TSP/TSP Name:  6900518-SOUTHERN NATURAL GAS CO. Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  02/06/2025 4:00:07PM Notice End Date/Time:  02/07/2025 9:00:00am
Post Date/Time:  2/6/2025 4:00:07 PM Notice ID: 710373
Reqrd Rsp:  1 Rsp Date:  02/06/2025
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

 

SNG - Outage Impact Report

 

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

Seven Day Forecast (updated 02/06/25)

 

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

 

-No anticipated impact to transportation services.

 

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

 

Monday (2/10)

 

Tuesday (2/11)

 

Wednesday (2/12)

 

Thursday (2/13)

 

Friday (2/14)

 

Saturday (2/15)

 

Sunday (2/16)

 

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

Gwinville Pool (segment 390)

 

 

1,707

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

Gwinville Compressor Station: Scheduled Station Maintenance Proj-5211P2 (2/5/2025 - 2/26/2025)

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Enterprise (segment 430)

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

Ellerslie (segment 490)

 

 

1,663

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

Ellerslie Compressor Station: Scheduled Unit Maintenance Proj-52675 (2/10/2025 - 2/23/2025)

Ellerslie compressor station: Unscheduled unit outage Project-52674 (11/14/2024 - 2/23/2025)

 

Thomaston West (segment 490)

 

 

1,650

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

Thomaston Compressor Station: Unscheduled Unit Outage Proj-52724 (1/30/2025 - 3/16/2025)

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

February 2025 (updated 02/06/25)

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (2/3 - 2/9)

Week 2 (2/10 - 2/16)

Week 3 (2/17 - 2/23)

Week 4 (2/24 - 3/2)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

506

 

 

 

 

506

 

 

506

 

 

Gwinville Pool (segment 390)

 

 

1,707

 

 

 

1497

(210)

 

1497

(210)

Gwinville Compressor Station: Scheduled Station Maintenance, Proj-5211P2 (2/5/2025 - 2/26/2025)

 

Gwinville (segment 400)

 

 

234

 

 

 

 

234

 

 

234

 

 

Enterprise (segment 430)

 

 

2,450

 

 

 

 

2,450

 

 

2,450

 

 

Auburn (segment 460)

 

 

2,095

 

 

 

1740

(355)

 

1740

(355)

Auburn Compressor Station: Scheduled Station Maintenance, Proj-5259 (2/17/2025 - 2/24/2025)

 

Ellerslie (segment 490)

 

 

1,663

 

 

 

1593

(70)

 

 

1,663

Ellerslie Compressor Station: Scheduled Unit Maintenance, Proj-52675 (2/10/2025 - 2/23/2025) Ellerslie compressor station: Unscheduled unit outage, Project-52674 (11/14/2024 - 2/23/2025)

 

Thomaston West (segment 490)

 

 

1,650

 

 

 

1605

(45)

 

1605

(45)

Thomaston Compressor Station: Unscheduled Unit Outage, Proj-52724 (1/30/2025 - 3/16/2025)

 

South Atlanta (segment 510)

 

 

537

 

 

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

March 2025 (updated 02/06/25)

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (3/3 - 3/9)

Week 2 (3/10 - 3/16)

Week 3 (3/17 - 3/23)

Week 4 (3/24 - 3/30)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

 

 

 

Gwinville (segment 400)

 

 

 

 

234

 

 

 

157

(77)

 

 

 

157

(77)

 

 

 

182

(52)

 

 

 

182

(52)

Gwinville Pickens Line north of Gwinville: Pipeline Maintenance(remediation), Proj-SNG-19050/20646 (3/22/2025 - 3/28/2025)

Gwinville Pickens Line north of Rankin: Pipeline Maintenance(remediation), Proj-SNG-19128 (3/17/2025

- 3/20/2025)

Gwinville Pickens Line south of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19128 (3/13/2025 - 3/14/2025)

Gwinville Pickens Line south of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19128/26277 (3/3/2025 - 3/10/2025)

Gwinville Pickens Line south of Rankin: Pipeline Maintenance(remediation), Proj-SNG-19050 (3/20/2025 - 3/21/2025)

