Texas Eastern Transmission Critical Notices
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Type | Posted | Effective | End | Identifier | Status | Subject | Response |
---|---|---|---|---|---|---|---|
Other | 04/03/25 | 04/30/25 | 05/30/25 | 160825 | Movement of STX and ETX TABS Pools on 04/30/2025 | ||
Customer Services Update | 04/03/25 | 04/25/25 | 04/28/25 | 160820 | LINK System Maintenance the weekend of April 25, 2025 | ||
Capacity Constraint | 04/02/25 | 04/03/25 | 04/04/25 | 160787 | TE Pipeline Conditions for 4/3/2025 | ||
Capacity Constraint | 04/01/25 | 04/02/25 | 04/03/25 | 160736 | TE Pipeline Conditions for 4/2/2025 | ||
Capacity Constraint | 03/31/25 | 04/01/25 | 04/02/25 | 160705 | TE Pipeline Conditions for 4/1/2025 | ||
Capacity Constraint | 03/30/25 | 03/31/25 | 04/01/25 | 160653 | TE Pipeline Conditions for 3/31/2025 | ||
Capacity Constraint | 03/29/25 | 03/30/25 | 03/31/25 | 160616 | TE Pipeline Conditions for 3/30/2025 | ||
Capacity Constraint | 03/28/25 | 03/29/25 | 03/30/25 | 160582 | TE Pipeline Conditions for 3/29/2025 | ||
Capacity Constraint | 03/27/25 | 03/28/25 | 03/29/25 | 160539 | TE Pipeline Conditions for 3/28/2025 | ||
Operational Flow Order | 03/27/25 | 03/29/25 | 04/01/25 | 160511 | TE Operational Flow Order -- UPDATE EFF 3/29 | ||
Capacity Constraint | 03/27/25 | 03/27/25 | 06/25/25 | 160517 | Huntsville to Lufkin Line 11 VS1 Isolation -- COMPLETE | ||
Capacity Constraint | 03/26/25 | 03/27/25 | 03/28/25 | 160481 | TE Pipeline Conditions for 3/27/2025 | ||
Capacity Constraint | 03/25/25 | 03/26/25 | 03/27/25 | 160462 | TE Pipeline Conditions for 3/26/2025 | ||
Capacity Constraint | 03/25/25 | 03/25/25 | 03/26/25 | 160423 | TE Pipeline Conditions for 3/25/2025 -- INTRADAY | ||
Capacity Constraint | 03/24/25 | 03/25/25 | 03/26/25 | 160415 | TE Pipeline Conditions for 3/25/2025 | ||
Operational Flow Order | 03/24/25 | 03/24/25 | 06/22/25 | 160382 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 03/23/25 | 03/24/25 | 03/25/25 | 160378 | TE Pipeline Conditions for 3/24/2025 | ||
Capacity Constraint | 03/22/25 | 03/23/25 | 03/24/25 | 160347 | TE Pipeline Conditions for 3/23/2025 | ||
Capacity Constraint | 03/21/25 | 03/22/25 | 03/23/25 | 160315 | TE Pipeline Conditions for 3/22/2025 | ||
Operational Flow Order | 03/20/25 | 03/22/25 | 03/25/25 | 160226 | TE Operational Flow Order -- EFF 3/22 | ||
Capacity Constraint | 03/20/25 | 03/21/25 | 03/22/25 | 160244 | TE Pipeline Conditions for 3/21/2025 | ||
Capacity Constraint | 03/19/25 | 03/20/25 | 03/21/25 | 160222 | TE Pipeline Conditions for 3/20/2025 | ||
Capacity Constraint | 03/18/25 | 03/19/25 | 03/20/25 | 160169 | TE Pipeline Conditions for 3/19/2025 | ||
Capacity Constraint | 03/17/25 | 03/18/25 | 03/19/25 | 160148 | TE Pipeline Conditions for 3/18/2025 | ||
Capacity Constraint | 03/16/25 | 03/17/25 | 03/18/25 | 160108 | TE Pipeline Conditions for 3/17/2025 | ||
Capacity Constraint | 03/15/25 | 03/16/25 | 03/17/25 | 160076 | TE Pipeline Conditions for 3/16/2025 | ||
