Below is a summary of forecasted system capabilities for the posting period beginning March 7, 2025.            
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
  March 756903475236535251385
  March 856903475236535251385
  March 956903475236535251385
  March 1056903475234035251385
  March 1156903475236535251385
  March 1256903475236535251385
  March 1356903475236535251385
  March 1456903475236535251385
  March 1556903475236535251385
  March 1656903475236535251385
  March 1754753475236535251385

      Forecast system capabilities converted to energy at 38.5 MJ/m3.
  Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
  Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.  The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

  1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
  2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
  3Northern Ontario Line represents the flow east from Station 41.
  4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
  5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions.  If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.            

Notice Type
Maintenance

Effective Start Date Time
03/07/2025 6:00 am

Subject
TC Energy Planned Maintenance Mar 7-Mar 17, 2025

Notice Text
Below is a summary of forecasted system capabilities for the posting period beginning March 7, 2025.            
Prairies Line1
(TJ)
Emerson Extension2
(TJ)
Northern Ontario Line3
(TJ)
Eastern Delivery Area4
(TJ)
Downstream STN 1485
(TJ)
  March 756903475236535251385
  March 856903475236535251385
  March 956903475236535251385
  March 1056903475234035251385
  March 1156903475236535251385
  March 1256903475236535251385
  March 1356903475236535251385
  March 1456903475236535251385
  March 1556903475236535251385
  March 1656903475236535251385
  March 1754753475236535251385

      Forecast system capabilities converted to energy at 38.5 MJ/m3.
  Note that all system capabilities are based on a forecast delivery distribution and ambient temperature.
  Actual capabilities on the day may vary due to changes to the maintenance schedule, unplanned events, and differences between forecast and actual conditions.  The TC Energy system is an integrated system and capacity is affected by shipper nominations (load distribution) on any given day.

  1Prairies Line represents the sum of the receipts at Empress and Saskatchewan.
  2Emerson Extension represents the delivery to Emerson 1 plus Emerson 2.
  3Northern Ontario Line represents the flow east from Station 41.
  4Eastern Delivery Area represents the Eastern Ontario Triangle (EOT) flow east of Station 116 into the North Bay Shortcut plus the flow east of Mainline Valve 135 on the Montreal Line.
  5Downstream STN 148 represents the flow through Compressor Station 148 (Les Cedres), delivering to the TQM system as well as the Philipsburg and Napierville Extensions.  If deliveries upstream of STN 148 (e.g. EDA) are higher than forecast, it may affect ability to deliver up to the posted capacities downstream of STN 148.