Southern Natural Gas Notice 710165
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
TSP/TSP Name: 6900518-SOUTHERN NATURAL GAS CO. | Critical: Y |
Notice Type Desc (1): MAINTENANCE | Notice Type Desc (2): MAINTENANCE |
Notice Eff Date/Time: 12/12/2024 2:43:31PM | Notice End Date/Time: 12/13/2024 9:00:00am |
Post Date/Time: 12/12/2024 2:43:31 PM | Notice ID: 710165 |
Reqrd Rsp: 1 | Rsp Date: 12/12/2024 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: Outage Impact Report |
|
|
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
||
|
|
|
SNG - Outage Impact Report |
|
|
|
-Restrictions to In-Path transportation services may be necessary. |
||
|
|
Seven Day Forecast (updated 12/12/24) |
|
|
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
|
|
|
|
|
|
-No anticipated impact to transportation services. |
|||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Monday (12/16) |
Tuesday (12/17) |
Wednesday (12/18) |
Thursday (12/19) |
Friday (12/20) |
Saturday (12/21) |
Sunday (12/22) |
Primary Outage(s) that may Impact Throughput |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
355 |
355 |
355 |
|
LA East Leg (Segment 330) |
1,010 |
445 (565) |
445 (565) |
445 (565) |
445 (565) |
445 (565) |
445 (565) |
1,010 |
Main Pass Franklinton loop line south of Franklinton: Pipeline maintenance (12/16/2024 - 12/21/2024) |
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
506 |
506 |
506 |
506 |
506 |
506 |
506 |
506 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
234 |
234 |
234 |
|
Gwinville East (segment 410) |
1,802 |
1647 (155) |
1647 (155) |
1647 (155) |
1,802 |
1,802 |
1,802 |
1,802 |
Gwinville Compressor Station: Unit Maintenance Proj-521113 (12/16/2024 - 12/18/2024) |
Enterprise (segment 430) |
2,450 |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
Enterprise compressor station: unscheduled unit outage-Project 5222-8 (11/25/2024 - 1/9/2025) |
Auburn (segment 460) |
2,095 |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
Auburn compressor station: Unscheduled unit outage (12/2/2024 - 12/22/2024) |
Ellerslie (segment 490) |
1,663 |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
Ellerslie compressor station: Unscheduled unit outage-5267-4 (11/14/2024 - 1/30/2025) |
Thomaston West (segment 490) |
1,650 |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
Thomaston compressor station: Unscheduled unit outage-5272-4 (12/1/2024 - 12/22/2024) |
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
143 |
143 |
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
|
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
|
|
December 2024 (updated 12/12/24) |
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
-No anticipated impact to transportation services. |
||||||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (12/2 - 12/8) |
Week 2 (12/9 - 12/15) |
Week 3 (12/16 - 12/22) |
Week 4 (12/23 - 12/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Onward (segment 30) |
209 |
|
|
|
209 |
|
Duncanville Lateral (segment 90) |
36 |
|
|
|
36 |
|
Dearmanville (segment 150) |
355 |
|
|
|
355 |
|
White Castle (segment 340) |
798 |
|
|
|
798 |
|
Sesh (segment 380) |
506 |
|
|
|
506 |
|
Gwinville (segment 400) |
234 |
|
|
|
234 |
|
|
|
|
|
|
|
Enterprise compressor station: unscheduled unit outage-Project 5222-8 (11/25/2024 - 1/9/2025) |
Enterprise (segment 430) |
2,450 |
2395 (55) |
|
|||
|
|
|
|
|
|
Ellerslie compressor station: Unscheduled unit outage-5267-4 (11/14/2024 - 1/30/2025) |
Ellerslie (segment 490) |
1,663 |
1633 (30) |
|
|||
South Atlanta (segment 510) |
537 |
|
|
|
537 |
|
Thomaston East (segment 530) |
900 |
|
|
|
900 |
|
South Georgia (segment 650) |
143 |
|
|
|
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
||
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
||
|
|
January 2025 (updated 12/12/24) |
|
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
||
|
|
|
|
|
-No anticipated impact to transportation services. |
||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (12/30 - 1/5) |
Week 2 (1/6 - 1/12) |
Week 3 (1/13 - 1/19) |
Week 4 (1/20 - 1/26) |
Week 5 (1/27 - 2/2) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
355 |
|
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
500 |
500 |
500 |
500 |
500 |
500 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
234 |
|
Enterprise (segment 430) |
2,450 |
2395 (55) |
2395 (55) |
2,450 |
2,450 |
2,450 |
Enterprise compressor station: unscheduled unit outage-Project 5222-8 (11/25/2024 - 1/9/2025) |