 

Enterprise (segment 430)

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

2200

(250)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-522216 (3/24/2025 - 3/31/2025)

 

Auburn (segment 460)

 

 

2,095

 

 

2,095

 

1770

(325)

 

1770

(325)

 

 

2,095

South Main Loop Line east of Auburn: Scheduled Pipeline Maintenance, Proj-SNG-24941 (3/14/2025 - 3/23/2025)

South Main Loop Line west of Ellerslie: Scheduled Pipeline Maintenance, Proj-SNG-24942 (3/14/2025 - 3/23/2025)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

Thomaston West (segment 490)

 

 

1,650

 

1605

(45)

 

1605

(45)

 

 

1,650

 

 

1,650

Thomaston Compressor Station: Unscheduled Unit Outage, Proj-52724 (1/30/2025 - 3/16/2025)

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

April 2025 (updated 02/06/25)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (3/31 - 4/6)

Week 2 (4/7 - 4/13)

Week 3 (4/14 - 4/20)

Week 4 (4/21 - 4/27)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

203

 

 

203

 

 

203

 

 

203

 

 

203

 

 

Louisville East (segment 50)

 

 

520

 

 

520

 

210

(310)

 

210

(310)

 

275

(245)

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (4/21/2025 - 5/2/2025)

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (M) (4/8/2025

- 4/18/2025)

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

346

 

 

346

 

 

346

 

 

346

 

 

346

 

 

White Castle (segment 340)

 

 

772

 

 

772

 

 

772

 

 

772

 

 

772

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

199

(35)

 

150

(84)

 

150

(84)

 

 

234

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (4/8/2025 - 4/18/2025)

Gwinville Pickens Line north of Gwinville: Pipeline Maintenance(remediation), Proj-SNG- 19050/20646/21938 (3/31/2025 - 4/7/2025)

 

Enterprise (segment 430)

 

 

2,306

 

2056

(250)

 

2136

(170)

 

 

2,306

 

 

2,306

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-522216 (3/24/2025 - 3/31/2025) Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-522216 (4/1/2025 - 4/7/2025)

 

Selma (segment 460)

 

 

2,293

 

 

2,293

 

 

2,293

 

1993

(300)

 

1993

(300)

South Main Loop Line east of Selma: Scheduled Pipeline Maintenance, Proj-SNG-24945 (4/18/2025 - 4/25/2025)

 

Auburn (segment 460)

 

 

1,953

 

1813

(140)

 

1813

(140)

 

1813

(140)

 

 

1,953

South Main Loop Line west of Ellerslie: Scheduled Pipeline Maintenance, Proj-SNG-24943 (4/5/2025 - 4/14/2025)

South Main Loop Line west of Ellerslie: Scheduled Pipeline Maintenance, Proj-SNG-24944 (4/5/2025 - 4/14/2025)

 

Ellerslie (segment 490)

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

South Atlanta (segment 510)

 

 

522

 

 

522

 

 

522

 

 

522

 

 

522

 

 

Thomaston East (segment 530)

 

 

849

 

 

849

 

 

849

 

 

849

 

 

849

 

 

South Georgia (segment 650)

 

 

127

 

 

127

 

 

127

 

 

127

 

 

127

 

 

Holy Trinity (segment 655)

 

 

127

 

 

127

 

97

(30)

 

 

127

 

 

127

Holy Trinity Compressor Station: Scheduled Unit Maintenannce, Proj-58051 (4/7/2025 - 4/12/2025)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

May 2025 (updated 02/06/25)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (4/28 - 5/4)

Week 2 (5/5 - 5/11)

Week 3 (5/12 - 5/18)

Week 4 (5/19 - 5/25)

Week 5 (5/26 - 6/1)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

203

 

 

203

 

 

203

 

 

203

 

 

203

 

 

203

 

 

Louisville East (segment 50)

 

 

520

 

275

(245)

 

 

520

 

 

520

 

 

520

 

 

520

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (4/21/2025 - 5/2/2025)

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

346

 

 

346

 

 

346

 

 

346

 

 

346

 

 

346

 

 

White Castle (segment 340)

 

 

772

 

 

