Transco Pipeline Notice 15579486
Source LinkAll information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.
Critical: | Y |
Notice Eff Date: | 04/18/2025 |
Notice Eff Time: | 11:35:07 CDT |
Notice End Date: | |
Notice End Time: | |
Notice ID: | 15579486 |
Notice Stat Desc: | Supersede |
Notice Type Desc: | Maint |
Post Date: | 04/18/2025 |
Post Time: | 11:35:07 CDT |
Prior Notice: | 15443862 |
Reqrd Rsp Desc: | Immediate response required of an operational nature may be required of impacted shippers |
Rsp Date: | |
Rsp Time: | |
TSP: | 007933021 |
TSP Name: | TRANSCONTINENTAL GAS PIPE LINE COMPANY, LLC |
Notice Text:
Subject: UPDATE - Job 933938 Station 110 2025 Planned Outage and Maintenance Summary
Transco will be performing necessary maintenance at Compressor Station 110 associated with Transco’s Hard Spot Remediation Program as it works to identify and eliminate hard spot integrity threats throughout its system. This activity requires a compressor station outage that will impact the availability of primary-firm transportation services moving south to north through Compressor Station 110. The current schedule is April 22, 2025 through April 30, 2025.
Operating Conditions resulting from this work will require Transco to manage transportation services moving south to north through Station 110. The total quantity available will be contingent on system conditions during the maintenance period but is anticipated to be limited to the quantity indicated below. Transactions moving north to south through this location will not be impacted.
During this period of maintenance, non-secondary reverse path (NSRP), secondary FT, and interruptible (IT) transactions moving south to north through the location may not be available.
The receipt-based Throughput Section Boundary (TSB) at Compressor Station 110 MP 969.5 will be used to manage capacity availability during this planned work. An updated Market and Production Area constraint notice will include the location and the available quantity during the indicated period.
TSB Name - Location |
Location ID |
Flow Direction |
Design Capacity (Mdt/d) |
Total Qty Available (Mdt/d) |
% Cuts (Primary)– Potential Shipper Impact (Based on Historical Utilization) * |
Station 110 MP 969.5 |
9012504 |
South to North |
4,788 |
3,633 |
0-10% |
*% Cuts (Primary) is an estimate of the impact to shippers based on historical utilization and anticipated volumes during the time of constraint. These amounts are subject to change based on actual nominated volumes and changes in the amount of available capacity.
If you have any questions, please contact your Transportation Services Representative.