Colorado Insterstate Gas Notice 122192
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP/TSP Name: 6914865-COLORADO INTERSTATE GAS CO. | Critical: Y |
Notice Type Desc (1): MAINTENANCE | Notice Type Desc (2): MAINTENANCE |
Notice Eff Date/Time: 02/10/2025 9:20:05AM | Notice End Date/Time: 02/11/2025 9:00:00am |
Post Date/Time: 2/10/2025 9:20:05 AM | Notice ID: 122192 |
Reqrd Rsp: 1 | Rsp Date: 02/10/2025 |
Notice Stat Desc: SUPERSEDE | Prior Notice: 122183 |
Subject: Spring Storage Field Maintenance V2 |
Colorado Interstate Gas Company, L.L.C. February 10, 2025 Storage Bottom Hole Pressure Surveys
|
The week that maintenance is scheduled for each field is listed below. Each field's maximum injection and withdrawal capability is shown as well as the field's related percentage of total injections/withdrawals and the net injection/withdrawal available for that week. These numbers are based on the projection that storage inventory will be within normal guidelines at the end of April. |
Outage Scheduled |
Field |
NNT Injection |
NNT Withdrawal |
||||
|
|
Field Contribution to Injection (MMcf/d) |
Field Percentage of Total Injection |
Total NNT Injection Available during Outage (MMcf/d) |
Field Contribution to Total Withdrawal (MMcf/d) |
Field Percentage of Total Withdrawal |
Total NNT Withdrawal Available during Outage (MMcf/d) |
March 18 – March 21 BHP & ILI pigging operations |
Flank- Morrow & Cherokee |
75 |
23.1 |
250 |
120 |
20.3 |
472 |
March 22 -March 25 |
Flank - Morrow |
75* |
23.1 |
325 |
120 |
20.3 |
532 |
March 26 – April 2 |
Flank - Cherokee |
75* |
23.1 |
325 |
120 |
22.6 |
472 |
April 16 – April 23 |
Latigo |
65 |
20.0 |
260 |
38 |
9.3 |
370 |
April 8 – April 15 |
Ft. Morgan |
125 |
38.5 |
200 |
270 |
60.1 |
179 |
May 2- May 9 |
Boehm |
60 |
18.5 |
265 |
10 |
2.9 |
331 |
*Note: Flank has two reservoirs which will be tested separately. Both reservoirs will be unavailable during the planned ILI pigging operations March 18-21 which will affect the withdrawal and injection capability. The Flank Morrow reservoir will be tested beginning March 21 through March 25 and Flank Cherokee reservoir will be tested beginning March 26 – April 2. The impact to injection capability will be minimal during the March 22 – April 2 period, and no reductions to customer's firm injection rights will be made during that time. |
During the Bottom Hole Pressure Surveys for FT. Morgan, Latigo and Boehm firm shippers' ADIQ will be reduced by the percentage indicted above consistent with Part IV: General Terms and Conditions (GT&C) Sections 1.2(c) and 11.6 of CIG's FERC Gas Tariff Second Revised Volume No.1. For example, during Ft. Morgan maintenance, shippers will be limited to 61.5% (100-38.5) of the Standard ADIQ |
Other Impacts to Shippers:
1. Shippers are asked to manage flowing supplies to keep injections and withdrawals within the adjusted limits. If small injection overruns occur, they will be based on the adjusted limits and will be authorized for NNT customers. However, if operational concerns arise because of higher levels of overrun injections, a Strained Operating Condition (SOC) may need to be implemented, and overruns will not be authorized. |
2. During the week of the Ft. Morgan outage, injections under the High Available Daily Injection Quantity (High ADIQ) option described in GT&C Section 1.2 will not be supported. |
3. Injections to and withdrawals from interruptible storage accounts will not be scheduled during the period of Bottom Hole Pressure Surveys. |
For scheduling questions, please contact the Nominations and Scheduling Hotline 1-800-238-3764, option 2. |
Any comments or questions about this report should be directed to Vic Villalva (719) 520-4251 or Cheryl Bauer (719) 520-4423. |
For contractual issues, please contact your Marketing Representative. |
Thank you for your assistance during this storage field maintenance. |
Cheryl Bauer |
