Transco Notice 15135470

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC
Critical: Y
Notice Eff Date: 11/18/2024
Notice Eff Time: 11:28:19 CST
Notice End Date:
Notice End Time:
Notice ID: 15135470
Notice Stat Desc: Supersede
Notice Type Desc: Maint
Post Date: 11/18/2024
Post Time: 11:28:19 CST
Prior Notice: 15047482
Reqrd Rsp Desc: Immediate response required of an operational nature may be required of impacted shippers
Rsp Date:
Rsp Time:
TSP: 007933021
TSP Name: TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC

Notice Text:

Subject: Update-Job 41056 Sta 70 MLD 2024 Planned Outage and Maintenance Summary

Transco will be performing necessary pipeline inspection maintenance associated with Job #41056 on its 2024 Planned Outage and Maintenance Summary. This assessment is associated with Transco’s Hard Spot Remediation Program as it works to identify and eliminate hard spot integrity threats throughout its system. This maintenance activity may impact the availability of transportation services moving south to north through Compressor Station 70. The current schedule for this maintenance is December 2, 2024 to December 5, 2024 December 9, 2024 to December 12,2024

The specific dates that will be impacted are subject to change, but the current schedule is outlined below.  

Gauge/Cleaner Combo Tool – 12/2-12/3 12/9-12/10

Hard Spot Assessment Tool – 12/4-12/5 12/11-12/12

During this period of planned maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving south to north through the location may not be available. 

Operating Conditions resulting from this work will require Transco to manage all transportation services moving south to north through the location listed below. The total quantity available will be contingent on system conditions during the Maintenance Period. Transactions moving north to south through this location will not be impacted.  

The receipt-based Throughput Section Boundary (TSB) at mainline milepost 662 (Station 70) will be used to manage the available capacity during this planned work. An updated Market and Production Area constraint notice will include the TSB location and the available quantity of all transportation services during the Maintenance Period.  

TSB Name - Location  

Location ID  

Flow Direction  

Design Capacity (Mdt/d)  

Total Qty Available (Mdt/d)  

% Cuts Potential Shipper Impact (Based on Historical Utilization)*  

Station 70 MP 662  

9011500  

South to North  

3,466 

2,350 

0-5%  

 

*% Cuts is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated firm volumes and changes in the amount of available capacity.   

  

If you have any questions, please contact your Transportation Services Representative.