772

 

 

772

 

 

772

 

 

772

 

 

772

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

150

(84)

 

150

(84)

 

150

(84)

 

 

234

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (5/5/2025 - 5/21/2025)

 

Enterprise (segment 430)

 

 

2,306

 

 

2,306

 

 

2,306

 

 

2,306

 

 

2,306

 

 

2,306

 

 

Ellerslie (segment 490)

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

South Atlanta (segment 510)

 

 

522

 

 

522

 

 

522

 

 

522

 

 

522

 

 

522

 

 

Thomaston East (segment 530)

 

 

849

 

 

849

 

 

849

 

 

849

 

 

849

 

 

849

 

 

South Georgia (segment 650)

 

 

127

 

 

127

 

 

127

 

 

127

 

 

127

 

 

127

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.

 

TSP/TSP Name:  6900518-SOUTHERN NATURAL GAS CO. Critical: Y
Notice Type Desc (1):  MAINTENANCE Notice Type Desc (2):  MAINTENANCE
Notice Eff Date/Time:  02/06/2025 4:00:07PM Notice End Date/Time:  02/07/2025 9:00:00am
Post Date/Time:  2/6/2025 4:00:07 PM Notice ID: 710373
Reqrd Rsp:  1 Rsp Date:  02/06/2025
Notice Stat Desc:  INITIATE Prior Notice: 
Subject:  Outage Impact Report
Notice Text:

 

 

 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

 

SNG - Outage Impact Report

 

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

Seven Day Forecast (updated 02/06/25)

 

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

 

-No anticipated impact to transportation services.

 

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

 

Monday (2/10)

 

Tuesday (2/11)

 

Wednesday (2/12)

 

Thursday (2/13)

 

Friday (2/14)

 

Saturday (2/15)

 

Sunday (2/16)

 

 

Primary Outage(s) that may Impact Throughput

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

506

 

 

Gwinville Pool (segment 390)

 

 

1,707

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

 

1497

(210)

Gwinville Compressor Station: Scheduled Station Maintenance Proj-5211P2 (2/5/2025 - 2/26/2025)

 

Gwinville (segment 400)

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

234

 

 

Enterprise (segment 430)

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

 

Ellerslie (segment 490)

 

 

1,663

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

 

1593

(70)

Ellerslie Compressor Station: Scheduled Unit Maintenance Proj-52675 (2/10/2025 - 2/23/2025)

Ellerslie compressor station: Unscheduled unit outage Project-52674 (11/14/2024 - 2/23/2025)

 

Thomaston West (segment 490)

 

 

1,650

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

 

1605

(45)

Thomaston Compressor Station: Unscheduled Unit Outage Proj-52724 (1/30/2025 - 3/16/2025)

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report. The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

February 2025 (updated 02/06/25)

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (2/3 - 2/9)

Week 2 (2/10 - 2/16)

Week 3 (2/17 - 2/23)

Week 4 (2/24 - 3/2)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

506

 

 

 

 

506

 

 

506

 

 

Gwinville Pool (segment 390)

 

 

1,707

 

 

 

1497

(210)

 

1497

(210)

Gwinville Compressor Station: Scheduled Station Maintenance, Proj-5211P2 (2/5/2025 - 2/26/2025)

 

Gwinville (segment 400)

 

 

234

 

 

 

 

234

 

 

234

 

 

Enterprise (segment 430)

 

 

2,450

 

 

 

 

2,450

 

 

2,450

 

 

Auburn (segment 460)

 

 

2,095

 

 

 

1740

(355)

 

1740

(355)

Auburn Compressor Station: Scheduled Station Maintenance, Proj-5259 (2/17/2025 - 2/24/2025)

 

Ellerslie (segment 490)

 

 

1,663

 

 

 

1593

(70)

 

 

1,663

Ellerslie Compressor Station: Scheduled Unit Maintenance, Proj-52675 (2/10/2025 - 2/23/2025) Ellerslie compressor station: Unscheduled unit outage, Project-52674 (11/14/2024 - 2/23/2025)

 

Thomaston West (segment 490)

 

 

1,650

 

 

 

1605

(45)

