System Linepack at 07:05 CCT: |
3,363 |
MMCF |
|
Change Since Start of Gas Day February 19, 2024: |
41 |
MMCF |
|
Target Linepack for Gas Day February 19, 2024: |
3,200 |
MMCF |
|
|
System Status at Report Time: |
| High Linepack | High Linepack |
|
|
System-Wide OFO in Effect: | No | Pack Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 8% | Non-Suppliers: | Minimum 500 GJ - Maximum of 2% up to 5,000 GJ | Marketers: | Mandatory zero balance | Draft Tolerances: | Suppliers: | Minimum 500 GJ - Maximum of 8% | Non-Suppliers: | Minimum 500 GJ - Maximum of 2% up to 5,000 GJ | Marketers: | Mandatory zero balance | |
|
Physical Operations Notes: |
Linepack is expected to increase today. |
|
|
Operational Status Details: |
|
Report for Gas Day |
|
Forecast for Gas Day |
|
February 19, 2024 |
|
February 20, 2024 |
Total System: |
Receipts
|
(MMCF) |
2,266 |
|
2,396 |
Deliveries
|
(MMCF) |
2,194 |
|
2,259 |
|
Gordondale Alliance: |
Estimated Deliveries
|
(MMCF) |
55 |
|
51 |
|
Gordondale TCPL: |
Estimated Deliveries
|
(MMCF) |
104 |
|
105 |
Estimated Receipts
|
(MMCF) |
0 |
|
3 |
|
Sunset TCPL: |
Estimated Deliveries
|
(MMCF) |
100 |
|
99 |
|
Huntingdon: |
Estimated Flow Total
|
(MMCF) |
1,789 |
|
1,821 |
Estimated Flow Export
|
(MMCF) |
1,350 |
|
1,305 |
Authorized Business
|
(MMCF) |
1,827 |
|
1,868 |
Pressure
|
(PSI) |
630 |
|
630 |
|
Pipeline Status: |
|
Mainline North |
|
|
Mainline Central |
|
|
Mainline South |
|
|
Commercial Notes: |
Shippers must ensure accounts are within tolerance. |
|
Preliminary Imbalances at the end of Gas Day February 19, 2024: |
Total Shipper Imbalances(GJ) |
-9,905 |
|
Total OBA Imbalances(GJ) |
237,015 |
|
System Gas on Pipe(GJ) |
-13,208 |
|
|
A negative imbalance is owed to the Pipeline. |
|
The above information is a forecast based on variable factors and as a result can