Ellerslie (segment 490) |
1,663 |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
Ellerslie compressor station: Unscheduled unit outage-5267-4 (11/14/2024 - 1/30/2025) |
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
|
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
|
|
February 2025 (updated 12/12/24) |
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
-No anticipated impact to transportation services. |
||||||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (2/3 - 2/9) |
Week 2 (2/10 - 2/16) |
Week 3 (2/17 - 2/23) |
Week 4 (2/24 - 3/2) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
|
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
500 |
500 |
500 |
500 |
500 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
|
Enterprise (segment 430) |
2,450 |
2,450 |
2,450 |
2,450 |
2,450 |
|
Ellerslie (segment 490) |
1,663 |
1,663 |
1,663 |
1,663 |
1,663 |
|
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
|
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
|
|
March 2025 (updated 12/12/24) |
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
-No anticipated impact to transportation services. |
||||||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (3/3 - 3/9) |
Week 2 (3/10 - 3/16) |
Week 3 (3/17 - 3/23) |
Week 4 (3/24 - 3/30) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
|
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
500 |
500 |
500 |
500 |
500 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
|
Enterprise (segment 430) |
2,450 |
2,450 |
2,450 |
2,450 |
2,450 |
|
Ellerslie (segment 490) |
1,663 |
1,663 |
1,663 |
1,663 |
1,663 |
|
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
|
Holy Trinity (segment 655) |
143 |
143 |
143 |
143 |
113 (30) |
Holy Trinity Compressor Station: Unit maintenance, Proj-58051 (3/30/2025) |
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
TSP/TSP Name: 6900518-SOUTHERN NATURAL GAS CO. | Critical: Y |
Notice Type Desc (1): MAINTENANCE | Notice Type Desc (2): MAINTENANCE |
Notice Eff Date/Time: 12/12/2024 2:43:31PM | Notice End Date/Time: 12/13/2024 9:00:00am |
Post Date/Time: 12/12/2024 2:43:31 PM | Notice ID: 710165 |
Reqrd Rsp: 1 | Rsp Date: 12/12/2024 |
Notice Stat Desc: INITIATE | Prior Notice: |
Subject: Outage Impact Report |
|
|
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
||
|
|
|
SNG - Outage Impact Report |
|
|
|
-Restrictions to In-Path transportation services may be necessary. |
||
|
|
Seven Day Forecast (updated 12/12/24) |
|
|
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
|
|
|
|
|
|
-No anticipated impact to transportation services. |
|||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Monday (12/16) |
Tuesday (12/17) |
Wednesday (12/18) |
Thursday (12/19) |
Friday (12/20) |
Saturday (12/21) |
Sunday (12/22) |
Primary Outage(s) that may Impact Throughput |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
355 |
355 |
355 |
|
LA East Leg (Segment 330) |
1,010 |
445 (565) |
445 (565) |
445 (565) |
445 (565) |
445 (565) |
445 (565) |
1,010 |
Main Pass Franklinton loop line south of Franklinton: Pipeline maintenance (12/16/2024 - 12/21/2024) |
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
506 |
506 |
506 |
506 |
506 |
506 |
506 |
506 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
234 |
234 |
234 |
|
Gwinville East (segment 410) |
1,802 |
1647 (155) |
1647 (155) |
1647 (155) |
1,802 |
1,802 |
1,802 |
1,802 |
Gwinville Compressor Station: Unit Maintenance Proj-521113 (12/16/2024 - 12/18/2024) |
Enterprise (segment 430) |
2,450 |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
2395 (55) |
Enterprise compressor station: unscheduled unit outage-Project 5222-8 (11/25/2024 - 1/9/2025) |
Auburn (segment 460) |
2,095 |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
1975 (120) |
Auburn compressor station: Unscheduled unit outage (12/2/2024 - 12/22/2024) |
Ellerslie (segment 490) |
1,663 |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
Ellerslie compressor station: Unscheduled unit outage-5267-4 (11/14/2024 - 1/30/2025) |
Thomaston West (segment 490) |
1,650 |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
1605 (45) |
Thomaston compressor station: Unscheduled unit outage-5272-4 (12/1/2024 - 12/22/2024) |
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
143 |
143 |
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
|
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
|
|
December 2024 (updated 12/12/24) |