Capacity Constraint | 03/14/25 | 03/15/25 | 03/16/25 | 160041 | TE Pipeline Conditions for 3/15/2025 | ||
Capacity Constraint | 03/13/25 | 03/14/25 | 03/15/25 | 159979 | TE Pipeline Conditions for 3/14/2025 | ||
Operational Flow Order | 03/13/25 | 03/15/25 | 03/17/25 | 159954 | TE Operational Flow Order -- EFF 3/15 | ||
Capacity Constraint | 03/13/25 | 03/14/25 | 06/11/25 | 159953 | TE Operational Advisory (Access Area and Market Area Tab Pool Tolerance Adjustment) | ||
Capacity Constraint | 03/12/25 | 03/13/25 | 06/10/25 | 159952 | Thomaston to Transition Line 21 Valve Section 4 Isolation -- COMPLETE 9AM 3/13 | ||
Capacity Constraint | 03/12/25 | 03/13/25 | 03/14/25 | 159937 | TE Pipeline Conditions for 3/13/2025 | ||
Capacity Constraint | 03/11/25 | 03/11/25 | 03/12/25 | 159865 | TE Pipeline Conditions for 3/11/2025 -- INTRADAY | ||
Capacity Constraint | 03/11/25 | 03/12/25 | 03/13/25 | 159863 | TE Pipeline Conditions for 3/12/2025 | ||
Capacity Constraint | 03/10/25 | 03/11/25 | 03/12/25 | 159798 | TE Pipeline Conditions for 3/11/2025 | ||
Operational Flow Order | 03/10/25 | 03/10/25 | 06/08/25 | 159768 | TE Operational Flow Order -- LIFTED EFF 3/10 | ||
Capacity Constraint | 03/09/25 | 03/10/25 | 03/11/25 | 159766 | TE Pipeline Conditions for 3/10/2025 | ||
Capacity Constraint | 03/08/25 | 03/09/25 | 03/10/25 | 159726 | TE Pipeline Conditions for 3/9/2025 | ||
Capacity Constraint | 03/07/25 | 03/08/25 | 03/09/25 | 159707 | TE Pipeline Conditions for 3/8/2025 | ||
Capacity Constraint | 03/06/25 | 03/07/25 | 03/08/25 | 159663 | TE Pipeline Conditions for 3/7/2025 | ||
Capacity Constraint | 03/05/25 | 03/06/25 | 03/07/25 | 159625 | TE Pipeline Conditions for 3/6/2025 | ||
Operational Flow Order | 03/05/25 | 03/07/25 | 06/03/25 | 159598 | TE Operational Flow Order -- EFF 3/7 | ||
Capacity Constraint | 03/04/25 | 03/05/25 | 03/06/25 | 159579 | TE Pipeline Conditions for 3/5/2025 | ||
Capacity Constraint | 03/03/25 | 03/04/25 | 03/05/25 | 159543 | TE Pipeline Conditions for 3/4/2025 | ||
Operational Flow Order | 03/03/25 | 03/03/25 | 06/01/25 | 159516 | TE Operational Flow Order -- LIFTED EFF 3/4 | ||
Capacity Constraint | 03/02/25 | 03/03/25 | 03/04/25 | 159500 | TE Pipeline Conditions for 3/3/2025 | ||
Capacity Constraint | 03/01/25 | 03/02/25 | 03/03/25 | 159470 | TE Pipeline Conditions for 3/2/2025 | ||
Capacity Constraint | 02/28/25 | 03/01/25 | 03/02/25 | 159451 | TE Pipeline Conditions for 3/1/2025 | ||
Capacity Constraint | 02/27/25 | 02/28/25 | 03/01/25 | 159402 | TE Pipeline Conditions for 2/28/2025 | ||
Operational Flow Order | 02/27/25 | 03/01/25 | 05/28/25 | 159356 | TE Operational Flow Order -- EFF 3/1 & 3/2 | ||
Capacity Constraint | 02/26/25 | 02/27/25 | 02/28/25 | 159352 | TE Pipeline Conditions for 2/27/2025 | ||
Capacity Constraint | 02/25/25 | 02/26/25 | 02/27/25 | 159314 | TE Pipeline Conditions for 2/26/2025 | ||
Capacity Constraint | 02/24/25 | 02/25/25 | 02/26/25 | 159281 | TE Pipeline Conditions for 2/25/2025 | ||
