLV 863-1 to MLV 864-1: Class Change (11/4/2024 - 11/14/2024) Sta 563: Quarterly Safety Checks (11/4/2024 - 11/8/2024) Sta 860: Force Majeure (8/18/2023 - TBD) |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
November 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (11/4 - 11/10) |
Week 2 (11/11 - 11/17) |
Week 3 (11/18 - 11/24) |
Week 4 (11/25 - 12/1) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 110 (segment 187 BH) (south thru Kentucky) |
2,732 |
2630 (102) |
2630 (102) |
2730 (2) |
2730 (2) |
MLV 110-4 to MLV 106-4: Pig Runs - EMAT 11/5/24 (11/5/2024) MLV 96-3D to MLV 97-3: Anomaly Remediation (11/6/2024 - 11/17/2024) MLV 97-3 to MLV 98-3: Anomaly Remediation (10/25/2024 - 11/5/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 87: Unit 5C - Foundation Regrout (8/26/2024 - 11/29/2024) |
Station 114 (segment 114 BH) |
955 |
955 |
955 |
805 (150) |
955 |
Sta 119: Unit 1A - Turbine Inspection (11/18/2024 - 11/20/2024) |
Station 200 (segment 200 BH) |
1,830 |
1240 (590) |
1240 (590) |
1,830 |
1,830 |
MLV 200-2 to MLV 110-4: Pig Runs - AFD 11/12/24 (11/12/2024) MLV 200-2 to MLV 110-4: Pig Runs - Cleaning / Gauge 11/7/24 (11/7/2024) MLV 200-2 to MLV 110-4: Pig Runs - EMAT 11/14/24 (11/14/2024) |
Station 204 (Segment 204 BH) |
1,895 |
1845 (50) |
1845 (50) |
1800 (95) |
1800 (95) |
MLV 204-2 to MLV 200-2: Pig Runs - AFD 11/21/24 (11/21/2024) MLV 204-2 to MLV 200-2: Pig Runs - Cleaning / Gauge 11/19/23 (11/19/2024) MLV 204-2 to MLV 200-2: Pig Runs - EMAT 11/26/24 (11/26/2024) MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) |
Station 245 (segment 245 FH) |
1,065 |
1,065 |
1,065 |
1,065 |
1,065 |
|
Station 261 Discharge East (segment 261 FH) |
1,038 |
1,038 |
1,038 |
1,038 |
1,038 |
|
Station 307 (segment 307 BH) |
1,203 |
1,203 |
1055 (148) |
1,203 |
1,203 |
Sta 303: Unit 1A - Solar Software Upgrade (11/12/2024) |
Station 315 (segment 315 BH) |
1,900 |
1,900 |
1,900 |
1,900 |
1,900 |
|
MLV 324 (segment 324 FH) |
1,873 |
1,873 |
1,873 |
1,873 |
1,873 |
|
Station 405 HC Line (segment 299 FH) |
826 |
826 |
826 |
826 |
826 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
December 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (12/2 - 12/8) |
Week 2 (12/9 - 12/15) |
Week 3 (12/16 - 12/22) |
Week 4 (12/23 - 12/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 409 (Donna Line) (segment 490 FH) |
541 |
541 |
541 |
541 |
541 |
|
Station 1 (segment 101 BH) |
439 |
439 |
439 |
439 |
439 |
|
Station 9 (segment 109 BH) |
1,067 |
1,067 |
1,067 |
1,067 |
1,067 |
|
Station 25 (segment 125 BH) |
896 |
896 |
896 |
896 |
896 |
|
Station 40 South (segment 132 BH) |
896 |
896 |
896 |
896 |
896 |
|
Station 47 (segment 143 BH) |
1,074 |
894 (180) |
894 (180) |
1,074 |
1,074 |
Sta 40-2 to Sta 42-2: Pig Runs - Cleaning 12/3 to 12/4 (12/3/2024 - 12/4/2024) Sta 40-2 to Sta 42-2: Pig Runs - EMAT 12/12 (12/12/2024) Sta 40-2 to Sta 42-2: Pig Runs - MFL-C 12/10 (12/10/2024) Sta 40-2 to Sta 42-2: Pig Runs - MFL-S 12/5 (12/5/2024) |
