Westcoast Energy Critical Notices

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

Type Posted Effective End Identifier Status Subject Response
Curtailment - Pipeline 11/20/24 11/20/24 11/21/24 58910 Huntingdon/4B South Capacity for November 20, 2024 ID1 Revised
Curtailment - Pipeline 11/20/24 11/20/24 11/21/24 58909 Huntingdon/4B South Capacity for November 21, 2024
Curtailment - Pipeline 11/19/24 11/19/24 11/20/24 58908 Huntingdon/4B South Capacity for November 19, 2024 ID1 Revised
Curtailment - Pipeline 11/19/24 11/19/24 11/20/24 58896 Huntingdon/4B South Capacity for November 20, 2024
Curtailment - Pipeline 11/16/24 11/16/24 11/17/24 58895 Huntingdon/4B South Capacity for November 16, 2024 ID1 Revised
Curtailment - Pipeline 11/15/24 11/15/24 11/16/24 58888 Huntingdon/4B South Capacity for November 15, 2024 ID1 Revised
Curtailment - Pipeline 11/15/24 11/15/24 11/18/24 58887 Huntingdon/4B South Capacity for November 16-18, 2024
Curtailment - Pipeline 11/14/24 11/14/24 11/15/24 58886 Huntingdon/4B South Capacity for November 14, 2024 ID1 Revised
Curtailment - Pipeline 11/14/24 11/14/24 11/15/24 58885 Huntingdon/4B South Capacity for November 15, 2024
Curtailment - Pipeline 11/13/24 11/13/24 11/14/24 58877 Huntingdon/4B South Capacity for November 14, 2024
Curtailment - Pipeline 11/12/24 11/12/24 11/13/24 58875 Huntingdon/4B South Capacity for November 13, 2024
Pipeline Operational Status 11/09/24 11/09/24 11/09/24 58870 Pipeline Operational Status for November 9, 2024 16:00 CCT
Pipeline Operational Status 11/09/24 11/09/24 11/09/24 58869 Pipeline Operational Status for November 9, 2024 08:30 CCT
Pipeline Operational Status 11/08/24 11/08/24 11/08/24 58868 Pipeline Operational Status for November 8, 2024 08:30 CCT
Curtailment - Pipeline 11/08/24 11/08/24 11/12/24 58867 Huntingdon/4B South Capacity for November 9-12, 2024
Curtailment - Pipeline 11/07/24 11/07/24 11/01/25 58866 Westcoast Pipeline 2025 Outage Forecast
Curtailment - Pipeline 11/07/24 11/07/24 11/08/24 58865 Huntingdon/4B South Capacity for November 8, 2024
Curtailment - Pipeline 11/06/24 11/06/24 11/07/24 58863 Huntingdon/4B South Capacity for November 7, 2024 Revised
Curtailment - Pipeline 11/06/24 11/06/24 11/07/24 58862 Huntingdon/4B South Capacity for November 6, 2024 ID1 Revised
Curtailment - Pipeline 11/06/24 11/06/24 11/07/24 58861 Huntingdon/4B South Capacity for November 7, 2024
Curtailment - Pipeline 11/05/24 11/05/24 11/06/24 58853 Huntingdon/4B South Capacity for November 6, 2024
Curtailment - Pipeline 11/04/24 11/04/24 11/05/24 58852 Huntingdon/4B South Capacity for November 5, 2024
Curtailment - Pipeline 11/03/24 11/03/24 11/04/24 58851 Huntingdon/4B South Capacity for November 3, 2024 ID1 & November 4, 2024 Revised
Curtailment - Pipeline 11/01/24 11/01/24 11/04/24 58844 Huntingdon/4B South Capacity for November 2-4, 2024
Curtailment - Pipeline 10/31/24 10/31/24 11/01/24 58843 Huntingdon/4B South Capacity for November 1, 2024
Commercial Operations 10/30/24 10/30/24 11/30/24 58842 Westcoast Energy's Gas Management System Replacement Information Session
Curtailment - Pipeline 10/30/24 10/30/24 10/31/24 58841 Huntingdon/4B South Capacity for October 31, 2024
Curtailment - Pipeline 10/29/24 10/29/24 10/30/24 58836 Huntingdon/4B South Capacity for October 30, 2024
Commercial Operations 10/28/24 10/25/24 11/01/24 58835 November 1st 2024 Entitlements Now Available in CI
Pipeline Operational Status 10/28/24 10/28/24 10/28/24 58834 Pipeline Operational Status for October 28, 2024 08:30 CCT
Curtailment - Pipeline 10/28/24 10/28/24 10/29/24 58832 Huntingdon/4B South Capacity for October 29, 2024
Curtailment - Pipeline 10/27/24 10/27/24 10/27/24 58831 Huntingdon/4B South Capacity for October 27, 2024 ID1 Revised
Curtailment - Pipeline 10/25/24 11/01/24 10/31/25 58826 Westcoast November 2024 Yearly Capacity Update
Curtailment - Pipeline 10/25/24 10/25/24 10/28/24 58824 Huntingdon/4B South Capacity for October 26-28, 2024
Curtailment - Pipeline 10/24/24 10/24/24 10/25/24 58822 Huntingdon/4B South Capacity for October 24, 2024 ID1 - Revised
Curtailment - Pipeline 10/24/24 10/24/24 10/25/24 58821 Huntingdon/4B South Capacity for October 25, 2024
Curtailment - Pipeline 10/23/24 10/23/24 10/24/24 58815 Huntingdon/4B South Capacity for October 24, 2024
Curtailment - Pipeline 10/22/24 10/22/24 10/22/24 58814 Huntingdon/4B South Capacity for October 23, 2024
Curtailment - Pipeline 10/21/24 10/21/24 10/22/24 58813 Station #1 Westbound Capacity for October 22, 2024
Curtailment - Pipeline 10/21/24 10/21/24 10/22/24 58812 Huntingdon/4B South Capacity for October 22, 2024
Press Release, Company News 10/21/24 10/21/24 10/25/24 58811 November 1 Gas Year Preparation & Deadlines
Curtailment - Pipeline 10/19/24 10/18/24 10/19/24 58806 Huntingdon/4B South Capacity for October 19, 2024 ID1 Revised
Curtailment - Pipeline 10/18/24 10/18/24 10/21/24 58802 Huntingdon/4B South Capacity for October 19-21, 2024
Pipeline Operational Status 10/17/24 10/17/24 10/17/24 58801 Pipeline Operational Status for October 17, 2024 16:00 CCT
Curtailment - Pipeline 10/17/24 10/17/24 10/19/24 58793 Huntingdon/4B South Capacity for October 18, 2024
Curtailment - Pipeline 10/16/24 10/16/24 10/17/24 58792 Huntingdon/4B South Capacity for October 17, 2024