Operational Flow Order | 02/24/25 | 02/25/25 | 05/25/25 | 159242 | TE Operational Flow Order -- LIFTED EFF 2/25 | ||
Capacity Constraint | 02/23/25 | 02/24/25 | 02/25/25 | 159238 | TE Pipeline Conditions for 2/24/2025 | ||
Capacity Constraint | 02/22/25 | 02/23/25 | 02/24/25 | 159201 | TE Pipeline Conditions for 2/23/2025 | ||
Capacity Constraint | 02/21/25 | 02/22/25 | 02/23/25 | 159161 | TE Pipeline Conditions for 2/22/2025 | ||
Capacity Constraint | 02/21/25 | 02/21/25 | 05/22/25 | 159132 | TE Meter Underperformance | ||
Capacity Constraint | 02/21/25 | 02/21/25 | 05/22/25 | 159119 | TE Meter Underperformace -- UPDATE | ||
Capacity Constraint | 02/20/25 | 02/20/25 | 05/21/25 | 159118 | TE Meter Underperformance -- UPDATE | ||
Capacity Constraint | 02/20/25 | 02/21/25 | 02/22/25 | 159109 | TE Pipeline Conditions for 2/21/2025 | ||
Capacity Constraint | 02/20/25 | 02/20/25 | 05/21/25 | 159090 | TE Meter Underperformance -- UPDATE | ||
Operational Flow Order | 02/20/25 | 02/22/25 | 05/21/25 | 159073 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 02/20/25 | 02/20/25 | 05/21/25 | 159082 | TE Meter Underperformance -- UPDATE | ||
Capacity Constraint | 02/20/25 | 02/20/25 | 05/21/25 | 159081 | TE Meter Underperformance | ||
Capacity Constraint | 02/19/25 | 02/20/25 | 02/21/25 | 159063 | TE Pipeline Conditions for 2/20/2025 | ||
Capacity Constraint | 02/18/25 | 02/19/25 | 02/20/25 | 159022 | TE Pipeline Conditions for 2/19/2025 | ||
Capacity Constraint | 02/17/25 | 02/18/25 | 02/19/25 | 158980 | TE Pipeline Conditions for 2/18/2025 | ||
Operational Flow Order | 02/17/25 | 02/19/25 | 05/18/25 | 158899 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 02/16/25 | 02/17/25 | 02/18/25 | 158898 | TE Pipeline Conditions for 2/17/2025 | ||
Capacity Constraint | 02/15/25 | 02/15/25 | 02/16/25 | 158865 | TE Pipeline Conditions for 2/15/2025 -- INTRADAY | ||
Capacity Constraint | 02/15/25 | 02/16/25 | 02/17/25 | 158864 | TE Pipeline Conditions for 2/16/2025 | ||
Capacity Constraint | 02/14/25 | 02/15/25 | 02/16/25 | 158830 | TE Pipeline Conditions for 2/15/2025 | ||
Capacity Constraint | 02/13/25 | 02/14/25 | 02/15/25 | 158786 | TE Pipeline Conditions for 2/14/2025 | ||
Operational Flow Order | 02/13/25 | 02/16/25 | 05/14/25 | 158750 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 02/13/25 | 02/13/25 | 05/14/25 | 158753 | Hempstead to Huntsville Line 11 VS2 Isolation -- COMPLETE | ||
Capacity Constraint | 02/12/25 | 02/13/25 | 02/14/25 | 158737 | TE Pipeline Conditions for 2/13/2025 (Correction) | ||
Capacity Constraint | 02/12/25 | 02/13/25 | 02/14/25 | 158733 | TE Pipeline Conditions for 2/14/2025 | ||
Capacity Constraint | 02/11/25 | 02/12/25 | 02/13/25 | 158703 | TE Pipeline Conditions for 2/12/2025 | ||
Operational Flow Order | 02/11/25 | 02/13/25 | 05/12/25 | 158672 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 02/10/25 | 02/11/25 | 02/12/25 | 158668 | TE Pipeline Conditions for 2/11/2025 | ||