Manager, CIG Gas Control Kinder Morgan Western Pipelines |
TSP/TSP Name: 6914865-COLORADO INTERSTATE GAS CO. | Critical: Y |
Notice Type Desc (1): MAINTENANCE | Notice Type Desc (2): MAINTENANCE |
Notice Eff Date/Time: 02/10/2025 9:20:05AM | Notice End Date/Time: 02/11/2025 9:00:00am |
Post Date/Time: 2/10/2025 9:20:05 AM | Notice ID: 122192 |
Reqrd Rsp: 1 | Rsp Date: 02/10/2025 |
Notice Stat Desc: SUPERSEDE | Prior Notice: 122183 |
Subject: Spring Storage Field Maintenance V2 |
Colorado Interstate Gas Company, L.L.C. February 10, 2025 Storage Bottom Hole Pressure Surveys
|
The week that maintenance is scheduled for each field is listed below. Each field's maximum injection and withdrawal capability is shown as well as the field's related percentage of total injections/withdrawals and the net injection/withdrawal available for that week. These numbers are based on the projection that storage inventory will be within normal guidelines at the end of April. |
Outage Scheduled |
Field |
NNT Injection |
NNT Withdrawal |
||||
|
|
Field Contribution to Injection (MMcf/d) |
Field Percentage of Total Injection |
Total NNT Injection Available during Outage (MMcf/d) |
Field Contribution to Total Withdrawal (MMcf/d) |
Field Percentage of Total Withdrawal |
Total NNT Withdrawal Available during Outage (MMcf/d) |
March 18 – March 21 BHP & ILI pigging operations |
Flank- Morrow & Cherokee |
75 |
23.1 |
250 |
120 |
20.3 |
472 |
March 22 -March 25 |
Flank - Morrow |
75* |
23.1 |
325 |
120 |
20.3 |
532 |
March 26 – April 2 |
Flank - Cherokee |
75* |
23.1 |
325 |
120 |
22.6 |
472 |
April 16 – April 23 |
Latigo |
65 |
20.0 |
260 |
38 |
9.3 |
370 |
April 8 – April 15 |
Ft. Morgan |
125 |
38.5 |
200 |
270 |
60.1 |
179 |
May 2- May 9 |
Boehm |
60 |
18.5 |
265 |
10 |
2.9 |
331 |
*Note: Flank has two reservoirs which will be tested separately. Both reservoirs will be unavailable during the planned ILI pigging operations March 18-21 which will affect the withdrawal and injection capability. The Flank Morrow reservoir will be tested beginning March 21 through March 25 and Flank Cherokee reservoir will be tested beginning March 26 – April 2. The impact to injection capability will be minimal during the March 22 – April 2 period, and no reductions to customer's firm injection rights will be made during that time. |
During the Bottom Hole Pressure Surveys for FT. Morgan, Latigo and Boehm firm shippers' ADIQ will be reduced by the percentage indicted above consistent with Part IV: General Terms and Conditions (GT&C) Sections 1.2(c) and 11.6 of CIG's FERC Gas Tariff Second Revised Volume No.1. For example, during Ft. Morgan maintenance, shippers will be limited to 61.5% (100-38.5) of the Standard ADIQ |
Other Impacts to Shippers:
1. Shippers are asked to manage flowing supplies to keep injections and withdrawals within the adjusted limits. If small injection overruns occur, they will be based on the adjusted limits and will be authorized for NNT customers. However, if operational concerns arise because of higher levels of overrun injections, a Strained Operating Condition (SOC) may need to be implemented, and overruns will not be authorized. |
2. During the week of the Ft. Morgan outage, injections under the High Available Daily Injection Quantity (High ADIQ) option described in GT&C Section 1.2 will not be supported. |
3. Injections to and withdrawals from interruptible storage accounts will not be scheduled during the period of Bottom Hole Pressure Surveys. |
For scheduling questions, please contact the Nominations and Scheduling Hotline 1-800-238-3764, option 2. |
Any comments or questions about this report should be directed to Vic Villalva (719) 520-4251 or Cheryl Bauer (719) 520-4423. |
For contractual issues, please contact your Marketing Representative. |
Thank you for your assistance during this storage field maintenance. |
Cheryl Bauer |
Manager, CIG Gas Control Kinder Morgan Western Pipelines |