Curtailment - Pipeline 10/15/24 10/15/24 10/16/24 58791 Huntingdon/4B South Capacity for October 16, 2024
Curtailment - Pipeline 10/11/24 10/11/24 10/15/24 58781 Huntingdon/4B South Capacity for October 12-15, 2024
Curtailment - Pipeline 10/10/24 10/10/24 10/11/24 58774 Huntingdon/4B South Capacity for October 11, 2024
Curtailment - Pipeline 10/09/24 10/09/24 10/10/24 58773 Huntingdon/4B South Capacity for October 10, 2024
Curtailment - Pipeline 10/08/24 10/08/24 10/14/24 58772 26" Alberta East Capacity for October 9-14, 2024
Curtailment - Pipeline 10/08/24 10/08/24 10/09/24 58771 Huntingdon/4B South Capacity for October 9, 2024
Curtailment - Pipeline 10/07/24 10/07/24 10/08/24 58765 Huntingdon/4B South Capacity for October 7, 2024 ID2 Revised
Press Release, Company News 10/07/24 10/07/24 10/25/24 58764 November 1 Gas Year Preparation & Deadlines
Curtailment - Pipeline 10/07/24 10/07/24 10/08/24 58763 Station #1 Westbound Capacity for October 8, 2024
Curtailment - Pipeline 10/07/24 10/07/24 10/08/24 58762 Huntingdon/4B South Capacity for October 8, 2024
Curtailment - Pipeline 10/05/24 10/05/24 10/05/24 58761 Re-establishment 26" Alberta East Capacity for October 5, 2024
Curtailment - Pipeline 10/04/24 10/04/24 10/06/24 58750 Sunset Creek Interconnect Capacity for October 4-6, 2024
Curtailment - Pipeline 10/04/24 10/04/24 10/07/24 58749 Huntingdon/4B South Capacity for October 5-7, 2024
Curtailment - Pipeline 10/03/24 10/03/24 10/04/24 58747 26" Alberta East Capacity for October 3, 2024 ID2 & October 4, 2024 Revised
Curtailment - Pipeline 10/03/24 10/03/24 10/04/24 58745 Huntingdon/4B South Capacity for October 4, 2024
Pipeline Operational Status 10/02/24 10/02/24 10/02/24 58744 Pipeline Operational Status for October 2, 2024 16:00 CCT
Curtailment - Pipeline 10/02/24 10/02/24 10/03/24 58741 Huntingdon/4B South Capacity for October 3, 2024
Curtailment - Pipeline 10/01/24 10/01/24 10/02/24 58731 Huntingdon/4B South Capacity for October 2, 2024
Pipeline Operational Status 09/27/24 09/27/24 09/27/24 58729 Pipeline Operational Status for September 27, 2024 16:00 CCT
Curtailment - Pipeline 09/27/24 09/27/24 10/03/24 58727 Sunset Creek Interconnect Capacity for September 30 - October 3, 2024
Curtailment - Pipeline 09/27/24 09/27/24 10/04/24 58726 Station #1 Westbound Capacity for October 1-4, 2024
Curtailment - Pipeline 09/27/24 09/27/24 10/01/24 58725 Huntingdon/4B South Capacity for October 1, 2024
Curtailment - Pipeline 09/27/24 09/27/24 09/30/24 58724 Huntingdon/4B South Capacity for September 28-30, 2024
Pipeline Operational Status 09/26/24 09/26/24 09/26/24 58723 Pipeline Operational Status for September 26, 2024 16:00 CCT
Curtailment - Pipeline 09/26/24 09/26/24 09/27/24 58722 Huntingdon/4B South Capacity for September 27, 2024 Revised
Curtailment - Pipeline 09/26/24 09/26/24 09/27/24 58721 Huntingdon/4B South Capacity for September 27, 2024
Curtailment - Pipeline 09/25/24 09/25/24 09/26/24 58719 Huntingdon/4B South Capacity for September 26, 2024
Curtailment - Pipeline 09/24/24 09/24/24 09/25/24 58718 Huntingdon/4B South Capacity for September 25, 2024
Pipeline Operational Status 09/23/24 09/23/24 09/23/24 58716 Pipeline Operational Status for September 23, 2024 16:00 CCT
Curtailment - Pipeline 09/23/24 09/23/24 10/31/24 58715 Operationally Available Capacity for October 2024
Pipeline Operational Status 09/23/24 09/23/24 09/23/24 58712 Pipeline Operational Status for September 23, 2024 08:30 CCT
Curtailment - Pipeline 09/23/24 09/23/24 09/24/24 58711 Huntingdon/4B South Capacity for September 24, 2024
Curtailment - Pipeline 09/20/24 09/20/24 09/23/24 58703 Huntingdon/4B South Capacity for September 21-23, 2024
Curtailment - Pipeline 09/19/24 09/19/24 09/20/24 58701 Huntingdon/4B South Capacity for September 20, 2024
Curtailment - Pipeline 09/18/24 09/18/24 09/19/24 58695 Huntingdon/4B South Capacity for September 19, 2024
Curtailment - Pipeline 09/17/24 09/17/24 09/18/24 58694 Huntingdon/4B South Capacity for September 18, 2024
Curtailment - Pipeline 09/16/24 09/16/24 09/17/24 58693 Huntingdon/4B South Capacity for September 17, 2024
Curtailment - Pipeline 09/13/24 09/13/24 09/16/24 58691 Huntingdon/4B South Capacity for September 14-16, 2024
Curtailment - Pipeline 09/12/24 09/12/24 09/13/24 58688 Huntingdon/4B South Capacity for September 13, 2024
Commercial Operations 09/11/24 09/11/24 10/31/24 58686 Westcoast Energy's Gas Management System Replacement
Curtailment - Pipeline 09/11/24 09/11/24 09/11/24 58685 Huntingdon/4B South Capacity for September 11, 2024 ID1 - Revised
Curtailment - Pipeline 09/11/24 09/11/24 09/12/24 58684 Huntingdon/4B South Capacity for September 12, 2024
Curtailment - Pipeline 09/10/24 09/10/24 09/11/24 58682 Huntingdon/4B South Capacity for September 11, 2024
Curtailment - Pipeline 09/09/24 09/09/24 09/10/24 58673 Huntingdon/4B South Capacity for September 10, 2024
Curtailment - Pipeline 09/06/24 09/06/24 09/09/24 58671 Huntingdon/4B South Capacity for September 7-9, 2024
Curtailment - Pipeline 09/05/24 09/05/24 09/06/24 58665 Huntingdon/4B South Capacity for September 6, 2024
Curtailment - Pipeline 09/04/24 09/04/24 09/05/24 58663 Huntingdon/4B South Capacity for September 5, 2024
Curtailment - Pipeline 09/03/24 09/03/24 09/04/24 58661 Huntingdon/4B South Capacity for September 4, 2024