Operational Flow Order | 02/10/25 | 02/10/25 | 05/11/25 | 158623 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 02/09/25 | 02/10/25 | 02/11/25 | 158617 | TE Pipeline Conditions for 2/10/2025 | ||
Capacity Constraint | 02/08/25 | 02/09/25 | 02/10/25 | 158578 | TE Pipeline Conditions for 2/9/2025 | ||
Capacity Constraint | 02/07/25 | 02/08/25 | 02/09/25 | 158550 | TE Pipeline Conditions for 2/8/2025 | ||
Capacity Constraint | 02/06/25 | 02/07/25 | 02/08/25 | 158523 | TE Pipeline Conditions for 2/7/2025 | ||
Operational Flow Order | 02/06/25 | 02/09/25 | 05/07/25 | 158495 | TE Operational Flow Order -- EFF 2/9 | ||
Capacity Constraint | 02/05/25 | 02/06/25 | 02/07/25 | 158482 | TE Pipeline Conditions for 2/6/2025 | ||
Capacity Constraint | 02/04/25 | 02/05/25 | 02/06/25 | 158449 | TE Pipeline Conditions for 2/5/2025 | ||
Operational Flow Order | 02/04/25 | 02/06/25 | 05/05/25 | 158418 | TE Operational Flow Order -- LIFTED EFF 2/6 | ||
Capacity Constraint | 02/03/25 | 02/04/25 | 02/05/25 | 158410 | TE Pipeline Conditions for 2/4/2025 | ||
Capacity Constraint | 02/02/25 | 02/03/25 | 02/04/25 | 158366 | TE Pipeline Conditions for 2/3/2025 | ||
Capacity Constraint | 02/01/25 | 02/02/25 | 02/03/25 | 158339 | TE Pipeline Conditions for 2/2/2025 | ||
Capacity Constraint | 01/31/25 | 02/01/25 | 02/02/25 | 158313 | TE Pipeline Conditions for 2/1/2025 | ||
Capacity Constraint | 01/30/25 | 01/31/25 | 02/01/25 | 158252 | TE Pipeline Conditions for 1/31/2025 | ||
Capacity Constraint | 01/29/25 | 01/30/25 | 01/31/25 | 158224 | TE Pipeline Conditions for 1/30/2025 | ||
Operational Flow Order | 01/29/25 | 01/29/25 | 04/29/25 | 158187 | TE Operational Flow Order -- UPDATE EFF 1/29 | ||
Capacity Constraint | 01/28/25 | 01/29/25 | 01/30/25 | 158170 | TE Pipeline Conditions for 1/29/2025 | ||
Capacity Constraint | 01/27/25 | 01/28/25 | 01/29/25 | 158152 | TE Pipeline Conditions for 1/28/2025 | ||
Operational Flow Order | 01/27/25 | 01/28/25 | 04/27/25 | 158112 | TE Operational Flow Order -- UPDATE EFF 1/28 | ||
Capacity Constraint | 01/26/25 | 01/27/25 | 01/28/25 | 158108 | TE Pipeline Conditions for 1/27/2025 | ||
Capacity Constraint | 01/25/25 | 01/26/25 | 01/27/25 | 158078 | TE Pipeline Conditions for 1/26/2025 | ||
Capacity Constraint | 01/24/25 | 01/25/25 | 01/26/25 | 158051 | TE Pipeline Conditions for 1/25/2025 | ||
Capacity Constraint | 01/24/25 | 01/24/25 | 04/24/25 | 158021 | TE LaRose Compressor Station Unplanned Outage - COMPLETE | ||
Capacity Constraint | 01/23/25 | 01/24/25 | 01/25/25 | 158005 | TE Pipeline Conditions for 1/24/2025 -- UPDATE | ||
Capacity Constraint | 01/23/25 | 01/24/25 | 01/25/25 | 158001 | TE Pipeline Conditions for 1/24/2025 | ||
Operational Flow Order | 01/23/25 | 01/25/25 | 04/23/25 | 157965 | TE Operational Flow Order -- UPDATE EFF 1/25 | ||
Capacity Constraint | 01/22/25 | 01/22/25 | 04/22/25 | 157963 | TE Meter Underperformance | ||
Capacity Constraint | 01/22/25 | 01/23/25 | 01/24/25 | 157959 | TE Pipeline Conditions for 1/23/2025 | ||
Capacity Constraint | 01/22/25 | 01/22/25 | 04/22/25 | 157936 | TE LaRose Compressor Station Unplanned Outage | ||