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
-No anticipated impact to transportation services. |
||||||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (12/2 - 12/8) |
Week 2 (12/9 - 12/15) |
Week 3 (12/16 - 12/22) |
Week 4 (12/23 - 12/29) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Onward (segment 30) |
209 |
|
|
|
209 |
|
Duncanville Lateral (segment 90) |
36 |
|
|
|
36 |
|
Dearmanville (segment 150) |
355 |
|
|
|
355 |
|
White Castle (segment 340) |
798 |
|
|
|
798 |
|
Sesh (segment 380) |
506 |
|
|
|
506 |
|
Gwinville (segment 400) |
234 |
|
|
|
234 |
|
|
|
|
|
|
|
Enterprise compressor station: unscheduled unit outage-Project 5222-8 (11/25/2024 - 1/9/2025) |
Enterprise (segment 430) |
2,450 |
2395 (55) |
|
|||
|
|
|
|
|
|
Ellerslie compressor station: Unscheduled unit outage-5267-4 (11/14/2024 - 1/30/2025) |
Ellerslie (segment 490) |
1,663 |
1633 (30) |
|
|||
South Atlanta (segment 510) |
537 |
|
|
|
537 |
|
Thomaston East (segment 530) |
900 |
|
|
|
900 |
|
South Georgia (segment 650) |
143 |
|
|
|
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
||
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
||
|
|
January 2025 (updated 12/12/24) |
|
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
||
|
|
|
|
|
-No anticipated impact to transportation services. |
||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (12/30 - 1/5) |
Week 2 (1/6 - 1/12) |
Week 3 (1/13 - 1/19) |
Week 4 (1/20 - 1/26) |
Week 5 (1/27 - 2/2) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
|||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
355 |
|
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
500 |
500 |
500 |
500 |
500 |
500 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
234 |
|
Enterprise (segment 430) |
2,450 |
2395 (55) |
2395 (55) |
2,450 |
2,450 |
2,450 |
Enterprise compressor station: unscheduled unit outage-Project 5222-8 (11/25/2024 - 1/9/2025) |
Ellerslie (segment 490) |
1,663 |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
1633 (30) |
Ellerslie compressor station: Unscheduled unit outage-5267-4 (11/14/2024 - 1/30/2025) |
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
|
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
|
|
February 2025 (updated 12/12/24) |
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
-No anticipated impact to transportation services. |
||||||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (2/3 - 2/9) |
Week 2 (2/10 - 2/16) |
Week 3 (2/17 - 2/23) |
Week 4 (2/24 - 3/2) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
|
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
500 |
500 |
500 |
500 |
500 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
|
Enterprise (segment 430) |
2,450 |
2,450 |
2,450 |
2,450 |
2,450 |
|
Ellerslie (segment 490) |
1,663 |
1,663 |
1,663 |
1,663 |
1,663 |
|
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
|
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |
|
|
|
|
|
-Restrictions to Primary In-Path transportation services may be necessary. |
|
|
|
SNG - Outage Impact Report |
|
|
-Restrictions to In-Path transportation services may be necessary. |
|
|
March 2025 (updated 12/12/24) |
|
-Restrictions to Interruptible and Out of Path transportation services may be necessary. |
|||
-No anticipated impact to transportation services. |
||||||
Station / Seg |
Est Nominal Design Capacity (Thousand Dth) |
Week 1 (3/3 - 3/9) |
Week 2 (3/10 - 3/16) |
Week 3 (3/17 - 3/23) |
Week 4 (3/24 - 3/30) |
Primary Outage(s) |
Est. Operational Capacity (Operational Impact) - Thousand Dth |
||||||
Onward (segment 30) |
209 |
209 |
209 |
209 |
209 |
|
Duncanville Lateral (segment 90) |
36 |
36 |
36 |
36 |
36 |
|
Dearmanville (segment 150) |
355 |
355 |
355 |
355 |
355 |
|
White Castle (segment 340) |
798 |
798 |
798 |
798 |
798 |
|
Sesh (segment 380) |
500 |
500 |
500 |
500 |
500 |
|
Gwinville (segment 400) |
234 |
234 |
234 |
234 |
234 |
|
Enterprise (segment 430) |
2,450 |
2,450 |
2,450 |
2,450 |
2,450 |
|
Ellerslie (segment 490) |
1,663 |
1,663 |
1,663 |
1,663 |
1,663 |
|
South Atlanta (segment 510) |
537 |
537 |
537 |
537 |
537 |
|
Thomaston East (segment 530) |
900 |
900 |
900 |
900 |
900 |
|
South Georgia (segment 650) |
143 |
143 |
143 |
143 |
143 |
|
Holy Trinity (segment 655) |
143 |
143 |
143 |
143 |
113 (30) |
Holy Trinity Compressor Station: Unit maintenance, Proj-58051 (3/30/2025) |
This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses. Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages. |