Curtailment - Pipeline 09/03/24 09/03/24 09/04/24 58662 Huntingdon/4B South Capacity for September 4, 2024
Curtailment - Pipeline 08/30/24 08/30/24 09/03/24 58651 Huntingdon/4B South Capacity for September 1-3, 2024
Pipeline Operational Status 08/29/24 08/29/24 08/29/24 58646 Pipeline Operational Status for August 29, 2024 16:00 CCT
Curtailment - Pipeline 08/29/24 08/29/24 08/31/24 58645 Huntingdon/4B South Capacity for August 30-31, 2024
Pipeline Operational Status 08/29/24 08/29/24 08/29/24 58644 Pipeline Operational Status for August 29, 2024 08:30 CCT
Pipeline Operational Status 08/28/24 08/28/24 08/28/24 58643 Pipeline Operational Status for August 28, 2024 16:00 CCT
Curtailment - Pipeline 08/28/24 08/28/24 08/29/24 58642 Huntingdon/4B South Capacity for August 29, 2024
Curtailment - Pipeline 08/27/24 08/27/24 08/29/24 58641 Huntingdon/4B South Capacity for August 28, 2024
Curtailment - Pipeline 08/26/24 08/26/24 08/29/24 58616 Station #1 Westbound Capacity for August 28, 2024 Revised
Curtailment - Pipeline 08/26/24 08/26/24 08/27/24 58631 Huntingdon/4B South Capacity for August 27, 2024
Curtailment - Pipeline 08/23/24 08/23/24 09/30/24 58625 Operationally Available Capacity for September 2024
Curtailment - Pipeline 08/23/24 08/23/24 08/26/24 58622 Huntingdon/4B South Capacity for August 24-26, 2024
Curtailment - Pipeline 08/22/24 08/22/24 08/23/24 58621 Huntingdon/4B South Capacity for August 23, 2024
Curtailment - Pipeline 08/21/24 08/21/24 08/22/24 58619 Huntingdon/4B South Capacity for August 22, 2024
Curtailment - Pipeline 08/20/24 08/21/24 08/22/24 58617 Sunset Creek Interconnect Capacity for August 21, 2024
Curtailment - Pipeline 08/20/24 08/20/24 08/21/24 58615 Huntingdon/4B South Capacity for August 21, 2024
Curtailment - Pipeline 08/20/24 08/20/24 08/20/24 58614 Huntingdon/4B South Capacity for August 20, 2024 ID1 - Revised
Curtailment - Pipeline 08/19/24 08/19/24 08/20/24 58613 Station #1 Westbound Capacity for August 20, 2024
Curtailment - Pipeline 08/19/24 08/19/24 08/20/24 58611 Huntingdon/4B South Capacity for August 20, 2024
Curtailment - Pipeline 08/16/24 08/16/24 08/16/24 58605 Huntingdon/4B South Capacity for August 16, 2024 ID1 - Revised
Curtailment - Pipeline 08/16/24 08/16/24 08/19/24 58604 Huntingdon/4B South Capacity for August 17-19, 2024
Curtailment - Pipeline 08/15/24 08/15/24 08/16/24 58603 Huntingdon/4B South Capacity for August 16, 2024
Curtailment - Pipeline 08/14/24 08/14/24 08/15/24 58602 Huntingdon/4B South Capacity for August 15, 2024
Curtailment - Pipeline 08/14/24 08/14/24 08/14/24 58601 Huntingdon/4B South Capacity for August 14, 2024 ID1 - Revised
Curtailment - Pipeline 08/13/24 08/13/24 08/14/24 58599 Huntingdon/4B South Capacity for August 14, 2024
Curtailment - Pipeline 08/12/24 08/12/24 08/13/24 58597 Huntingdon/4B South Capacity for August 13, 2024
Curtailment - Pipeline 08/09/24 08/09/24 08/14/24 58586 Station #1 Westbound Capacity for August 12-14, 2024
Curtailment - Pipeline 08/09/24 08/09/24 08/12/24 58585 Huntingdon/4B South Capacity for August 10-12, 2024
Commercial Operations 08/08/24 08/08/24 09/30/24 58583 Non-Binding Request for Proposal
Commercial Operations 08/08/24 08/08/24 09/30/24 58584 Non-Binding Request for Proposal
Curtailment - Pipeline 08/08/24 08/08/24 08/08/24 58582 Re-establishment Sunset Creek Interconnect Capacity for August 8, 2024 ID1
Curtailment - Pipeline 08/08/24 08/08/24 08/08/24 58581 Re-establishment Station #1 West Capacity for August 8, 2024 ID1
Curtailment - Pipeline 08/08/24 08/08/24 08/09/24 58580 Huntingdon/4B South Capacity for August 9, 2024
Curtailment - Pipeline 08/07/24 08/07/24 08/08/24 58578 Huntingdon/4B South Capacity for August 8, 2024
Curtailment - Pipeline 08/06/24 08/06/24 08/07/24 58577 Huntingdon/4B South Capacity for August 7, 2024
Curtailment - Pipeline 08/02/24 08/02/24 08/08/24 58557 Sunset Creek Interconnect Capacity for August 6-8, 2024
Curtailment - Pipeline 08/02/24 08/02/24 08/08/24 58556 Station #1 Westbound Capacity for August 6-8, 2024
Pipeline Operational Status 08/02/24 08/02/24 08/02/24 58555 Pipeline Operational Status for August 2, 2024 08:30 CCT
Curtailment - Pipeline 08/02/24 08/02/24 08/06/24 58554 Huntingdon/4B South Capacity for August 3-6, 2024
Pipeline Operational Status 08/01/24 08/01/24 08/01/24 58553 Pipeline Operational Status for August 1, 2024 16:00 CCT
Curtailment - Pipeline 08/01/24 08/01/24 08/02/24 58552 Huntingdon/4B South Capacity for August 2, 2024
Pipeline Operational Status 08/01/24 08/01/24 08/01/24 58551 Pipeline Operational Status for August 1, 2024 08:30 CCT
Pipeline Operational Status 07/31/24 07/31/24 07/31/24 58550 Pipeline Operational Status for July 31, 2024 16:00 CCT
Curtailment - Pipeline 07/31/24 07/31/24 07/31/24 58549 Re-establishment Station #1 West Capacity for July 31, 2024 ID1
Curtailment - Pipeline 07/31/24 07/31/24 08/01/24 58548 Huntingdon/4B South Capacity for August 1, 2024
Pipeline Operational Status 07/31/24 07/31/24 07/31/24 58547 Pipeline Operational Status for July 31, 2024 08:30 CCT
Curtailment - Pipeline 07/30/24 07/30/24 07/31/24 58538 Huntingdon/4B South Capacity for July 30 ID1 & July 31, 2024 Revised
Curtailment - Pipeline 07/30/24 07/30/24 07/31/24 58537 Huntingdon/4B South Capacity for July 31, 2024
Curtailment - Pipeline 07/29/24 07/29/24 07/30/24 58535 Huntingdon/4B South Capacity for July 30, 2024
Curtailment - Pipeline 07/26/24 07/25/24 07/31/24 58533 Station #1 Westbound Capacity for July 29 - 31, 2024
Curtailment - Pipeline 07/26/24 07/26/24 07/29/24 58532 Huntingdon/4B South Capacity for July 27-29, 2024
Curtailment - Pipeline 07/25/24 07/25/24 07/26/24 58531 Huntingdon/4B South Capacity for July 26, 2024
Curtailment - Pipeline 07/24/24 07/24/24 08/31/24 58530 Operationally Available Capacity for August 2024
Curtailment - Pipeline 07/24/24 07/24/24 07/25/24 58528 Huntingdon/4B South Capacity for July 25, 2024
Curtailment - Pipeline 07/23/24 07/23/24 07/24/24 58527 Huntingdon/4B South Capacity for July 24, 2024
Curtailment - Pipeline 07/22/24 07/22/24 07/23/24 58523 Huntingdon/4B South Capacity for July 23, 2024
Pipeline Operational Status 07/21/24 07/21/24 07/21/24 58522 Pipeline Operational Status for July 21, 2024 16:00 CCT
Pipeline Operational Status 07/21/24 07/21/24 07/21/24 58521 Pipeline Operational Status for July 21, 2024 08:30 CCT
Pipeline Operational Status 07/20/24 07/20/24 07/20/24 58520 Pipeline Operational Status for July 20, 2024 16:00 CCT
Pipeline Operational Status 07/20/24 07/20/24 07/20/24 58519 Pipeline Operational Status for July 20, 2024 08:30 CCT
Curtailment - Pipeline 07/19/24 07/19/24 07/22/24 58509 Huntingdon/4B South Capacity for July 20-22, 2024
Curtailment - Pipeline 07/18/24 07/18/24 07/19/24 58508 Huntingdon/4B South Capacity for July 19, 2024
Curtailment - Pipeline 07/17/24 07/17/24 07/18/24 58507 Huntingdon/4B South Capacity for July 18, 2024
Curtailment - Pipeline 07/16/24 07/16/24 07/17/24 58497 Huntingdon/4B South Capacity for July 17, 2024
Curtailment - Pipeline 07/15/24 07/15/24 07/16/24 58479 Huntingdon/4B South Capacity for July 16, 2024
Pipeline Operational Status 07/12/24 07/12/24 07/12/24 58477 Pipeline Operational Status for July 12, 2024 16:00 CCT
Curtailment - Pipeline 07/12/24 07/12/24 07/15/24 58475 Huntingdon/4B South Capacity for July 13-15, 2024
Pipeline Operational Status 07/12/24 07/12/24 07/12/24 58474 Pipeline Operational Status for July 12, 2024 08:30 CCT
Curtailment - Pipeline 07/11/24 07/11/24 07/11/24 58471 Huntingdon/4B South Capacity for July 11, 2024 ID1 Revised
Curtailment - Pipeline 07/11/24 07/11/24 07/12/24 58470 Huntingdon/4B South Capacity for July 12, 2024
Curtailment - Pipeline 07/10/24 07/10/24 07/11/24 58469 Huntingdon/4B South Capacity for July 11, 2024
Curtailment - Pipeline 07/09/24 07/09/24 07/10/24 58467 Huntingdon/4B South Capacity for July 10, 2024
Curtailment - Pipeline 07/08/24 07/08/23 07/15/24 58461 Re-establishment 26" Alberta East Capacity for July 8, 2024
Curtailment - Pipeline 07/08/24 07/08/23 07/15/24 58462 Re-establishment 26" Alberta East Capacity for July 8, 2024
Curtailment - Pipeline 07/08/24 07/08/24 07/09/24 58460 Huntingdon/4B South Capacity for July 9, 2024
Pipeline Operational Status 07/05/24 07/05/24 07/05/24 58459 Pipeline Operational Status for July 5, 2024 16:00 CCT
Pipeline Operational Status 07/05/24 07/05/24 07/05/24 58453 Pipeline Operational Status for July 5, 2024 08:30 CCT
Pipeline Operational Status 07/04/24 07/04/24 07/04/24 58452 Pipeline Operational Status for July 4, 2024 18:21 CCT
Pipeline Operational Status 07/04/24 07/04/24 07/04/24 58451 Pipeline Operational Status for July 4, 2024 16:00 CCT
Curtailment - Pipeline 07/04/24 07/03/24 07/08/24 58450 Huntingdon/4B South Capacity for July 4 ID1-8, 2024 Revised
Curtailment - Pipeline 07/03/24 07/03/24 07/08/24 58448 Huntingdon/4B South Capacity for July 4-8, 2024
Curtailment - Pipeline 07/02/24 07/02/24 07/03/24 58447 Huntingdon/4B South Capacity for July 3, 2024
Pipeline Operational Status 06/29/24 06/29/24 06/29/24 58442 Pipeline Operational Status for June 29, 2024 16:00 CCT
Pipeline Operational Status 06/29/24 06/29/24 06/29/24 58441 Pipeline Operational Status for June 29, 2024 08:30 CCT
Pipeline Operational Status 06/28/24 06/28/24 06/28/24 58440 Pipeline Operational Status for June 28, 2024 16:00 CCT
Pipeline Operational Status 06/28/24 06/28/24 06/28/24 58438 Pipeline Operational Status for June 28, 2024 08:30 CCT
Curtailment - Pipeline 06/28/24 06/28/24 07/02/24 58437 Huntingdon/4B South Capacity for July 1-2, 2024
Pipeline Operational Status 06/27/24 06/27/24 06/27/24 58430 Pipeline Operational Status for June 27, 2024 16:00 CCT
Curtailment - Pipeline 06/27/24 06/27/24 06/30/24 58429 Huntingdon/4B South Capacity for June 28-30, 2024
Curtailment - Pipeline 06/26/24 06/26/24 06/27/24 58428 Huntingdon/4B South Capacity for June 27, 2024
Curtailment - Pipeline 06/25/24 06/25/24 06/26/24 58427 Huntingdon/4B South Capacity for June 26, 2024
Curtailment - Pipeline 06/24/24 06/24/24 06/25/24 58417 Huntingdon/4B South Capacity for June 25, 2024
Curtailment - Pipeline 06/21/24 06/21/24 07/31/24 58409 Operationally Available Capacity for July 2024
Curtailment - Pipeline 06/21/24 06/21/24 07/07/24 58406 26" Alberta East Capacity for June 24 - July 7, 2024
Curtailment - Pipeline 06/21/24 06/21/24 06/24/24 58405 Huntingdon/4B South Capacity for June 22-24, 2024
Curtailment - Pipeline 06/20/24 06/20/24 06/21/24 58400 Huntingdon/4B South Capacity for June 21, 2024
Curtailment - Pipeline 06/18/24 06/18/24 06/20/24 58398 Huntingdon/4B South Capacity for June 19-20, 2024 Revised
Curtailment - Pipeline 06/18/24 06/18/24 06/20/24 58397 Huntingdon/4B South Capacity for June 19-20, 2024
Curtailment - Pipeline 06/17/24 06/17/24 06/18/24 58390 Huntingdon/4B South Capacity for June 18, 2024
Curtailment - Pipeline 06/14/24 06/14/24 06/15/24 58388 Huntingdon/4B South Capacity for June 14, 2024 ID1 Revised
Curtailment - Pipeline 06/14/24 06/14/24 06/17/24 58387 Huntingdon/4B South Capacity for June 15-17, 2024
Curtailment - Pipeline 06/13/24 06/13/24 06/14/24 58379 Huntingdon/4B South Capacity for June 14, 2024
Curtailment - Pipeline 06/12/24 06/12/24 06/13/24 58378 Huntingdon/4B South Capacity for June 13, 2024
Curtailment - Pipeline 06/11/24 06/11/24 06/12/24 58367 Huntingdon/4B South Capacity for June 12, 2024
Curtailment - Pipeline 06/10/24 06/10/24 06/11/24 58359 Huntingdon/4B South Capacity for June 11, 2024
Curtailment - Pipeline 06/09/24 06/09/24 06/10/24 58358 Huntingdon/4B South Capacity for June 9 ID1 - 10, 2024
Curtailment - Pipeline 06/07/24 06/07/24 06/10/24 58356 Huntingdon/4B South Capacity for June 8-10, 2024
Curtailment - Pipeline 06/06/24 06/06/24 06/07/24 58354 Huntingdon/4B South Capacity for June 7, 2024
Curtailment - Pipeline 06/05/24 06/05/24 06/06/24 58351 Huntingdon/4B South Capacity for June 6, 2024
Curtailment - Pipeline 06/04/24 06/04/24 06/05/24 58350 Huntingdon/4B South Capacity for June 5, 2024
Capacity Postings 06/03/24 06/03/24 06/21/24 58349 Open Season for T-North Expansion - Revised
Curtailment - Pipeline 06/03/24 06/03/24 06/04/24 58348 Huntingdon/4B South Capacity for June 4, 2024
Pipeline Operational Status 06/03/24 06/03/24 06/03/24 58347 Pipeline Operational Status for June 3, 2024 08:30 CCT
Curtailment - Pipeline 05/31/24 05/31/24 06/03/24 58329 Huntingdon/4B South Capacity for June 1-3, 2024
Curtailment - Pipeline 05/30/24 05/30/24 05/31/24 58328 Huntingdon/4B South Capacity for May 31, 2024
Curtailment - Pipeline 05/29/24 05/29/24 05/30/24 58327 Huntingdon/4B South Capacity for May 30, 2024
Curtailment - Pipeline 05/28/24 05/28/24 05/29/24 58320 Huntingdon/4B South Capacity for May 28, 2024 ID1 - Revised
Curtailment - Pipeline 05/28/24 05/28/24 05/29/24 58319 Huntingdon/4B South Capacity for May 29, 2024
Curtailment - Pipeline 05/27/24 05/27/24 05/28/24 58318 Huntingdon/4B South Capacity for May 28, 2024 - Revised
Curtailment - Pipeline 05/26/24 05/26/24 05/27/24 58316 Huntingdon/4B South Capacity for May 27, 2024 - Revised
Curtailment - Pipeline 05/24/24 05/24/24 05/28/24 58308 Huntingdon/4B South Capacity for May 25-28, 2024
Curtailment - Pipeline 05/23/24 05/23/24 06/30/24 58306 Operationally Available Capacity for June 2024
Curtailment - Pipeline 05/23/24 05/23/24 05/24/24 58297 Huntingdon/4B South Capacity for May 24, 2024
Curtailment - Pipeline 05/22/24 05/22/24 05/23/24 58296 Huntingdon/4B South Capacity for May 23, 2024
Curtailment - Pipeline 05/21/24 05/21/24 05/22/24 58287 Huntingdon/4B South Capacity for May 22, 2024
Curtailment - Pipeline 05/20/24 05/20/24 05/21/24 58286 Huntingdon/4B South Capacity for May 21, 2024 Revised
Curtailment - Pipeline 05/17/24 05/17/24 05/21/24 58282 Huntingdon/4B South Capacity for May 18-21, 2024
Pipeline Operational Status 05/16/24 05/16/24 05/16/24 58281 Pipeline Operational Status for May 16, 2024 16:00 CCT
Curtailment - Pipeline 05/16/24 05/16/24 05/17/24 58280 Huntingdon/4B South Capacity for May 17, 2024
Pipeline Operational Status 05/16/24 05/16/24 05/16/24 58279 Pipeline Operational Status for May 16, 2024 08:30 CCT
Commercial Operations 05/15/24 05/15/24 05/20/24 58278 Terminated - Mainline/Dry Gas OPC declared May 6, 2024
Pipeline Operational Status 05/15/24 05/15/24 05/15/24 58277 Pipeline Operational Status for May 15, 2024 16:00 CCT
Curtailment - Pipeline 05/15/24 05/15/24 05/17/24 58276 Aitken Creek Lateral Capacity for May 15, 2024 ID3 Revised
Curtailment - Pipeline 05/15/24 05/15/24 05/20/24 58275 Re-establishment Sunset Creek Interconnect Capacity for May 15, 2024 ID1
Curtailment - Pipeline 05/15/24 05/15/24 05/20/24 58274 Re-establishment Aitken Creek Lateral Capacity for May 16, 2024
Pipeline Operational Status 05/15/24 05/15/24 05/15/24 58273 Pipeline Operational Status for May 15, 2024 08:30 CCT
Curtailment - Pipeline 05/15/24 05/15/24 05/16/24 58272 Huntingdon/4B South Capacity for May 16, 2024
Pipeline Operational Status 05/14/24 05/14/24 05/14/24 58271 Pipeline Operational Status for May 14, 2024 16:00 CCT
Pipeline Operational Status 05/14/24 05/14/24 05/14/24 58270 Pipeline Operational Status for May 14, 2024 08:30 CCT
Curtailment - Pipeline 05/14/24 05/14/24 05/15/24 58269 Huntingdon/4B South Capacity for May 15, 2024
Pipeline Operational Status 05/13/24 05/13/24 05/13/24 58268 Pipeline Operational Status for May 13, 2024 16:00 CCT
Pipeline Operational Status 05/13/24 05/13/24 05/13/24 58267 Pipeline Operational Status for May 13, 2024 08:30 CCT
Curtailment - Pipeline 05/13/24 05/13/24 05/14/24 58266 Huntingdon/4B South Capacity for May 14, 2024
Curtailment - Pipeline 05/10/24 05/10/24 05/10/24 58259 Sunset Creek Interconnect Capacity for May 10, 2024 ID2 Revised
Curtailment - Pipeline 05/10/24 05/10/24 05/13/24 58258 Huntingdon/4B South Capacity for May 11-13, 2024 - Revised
Curtailment - Pipeline 05/10/24 05/10/24 05/13/24 58257 Sunset Creek Interconnect Capacity for May 11-13, 2024
Curtailment - Pipeline 05/10/24 05/10/24 05/13/24 58256 Huntingdon/4B South Capacity for May 11-13, 2024
Curtailment - Pipeline 05/09/24 05/09/24 05/10/24 58247 Huntingdon/4B South Capacity for May 10, 2024
Curtailment - Pipeline 05/08/24 05/08/24 05/09/24 58246 Huntingdon/4B South Capacity for May 9, 2024
Curtailment - Pipeline 05/07/24 05/07/24 05/08/24 58227 Huntingdon/4B South Capacity for May 8, 2024
Curtailment - Pipeline 05/06/24 05/06/24 05/07/24 58226 Huntingdon/4B South Capacity for May 7, 2024
Curtailment - Pipeline 05/03/24 05/03/24 05/06/24 58222 Huntingdon/4B South Capacity for May 4-6, 2024 - Revised
Commercial Operations 05/03/24 05/03/24 05/07/24 58221 Terminated - Mainline/Dry Gas OPC declared April 29, 2024
Curtailment - Pipeline 05/03/24 05/03/24 05/07/24 58220 Re-establishment 26" Alberta West Capacity for May 4, 2024
Commercial Operations 05/03/24 05/03/24 05/15/24 58219 Mainline/Dry Gas OPC effective May 6, 2024 - Aitken Creek Lateral
Curtailment - Pipeline 05/03/24 05/03/24 05/15/24 58218 Aitken Creek Lateral Capacity for May 6-15, 2024
Curtailment - Pipeline 05/03/24 05/03/24 05/10/24 58217 Sunset Creek Interconnect Capacity for May 4-10, 2024
Curtailment - Pipeline 05/03/24 05/03/24 05/06/24 58216 Huntingdon/4B South Capacity for May 4-6, 2024
Curtailment - Pipeline 05/02/24 05/02/24 05/03/24 58208 Huntingdon/4B South Capacity for May 2, 2024 ID1 Revised & May 3, 2024
Curtailment - Pipeline 05/01/24 05/01/24 05/02/24 58206 Huntingdon/4B South Capacity for May 2, 2024
Curtailment - Pipeline 04/30/24 04/30/24 05/01/24 58197 Huntingdon/4B South Capacity for May 1, 2024
Curtailment - Pipeline 04/29/24 04/29/24 04/30/24 58196 Huntingdon/4B South Capacity for April 30, 2024
Curtailment - Pipeline 04/26/24 04/26/24 04/26/24 58190 Huntingdon/4B South Capacity for April 26, 2024 ID1 Revised
Commercial Operations 04/26/24 04/29/23 05/03/24 58189 Mainline/Dry Gas OPC effective April 29, 2024 - 26" Alberta West
Curtailment - Pipeline 04/26/24 04/29/24 05/03/24 58188 26" Alberta Mainline Capacity for April 29 - May 3, 2024
Curtailment - Pipeline 04/26/24 04/25/24 04/29/24 58187 Huntingdon/4B South Capacity for April 27 - 29, 2024
Curtailment - Pipeline 04/25/24 04/25/24 04/26/24 58186 Huntingdon/4B South Capacity for April 26, 2024
Curtailment - Pipeline 04/24/24 04/25/23 04/30/24 58183 Re-establishment 26" Alberta East Capacity for April 25, 2024
Curtailment - Pipeline 04/24/24 04/24/24 04/25/24 58182 Huntingdon/4B South Capacity for April 25, 2024
Curtailment - Pipeline 04/23/24 04/23/24 05/31/24 58181 Operationally Available Capacity for May 2024
Curtailment - Pipeline 04/23/24 04/23/24 04/24/24 58179 Huntingdon/4B South Capacity for April 24, 2024
Curtailment - Pipeline 04/22/24 04/22/24 04/23/24 58178 Huntingdon/4B South Capacity for April 23, 2024 Evening Revised
Capacity Postings 04/22/24 04/22/24 06/07/24 58177 Open Season for T-North Expansion
Curtailment - Pipeline 04/22/24 04/22/24 04/23/24 58176 Huntingdon/4B South Capacity for April 23, 2024
Curtailment - Pipeline 04/19/24 04/19/24 08/26/24 58171 Ft Nelson Mainline N3L1 Sikanni River Integrity Digs Update
Curtailment - Pipeline 04/19/24 04/19/24 04/22/24 58169 Huntingdon/4B South Capacity for April 20-22, 2024 Revised
Curtailment - Pipeline 04/19/24 04/19/24 04/24/24 58167 26" Alberta East Capacity for April 19-24, 2024
Curtailment - Pipeline 04/19/24 04/19/24 04/22/24 58166 Huntingdon/4B South Capacity for April 20-22, 2024
Curtailment - Pipeline 04/18/24 04/18/24 04/19/24 58157 26" Alberta East Capacity for April 18, 2024 ID1
Curtailment - Pipeline 04/18/24 04/18/24 04/19/24 58156 Huntingdon/4B South Capacity for April 19, 2024
Curtailment - Pipeline 04/17/24 04/16/24 04/17/24 58147 Huntingdon/4B South Capacity for April 17, 2024 ID1 Revised
Curtailment - Pipeline 04/17/24 04/17/24 04/18/24 58146 Huntingdon/4B South Capacity for April 18, 2024
Curtailment - Pipeline 04/16/24 04/16/24 04/17/24 58138 Huntingdon/4B South Capacity for April 17, 2024
Curtailment - Pipeline 04/15/24 04/15/24 04/16/24 58136 Huntingdon/4B South Capacity for April 16, 2024
Curtailment - Pipeline 04/12/24 04/11/24 04/12/24 58128 Huntingdon/4B South Capacity for April 12, 2024 ID1 Revised
Curtailment - Pipeline 04/12/24 04/12/24 04/17/24 58127 26" Alberta East Capacity for April 15-17, 2024
Curtailment - Pipeline 04/12/24 04/12/24 04/15/24 58126 Huntingdon/4B South Capacity for April 13-15, 2024
Curtailment - Pipeline 04/11/24 04/11/24 04/12/24 58120 Huntingdon/4B South Capacity for April 12, 2024
Curtailment - Pipeline 04/10/24 04/10/24 04/15/24 58118 Re-establishment 26" Alberta East Capacity for April 11 - 14, 2024
Curtailment - Pipeline 04/10/24 04/10/24 04/11/24 58117 Huntingdon/4B South Capacity for April 11, 2024
Curtailment - Pipeline 04/09/24 04/09/24 04/10/24 58107 Huntingdon/4B South Capacity for April 10, 2024
Curtailment - Pipeline 04/08/24 04/08/24 04/09/24 58106 Huntingdon/4B South Capacity for April 9, 2024
Curtailment - Pipeline 04/05/24 04/05/24 04/10/24 58097 26" Alberta East Capacity for April 6-10, 2024
Curtailment - Pipeline 04/05/24 04/05/24 04/08/24 58096 Huntingdon/4B South Capacity for April 6-8, 2024
Curtailment - Pipeline 04/04/24 04/04/24 04/05/24 58091 Huntingdon/4B South Capacity for April 5, 2024
Curtailment - Pipeline 04/03/24 04/03/24 04/04/24 58087 Huntingdon/4B South Capacity for April 4, 2024
Curtailment - Pipeline 04/02/24 04/02/24 04/03/24 58086 Huntingdon/4B South Capacity for April 3, 2024
Curtailment - Pipeline 04/01/24 04/01/24 04/02/24 58076 Huntingdon/4B South Capacity for April 2, 2024
Curtailment - Pipeline 03/28/24 03/28/24 04/05/24 58071 26" Alberta East Capacity for April 1 - 5, 2024
Curtailment - Pipeline 03/28/24 03/28/24 04/01/24 58070 Huntingdon/4B South Capacity for April 1, 2024
Pipeline Operational Status 03/27/24 03/27/24 03/27/24 58069 Pipeline Operational Status for March 27, 2024 16:00 CCT
Curtailment - Pipeline 03/27/24 03/27/24 04/30/24 58042 Operationally Available Capacity for April 2024
Pipeline Operational Status 03/27/24 03/27/24 03/27/24 58067 Pipeline Operational Status for March 27, 2024 08:30 CCT
Curtailment - Pipeline 03/27/24 03/27/24 03/31/24 58066 Huntingdon/4B South Capacity for March 28-31, 2024
Curtailment - Pipeline 03/26/24 03/26/24 03/27/24 58058 Huntingdon/4B South Capacity for March 27, 2024
Curtailment - Pipeline 03/25/24 03/25/24 03/26/24 58056 Huntingdon/4B South Capacity for March 26, 2024
Curtailment - Pipeline 03/25/24 03/25/24 03/26/24 58057 Huntingdon/4B South Capacity for March 26, 2024
Pipeline Operational Status 03/23/24 03/23/24 03/23/24 58052 Pipeline Operational Status for March 23, 2024 16:00 CCT
Pipeline Operational Status 03/23/24 03/23/24 03/23/24 58051 Pipeline Operational Status for March 23, 2024 08:30 CCT
Pipeline Operational Status 03/22/24 03/22/24 03/22/24 58050 Pipeline Operational Status for March 22, 2024 16:00 CCT
Pipeline Operational Status 03/22/24 03/22/24 03/22/24 58047 Pipeline Operational Status for March 22, 2024 08:30 CCT
Curtailment - Pipeline 03/22/24 03/22/24 03/25/24 58046 Huntingdon/4B South Capacity for March 23-25, 2024
Pipeline Operational Status 03/21/24 03/21/24 03/21/24 58043 Pipeline Operational Status for March 21, 2024 16:00 CCT
Curtailment - Pipeline 03/21/24 03/21/24 10/31/24 58040 BC Pipeline 2024 Outage Forecast Update
Pipeline Operational Status 03/21/24 03/21/24 03/21/24 58039 Pipeline Operational Status for March 21, 2024 08:30 CCT
Curtailment - Pipeline 03/21/24 03/21/24 03/22/24 58038 Huntingdon/4B South Capacity for March 22, 2024
Pipeline Operational Status 03/20/24 03/20/24 03/20/24 58037 Pipeline Operational Status for March 20, 2024 16:00 CCT
Curtailment - Pipeline 03/20/24 03/20/24 03/21/24 58029 Huntingdon/4B South Capacity for March 21, 2024
Curtailment - Pipeline 03/19/24 03/19/24 03/20/24 58027 Huntingdon/4B South Capacity for March 20, 2024
Curtailment - Pipeline 03/18/24 03/18/24 03/19/24 58026 Huntingdon/4B South Capacity for March 19, 2024
Curtailment - Pipeline 03/15/24 03/15/24 03/18/24 58016 Huntingdon/4B South Capacity for March 16-18, 2024
Curtailment - Pipeline 03/14/24 03/14/24 03/15/24 58007 Huntingdon/4B South Capacity for March 15, 2024
Curtailment - Pipeline 03/13/24 03/13/24 03/14/24 58006 Huntingdon/4B South Capacity for March 14, 2024
Curtailment - Pipeline 03/12/24 03/12/24 03/13/24 57998 Huntingdon/4B South Capacity for March 13, 2024
Curtailment - Pipeline 03/11/24 03/11/24 03/12/24 57997 Huntingdon/4B South Capacity for March 12, 2024
Curtailment - Pipeline 03/08/24 03/08/24 03/11/24 57986 Huntingdon/4B South Capacity for March 9-11, 2024
Curtailment - Pipeline 03/07/24 03/07/24 03/08/24 57979 Huntingdon/4B South Capacity for March 8, 2024
Curtailment - Pipeline 03/06/24 03/06/24 03/07/24 57976 Huntingdon/4B South Capacity for March 7, 2024
Curtailment - Pipeline 03/05/24 03/05/24 03/06/24 57967 Huntingdon/4B South Capacity for March 6, 2024
Curtailment - Pipeline 03/04/24 03/04/24 03/05/24 57966 Huntingdon/4B South Capacity for March 5, 2024
Curtailment - Pipeline 03/01/24 03/01/24 03/04/24 57956 Huntingdon/4B South Capacity for March 2-4, 2024
Curtailment - Pipeline 02/29/24 02/29/24 03/01/24 57947 Huntingdon/4B South Capacity for March 1, 2024
Curtailment - Pipeline 02/28/24 02/28/24 02/29/24 57946 Huntingdon/4B South Capacity for February 29, 2024
Curtailment - Pipeline 02/27/24 02/27/24 02/28/24 57937 Huntingdon/4B South Capacity for February 28, 2024
Curtailment - Pipeline 02/26/24 02/26/24 02/27/24 57936 Huntingdon/4B South Capacity for February 27, 2024
Pipeline Operational Status 02/23/24 02/23/24 02/23/24 57929 Pipeline Operational Status for February 23, 2024 08:30 CCT
Curtailment - Pipeline 02/23/24 02/23/24 02/26/24 57928 Huntingdon/4B South Capacity for February 24-26, 2024
Curtailment - Pipeline 02/22/24 02/22/24 02/23/24 57926 Huntingdon/4B South Capacity for February 23, 2024
Curtailment - Pipeline 02/21/24 02/21/24 02/22/24 57922 Huntingdon/4B South Capacity for February 22, 2024
Pipeline Operational Status 02/20/24 02/20/24 02/20/24 57921 Pipeline Operational Status for February 20, 2024 16:00 CCT
Curtailment - Pipeline 02/20/24 02/20/24 02/21/24 57917 Huntingdon/4B South Capacity for February 21, 2024
Pipeline Operational Status 02/20/24 02/20/24 02/20/24 57916 Pipeline Operational Status for February 20, 2024 08:30 CCT