Capacity Constraint | 01/21/25 | 01/22/25 | 01/23/25 | 157921 | TE Pipeline Conditions for 1/22/2025 | ||
Capacity Constraint | 01/21/25 | 01/21/25 | 04/21/25 | 157920 | TE Meter Underperformance | ||
Capacity Constraint | 01/20/25 | 01/21/25 | 01/22/25 | 157886 | TE Pipeline Conditions for 1/21/2025 | ||
Capacity Constraint | 01/19/25 | 01/20/25 | 01/21/25 | 157855 | TE Pipeline Conditions for 1/20/2025 | ||
Capacity Constraint | 01/18/25 | 01/19/25 | 01/20/25 | 157822 | TE Pipeline Conditions for 1/19/2025 | ||
Capacity Constraint | 01/17/25 | 01/18/25 | 01/19/25 | 157790 | TE Pipeline Conditions for 1/18/2025 -- UPDATE | ||
Capacity Constraint | 01/17/25 | 01/18/25 | 01/19/25 | 157785 | TE Pipeline Conditions for 1/18/2025 | ||
Capacity Constraint | 01/16/25 | 01/17/25 | 01/18/25 | 157739 | TE Pipeline Conditions for 1/17/2025 | ||
Operational Flow Order | 01/16/25 | 01/18/25 | 04/16/25 | 157704 | TE Operational Flow Order -- UPDATE EFF 1/18 | ||
Capacity Constraint | 01/15/25 | 01/16/25 | 01/17/25 | 157694 | TE Pipeline Conditions for 1/16/2025 | ||
Capacity Constraint | 01/14/25 | 01/15/25 | 01/16/25 | 157654 | TE Pipeline Conditions for 1/15/2025 | ||
Capacity Constraint | 01/14/25 | 01/14/25 | 01/15/25 | 157629 | TE Pipeline Conditions for 1/14/2025 -- INTRADAY | ||
Capacity Constraint | 01/14/25 | 01/17/25 | 04/14/25 | 157628 | TE Access Area Operational Notice | ||
Capacity Constraint | 01/13/25 | 01/14/25 | 01/15/25 | 157593 | TE Pipeline Conditions for 1/14/2025 | ||
Capacity Constraint | 01/12/25 | 01/13/25 | 01/14/25 | 157558 | TE Pipeline Conditions for 1/13/2025 | ||
Capacity Constraint | 01/11/25 | 01/12/25 | 01/13/25 | 157527 | TE Pipeline Conditions for 1/12/2025 | ||
Capacity Constraint | 01/10/25 | 01/11/25 | 01/12/25 | 157488 | TE Pipeline Conditions for 1/11/2025 | ||
Capacity Constraint | 01/09/25 | 01/10/25 | 01/11/25 | 157434 | TE Pipeline Conditions for 1/10/2025 | ||
Operational Flow Order | 01/09/25 | 01/11/25 | 04/09/25 | 157394 | TE Operational Flow Order -- UPDATE EFF 1/11 | ||
Capacity Constraint | 01/08/25 | 01/09/25 | 01/10/25 | 157389 | TE Pipeline Conditions for 1/9/2025 | ||
Capacity Constraint | 01/07/25 | 01/08/25 | 01/09/25 | 157353 | TE Pipeline Conditions for 1/8/2025 | ||
Capacity Constraint | 01/06/25 | 01/07/25 | 01/08/25 | 157317 | TE Pipeline Conditions for 1/7/2025 | ||
Capacity Constraint | 01/05/25 | 01/06/25 | 01/07/25 | 157276 | TE Pipeline Conditions for 1/6/2025 | ||
Capacity Constraint | 01/04/25 | 01/05/25 | 01/06/25 | 157231 | TE Pipeline Conditions for 1/5/2025 | ||
Capacity Constraint | 01/03/25 | 01/04/25 | 01/05/25 | 157217 | TE Pipeline Conditions for 1/4/2025 | ||
Operational Flow Order | 01/03/25 | 01/07/25 | 04/03/25 | 157193 | TE Operational Flow Order -- UPDATE | ||
Capacity Constraint | 11/12/24 | 11/12/24 | 04/16/25 | 155145 | TE 2024/2025 Storage Withdrawal Plan - With Attachment | ||
Capacity Constraint | 11/12/24 | 11/12/24 | 04/16/25 | 155131 | TE 2024/2025 Storage Withdrawal Plan |