 

1605

(45)

Thomaston Compressor Station: Unscheduled Unit Outage, Proj-52724 (1/30/2025 - 3/16/2025)

 

South Atlanta (segment 510)

 

 

537

 

 

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

March 2025 (updated 02/06/25)

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (3/3 - 3/9)

Week 2 (3/10 - 3/16)

Week 3 (3/17 - 3/23)

Week 4 (3/24 - 3/30)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

209

 

 

209

 

 

209

 

 

209

 

 

209

 

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

355

 

 

355

 

 

355

 

 

355

 

 

355

 

 

White Castle (segment 340)

 

 

798

 

 

798

 

 

798

 

 

798

 

 

798

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

 

 

 

Gwinville (segment 400)

 

 

 

 

234

 

 

 

157

(77)

 

 

 

157

(77)

 

 

 

182

(52)

 

 

 

182

(52)

Gwinville Pickens Line north of Gwinville: Pipeline Maintenance(remediation), Proj-SNG-19050/20646 (3/22/2025 - 3/28/2025)

Gwinville Pickens Line north of Rankin: Pipeline Maintenance(remediation), Proj-SNG-19128 (3/17/2025

- 3/20/2025)

Gwinville Pickens Line south of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19128 (3/13/2025 - 3/14/2025)

Gwinville Pickens Line south of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19128/26277 (3/3/2025 - 3/10/2025)

Gwinville Pickens Line south of Rankin: Pipeline Maintenance(remediation), Proj-SNG-19050 (3/20/2025 - 3/21/2025)

 

Enterprise (segment 430)

 

 

2,450

 

 

2,450

 

 

2,450

 

 

2,450

 

2200

(250)

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-522216 (3/24/2025 - 3/31/2025)

 

Auburn (segment 460)

 

 

2,095

 

 

2,095

 

1770

(325)

 

1770

(325)

 

 

2,095

South Main Loop Line east of Auburn: Scheduled Pipeline Maintenance, Proj-SNG-24941 (3/14/2025 - 3/23/2025)

South Main Loop Line west of Ellerslie: Scheduled Pipeline Maintenance, Proj-SNG-24942 (3/14/2025 - 3/23/2025)

 

Ellerslie (segment 490)

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

1,663

 

 

Thomaston West (segment 490)

 

 

1,650

 

1605

(45)

 

1605

(45)

 

 

1,650

 

 

1,650

Thomaston Compressor Station: Unscheduled Unit Outage, Proj-52724 (1/30/2025 - 3/16/2025)

 

South Atlanta (segment 510)

 

 

537

 

 

537

 

 

537

 

 

537

 

 

537

 

 

Thomaston East (segment 530)

 

 

900

 

 

900

 

 

900

 

 

900

 

 

900

 

 

South Georgia (segment 650)

 

 

143

 

 

143

 

 

143

 

 

143

 

 

143

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

April 2025 (updated 02/06/25)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (3/31 - 4/6)

Week 2 (4/7 - 4/13)

Week 3 (4/14 - 4/20)

Week 4 (4/21 - 4/27)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

203

 

 

203

 

 

203

 

 

203

 

 

203

 

 

Louisville East (segment 50)

 

 

520

 

 

520

 

210

(310)

 

210

(310)

 

275

(245)

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (4/21/2025 - 5/2/2025)

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (M) (4/8/2025

- 4/18/2025)

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

346

 

 

346

 

 

346

 

 

346

 

 

346

 

 

White Castle (segment 340)

 

 

772

 

 

772

 

 

772

 

 

772

 

 

772

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

199

(35)

 

150

(84)

 

150

(84)

 

 

234

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (4/8/2025 - 4/18/2025)

Gwinville Pickens Line north of Gwinville: Pipeline Maintenance(remediation), Proj-SNG- 19050/20646/21938 (3/31/2025 - 4/7/2025)

 

Enterprise (segment 430)

 

 

2,306

 

2056

(250)

 

2136

(170)

 

 

2,306

 

 

2,306

Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-522216 (3/24/2025 - 3/31/2025) Enterprise Compressor Station: Scheduled Unit Maintenance, Proj-522216 (4/1/2025 - 4/7/2025)

 

Selma (segment 460)

 

 

2,293

 

 

2,293

 

 

2,293

 

1993

(300)

 

1993

(300)

South Main Loop Line east of Selma: Scheduled Pipeline Maintenance, Proj-SNG-24945 (4/18/2025 - 4/25/2025)

 

Auburn (segment 460)

 

 

1,953

 

1813

(140)

 

1813

(140)

 

1813

(140)

 

 

1,953

South Main Loop Line west of Ellerslie: Scheduled Pipeline Maintenance, Proj-SNG-24943 (4/5/2025 - 4/14/2025)

South Main Loop Line west of Ellerslie: Scheduled Pipeline Maintenance, Proj-SNG-24944 (4/5/2025 - 4/14/2025)

 

Ellerslie (segment 490)

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

South Atlanta (segment 510)

 

 

522

 

 

522

 

 

522

 

 

522

 

 

522

 

 

Thomaston East (segment 530)

 

 

849

 

 

849

 

 

849

 

 

849

 

 

849

 

 

South Georgia (segment 650)

 

 

127

 

 

127

 

 

127

 

 

127

 

 

127

 

 

Holy Trinity (segment 655)

 

 

127

 

 

127

 

97

(30)

 

 

127

 

 

127

Holy Trinity Compressor Station: Scheduled Unit Maintenannce, Proj-58051 (4/7/2025 - 4/12/2025)

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.


 

 

 

 

 

 

 

-Restrictions to Primary In-Path transportation services may be necessary.

 

 

SNG - Outage Impact Report

 

 

-Restrictions to In-Path transportation services may be necessary.

 

 

May 2025 (updated 02/06/25)

 

 

-Restrictions to Interruptible and Out of Path transportation services may be necessary.

 

 

 

 

 

-No anticipated impact to transportation services.

 

Station / Seg

 

Est Nominal Design Capacity (Thousand Dth)

Week 1 (4/28 - 5/4)

Week 2 (5/5 - 5/11)

Week 3 (5/12 - 5/18)

Week 4 (5/19 - 5/25)

Week 5 (5/26 - 6/1)

 

Primary Outage(s)

Est. Operational Capacity (Operational Impact) - Thousand Dth

 

Onward (segment 30)

 

 

203

 

 

203

 

 

203

 

 

203

 

 

203

 

 

203

 

 

Louisville East (segment 50)

 

 

520

 

275

(245)

 

 

520

 

 

520

 

 

520

 

 

520

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (4/21/2025 - 5/2/2025)

 

Duncanville Lateral (segment 90)

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

36

 

 

Dearmanville (segment 150)

 

 

346

 

 

346

 

 

346

 

 

346

 

 

346

 

 

346

 

 

White Castle (segment 340)

 

 

772

 

 

772

 

 

772

 

 

772

 

 

772

 

 

772

 

 

Sesh (segment 380)

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

500

 

 

Gwinville (segment 400)

 

 

234

 

 

234

 

150

(84)

 

150

(84)

 

150

(84)

 

 

234

2nd North Main Line east of Pickens: Pipeline Maintenance(remediation), Proj-SNG-19047 (5/5/2025 - 5/21/2025)

 

Enterprise (segment 430)

 

 

2,306

 

 

2,306

 

 

2,306

 

 

2,306

 

 

2,306

 

 

2,306

 

 

Ellerslie (segment 490)

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

1,547

 

 

South Atlanta (segment 510)

 

 

522

 

 

522

 

 

522

 

 

522

 

 

522

 

 

522

 

 

Thomaston East (segment 530)

 

 

849

 

 

849

 

 

849

 

 

849

 

 

849

 

 

849

 

 

South Georgia (segment 650)

 

 

127

 

 

127

 

 

127

 

 

127

 

 

127

 

 

127

 

This document is updated on a weekly basis and outage schedules/impacts are subject to change as the week progresses.

Dates posted on DART should be deemed correct in the event of conflicts between DART posted dates and dates on this report.

The impacts sheet are based on steady-state hydraulic models assuming recent operating flows, conditions, and various unit outages.