Station 63 (segment 163 BH) |
1,230 |
1120 (110) |
1120 (110) |
1120 (110) |
1120 (110) |
MLV 54-1 to MLV 69-1: Force Majeure (2/26/2024 - TBD) |
Station 823 (segment 823 BH) |
711 |
711 |
711 |
711 |
711 |
|
MLV 548 (segment 542 BH) |
1,667 |
1660 (7) |
1660 (7) |
1660 (7) |
1660 (7) |
MLV 535-1A to MLV 536-1: Anomaly Remediation (10/25/2023 - 1/19/2025) |
Station 860 (segment 548 BH) |
1,593 |
1015 (578) |
1015 (578) |
1,593 |
1,593 |
MLV 555-2 to MLV 550-2: Pig Runs - Caliper/IMU 12/5 (12/5/2024) MLV 555-2 to MLV 550-2: Pig Runs - Cleaning 12/3 (12/3/2024) MLV 555-2 to MLV 550-2: Pig Runs - EMAT 12/11 (12/11/2024) MLV 555-2 to MLV 550-2: Pig Runs - MFL-C 12/9 (12/9/2024) |
Station 860 North (Segment 860 BH) |
1,892 |
1792 (100) |
1792 (100) |
1792 (100) |
1792 (100) |
MLV 560-1 to MLV 561-1: Class Change (10/30/2024 - 12/22/2024) Sta 860: Force Majeure (8/18/2023 - TBD) |
Station 110 (segment 187 BH) (south thru Kentucky) |
2,732 |
2670 (62) |
2670 (62) |
2670 (62) |
2730 (2) |
MLV 105-1 to MLV 102-1: Pig Runs - AFD 12/17 (12/17/2024) MLV 105-1 to MLV 102-1: Pig Runs - Cleaning 12/3 (12/3/2024) MLV 105-1 to MLV 102-1: Pig Runs - EMAT 12/19 (12/19/2024) MLV 105-1 to MLV 102-1: Pig Runs - MFL-A 12/5 (12/5/2024) MLV 105-1 to MLV 102-1: Pig Runs - MFL-S 12/10 (12/10/2024) Sta 106: Unit 1C - Engine Maintenance (7/15/2024 - 12/31/2024) Sta 106: Unit 1C - Water Leak (6/10/2024 - 12/31/2024) Sta 106: Unit 1D - 4k Hr Inspection (12/3/2024 - 12/5/2024) |
Station 114 (segment 114 BH) |
955 |
955 |
955 |
900 (55) |
955 |
Sta 118A: Unit 1A - 8K Turbine Inspection (12/16/2024 - 12/18/2024) |
Station 204 (Segment 204 BH) |
1,895 |
1845 (50) |
1,895 |
1,895 |
1,895 |
MLV 205-1 to MLV 205-1A: Class Change / Pipe Replacement (9/16/2024 - 12/6/2024) |
Station 245 (segment 245 FH) |
1,065 |
1,065 |
1,065 |
1,065 |
1,065 |
|
|
|
|
-Primary impact restrictions may be necessary |
|||
|
TGP - Outage Impact Report |
|
-Major impact restrictions may be necessary |
|||
|
December 2024 (updated 08/29/24) |
|
-Minor impact restrictions may be necessary depending on flow conditions |
|||
|
|
|
-Little to no impact, though minor outages may cause incremental reductions |
|||
Station # / Lateral |
Est Nominal Operating Capacity (Thousand Dth) |
Week 1 (12/2 - 12/8) |
Week 2 (12/9 - 12/15) |
Week 3 (12/16 - 12/22) |
Week 4 (12/23 - 12/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Station 261 Discharge East (segment 261 FH) |
1,038 |
1,038 |
1,038 |
1,038 |
1,038 |
|
Station 307 (segment 307 BH) |
1,203 |
1,203 |
1,203 |
1,203 |
1,203 |
|
Station 315 (segment 315 BH) |
1,900 |
1,900 |
1,900 |
1,900 |
1,900 |
|
MLV 324 (segment 324 FH) |
1,873 |
1,873 |
1,873 |
1,873 |
1,873 |
|
Station 405 HC Line (segment 299 FH) |
826 |
826 |
826 |
826 |
826 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |