Texas Eastern Transmission Notice 151409

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
08/18/2024
09:00:00 AM
08/19/2024
09:00:00 AM
151409
Initiate
Capacity Constraint
08/17/2024
02:45:31 PM


No response required


TE Pipeline Conditions for 8/18/2024


Notice Text:

For Gas Day August 18, 2024, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:











Restricted Locations Scheduled and Sealed Priority % Restricted Notes
TABS IT 4B 4A 3 2 1
North of Berne                  
Meter 75919 Deliveries
N/A 100% 100% 100% 21%


 
Rec from AGT & Del West of Lambertville
100% 100% 100%




 
ISS-1 Injections(1)
N/A 100%





 
FSS, SS-1 and SS Injections(1)
N/A 100%





 
TE/AGT Lease Yes






To Lease Capacity
Nexus/TE Leased Meters Yes






To Lease Capacity
30" South of Berne                     
Berne South
N/A 100% 100%




 
Danville South
N/A 100% 100%




 
Tompkinsville South
N/A 100% 100%




 
Barton South Yes







 
Meter 73730 Receipts
N/A 100% 100% 100%



 
24"                     
Sarahsville South
N/A 100% 100%




Planned Outage
Lebanon South Yes







 
Five Points South
N/A 100% 100% 100%



Planned Outage
Access Area                  
Union Church
N/A 100% 100%




 
Receipt Meters 72972, 73073, 72831, 72319
N/A 100%





Planned Outage
New Roads South Yes







 
Speaks South
N/A 100% 97%




 
Angleton West
N/A 100% 94%




 
                     
TABS Pool Restrictions - Tolerances ETX STX WLA ELA M1-24" M1-30" M2-24" M2-30" M3
TABS Pool - Length 1% or 500 1% or 500 1% or 500 1% or 500 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000
TABS Pool - Short 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000











No-Notice Restrictions




















OFO / Imbalance Notice









OFO No DS - M2-24, M2-30 and M3 issued 8/17/2024.  2,000 Dth / 5% Tolerance

Action Alert ---








Customer Specific OFO No DS - Issued August 1, 2024. 2,000 Dth or 1% Tolerance 


Imbalance Warnings Stay Balanced - Access Area, M1-24 and M1-30












FERC Order 698 M2-24, M2-30 and M3

















Systemwide Notes:


(1) Due to higher than desired line pack levels across Texas Eastern Transmission's (TE) system, all ISS-1 injections will be restricted.  Additionally, excess injections on all FSS, SS-1 and SS contracts will be restricted.  Furthermore, TT16 and TT17, no-notice balancing and no-notice pre-injection will not be allowed.











If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.

TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.











Please contact your Operations Account Representative should you have any questions.


TSP: 
TSP Name: 
Critical Notice Description: 
Notice Effective Date: 
Notice Effective Time: 
Notice End Date: 
Notice End Time: 
Notice Identifier: 
Notice Status Description: 
Notice Type: 
Posting Date: 
Posting Time: 
Prior Notice Identifier: 
Required Response
  Indicator Description: 
Response Date: 
Response Time: 
Subject: 
007932908
Texas Eastern Transmission, LP
Critical notice
08/18/2024
09:00:00 AM
08/19/2024
09:00:00 AM
151409
Initiate
Capacity Constraint
08/17/2024
02:45:31 PM


No response required


TE Pipeline Conditions for 8/18/2024


Notice Text:

For Gas Day August 18, 2024, Texas Eastern (TE) has approved and scheduled nominations at each pipeline segment and meter station up to TE's operational capacity. The following locations have been restricted due to requested nominations exceeding TE's operational capacity:











Restricted Locations Scheduled and Sealed Priority % Restricted Notes
TABS IT 4B 4A 3 2 1
North of Berne                  
Meter 75919 Deliveries
N/A 100% 100% 100% 21%


 
Rec from AGT & Del West of Lambertville
100% 100% 100%




 
ISS-1 Injections(1)
N/A 100%





 
FSS, SS-1 and SS Injections(1)
N/A 100%





 
TE/AGT Lease Yes






To Lease Capacity
Nexus/TE Leased Meters Yes






To Lease Capacity
30" South of Berne                     
Berne South
N/A 100% 100%




 
Danville South
N/A 100% 100%




 
Tompkinsville South
N/A 100% 100%




 
Barton South Yes







 
Meter 73730 Receipts
N/A 100% 100% 100%



 
24"                     
Sarahsville South
N/A 100% 100%




Planned Outage
Lebanon South Yes







 
Five Points South
N/A 100% 100% 100%



Planned Outage
Access Area                  
Union Church
N/A 100% 100%




 
Receipt Meters 72972, 73073, 72831, 72319
N/A 100%





Planned Outage
New Roads South Yes







 
Speaks South
N/A 100% 97%




 
Angleton West
N/A 100% 94%




 
                     
TABS Pool Restrictions - Tolerances ETX STX WLA ELA M1-24" M1-30" M2-24" M2-30" M3
TABS Pool - Length 1% or 500 1% or 500 1% or 500 1% or 500 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000
TABS Pool - Short 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000 2% or 1,000











No-Notice Restrictions




















OFO / Imbalance Notice









OFO No DS - M2-24, M2-30 and M3 issued 8/17/2024.  2,000 Dth / 5% Tolerance

Action Alert ---








Customer Specific OFO No DS - Issued August 1, 2024. 2,000 Dth or 1% Tolerance 


Imbalance Warnings Stay Balanced - Access Area, M1-24 and M1-30












FERC Order 698 M2-24, M2-30 and M3

















Systemwide Notes:


(1) Due to higher than desired line pack levels across Texas Eastern Transmission's (TE) system, all ISS-1 injections will be restricted.  Additionally, excess injections on all FSS, SS-1 and SS contracts will be restricted.  Furthermore, TT16 and TT17, no-notice balancing and no-notice pre-injection will not be allowed.











If customers/point operators do not manage hourly takes from the system, it will lead to delivery pressures being lower than desired for this area. As a result, TE may be required to impose further restrictions or courses of action in order to maintain the operational integrity of the system, including but not limited to, implementation of flow control at specific delivery meter locations.

TE may be required to issue hourly OFO's to impose further restrictions in order to maintain the operational integrity of the system.











Please contact your Operations Account Representative should you have any questions.