Curtailment - Pipeline 02/16/24 02/16/24 02/20/24 57907 Huntingdon/4B South Capacity for February 17-20, 2024
Curtailment - Pipeline 02/15/24 02/15/24 02/16/24 57900 Huntingdon/4B South Capacity for February 16, 2024
Curtailment - Pipeline 02/14/24 02/14/24 02/15/24 57899 Huntingdon/4B South Capacity for February 14, 2024 - ID3 REVISED
Curtailment - Pipeline 02/14/24 02/14/24 02/15/24 57896 Huntingdon/4B South Capacity for February 15, 2024
Curtailment - Pipeline 02/13/24 02/12/24 02/13/24 57888 Huntingdon/4B South Capacity for February 13, 2024 - ID1 REVISED
Curtailment - Pipeline 02/13/24 02/13/24 02/14/24 57887 Huntingdon/4B South Capacity for February 14, 2024
Curtailment - Pipeline 02/12/24 02/12/24 02/13/24 57886 Huntingdon/4B South Capacity for February 13, 2024
Curtailment - Pipeline 02/09/24 02/09/24 02/12/24 57876 Huntingdon/4B South Capacity for February 10-12, 2024
Curtailment - Pipeline 02/08/24 02/08/24 02/09/24 57875 Huntingdon/4B South Capacity for February 9, 2024
Curtailment - Pipeline 02/07/24 02/07/24 02/08/24 57872 Huntingdon/4B South Capacity for February 8, 2024
Curtailment - Pipeline 02/06/24 02/06/24 02/07/24 57864 Huntingdon/4B South Capacity for February 7, 2024
Curtailment - Pipeline 02/05/24 02/05/24 02/06/24 57862 Huntingdon/4B South Capacity for February 6, 2024
Curtailment - Pipeline 02/02/24 02/02/24 02/03/24 57852 Huntingdon/4B South Capacity for February 2, 2024 ID1 REVISED
Curtailment - Pipeline 02/02/24 02/02/24 02/05/24 57853 Huntingdon/4B South Capacity for February 3-5, 2024
Curtailment - Pipeline 02/01/24 02/01/24 02/02/24 57847 Huntingdon/4B South Capacity for February 2, 2024
Pipeline Operational Status 02/01/24 02/01/24 02/01/24 57846 Pipeline Operational Status for February 1, 2024 08:30 CCT
Pipeline Operational Status 01/31/24 01/31/24 01/31/24 57845 Pipeline Operational Status for January 31, 2024 16:00 CCT
Curtailment - Pipeline 01/31/24 01/31/24 02/01/24 57844 Huntingdon/4B South Capacity for February 1, 2024
Pipeline Operational Status 01/31/24 01/31/24 01/31/24 57843 Pipeline Operational Status for January 31, 2024 08:30 CCT
Pipeline Operational Status 01/30/24 01/30/24 01/30/24 57842 Pipeline Operational Status for January 30, 2024 16:00 CCT
Curtailment - Pipeline 01/30/24 01/30/24 01/31/24 57834 Huntingdon/4B South Capacity for January 31, 2024
Pipeline Operational Status 01/30/24 01/30/24 01/30/24 57833 Pipeline Operational Status for January 30, 2024 08:30 CCT
Curtailment - Pipeline 01/29/24 01/29/24 01/30/24 57832 Huntingdon/4B South Capacity for January 30, 2024
Curtailment - Pipeline 01/26/24 01/26/24 01/29/24 57822 Huntingdon/4B South Capacity for January 27-29, 2024
Curtailment - Pipeline 01/25/24 01/25/24 01/26/24 57815 Huntingdon/4B South Capacity for January 26, 2024
Curtailment - Pipeline 01/24/24 01/24/24 01/25/24 57813 Huntingdon/4B South Capacity for January 25, 2024
Curtailment - Pipeline 01/23/24 01/23/24 01/25/24 57812 Huntingdon/4B South Capacity for January 23, 2024 ID3 and January 24, 2024 Revised
Curtailment - Pipeline 01/23/24 01/23/24 01/24/24 57802 Huntingdon/4B South Capacity for January 24, 2024
Curtailment - Pipeline 01/22/24 01/22/24 01/24/24 57803 Huntingdon/4B South Capacity for January 22, 2024 ID3 and January 23, 2024 Revised
Curtailment - Pipeline 01/19/24 01/19/24 01/22/24 57792 Huntingdon/4B South Capacity for January 20-22, 2024
Curtailment - Pipeline 01/18/24 01/18/24 01/19/24 57784 Huntingdon/4B South Capacity for January 19, 2024 - REVISED
Curtailment - Pipeline 01/18/24 01/18/24 01/19/24 57783 Huntingdon/4B South Capacity for January 19, 2024
Curtailment - Pipeline 01/17/24 01/17/24 01/18/24 57782 Huntingdon/4B South Capacity for January 18, 2024
Curtailment - Pipeline 01/16/24 01/16/24 01/17/24 57765 Huntingdon/4B South Capacity for January 17, 2024
Curtailment - Pipeline 01/15/24 01/15/24 01/16/24 57764 Huntingdon/4B South Capacity for January 16, 2024 - REVISED
Curtailment - Pipeline 01/15/24 01/15/24 01/16/24 57762 Huntingdon/4B South Capacity for January 15, 2024 ID1 - REVISED
Curtailment - Pipeline 01/14/24 01/14/24 01/15/24 57754 Huntingdon/4B South Capacity for January 14, 2024 ID1
Pipeline Operational Status 01/14/24 01/14/24 01/14/24 57753 Pipeline Operational Status for January 14, 2024 08:30 CCT
Pipeline Operational Status 01/13/24 01/13/24 01/13/24 57752 Pipeline Operational Status for January 13, 2024 08:30 CCT
Curtailment - Pipeline 01/12/24 01/12/24 01/16/24 57743 Huntingdon/4B South Capacity for January 13-16, 2024
Pipeline Operational Status 01/11/24 01/11/24 01/11/24 57742 Pipeline Operational Status for January 11, 2024 16:00 CCT
Curtailment - Pipeline 01/11/24 01/11/24 01/12/24 57736 Huntingdon/4B South Capacity for January 12, 2024
Curtailment - Pipeline 01/10/24 01/10/24 01/10/24 57734 Huntingdon/4B South Capacity for January 10, 2024 ID1 - REVISED
Curtailment - Pipeline 01/10/24 01/10/24 01/11/24 57733 Huntingdon/4B South Capacity for January 11, 2024
Curtailment - Pipeline 01/09/24 01/09/24 01/10/24 57723 Huntingdon/4B South Capacity for January 10, 2024
Curtailment - Pipeline 01/08/24 01/08/24 01/09/24 57722 Huntingdon/4B South Capacity for January 9, 2024
Curtailment - Pipeline 01/05/24 01/05/24 01/08/24 57712 Huntingdon/4B South Capacity for January 6-8, 2024
Curtailment - Pipeline 01/04/24 01/04/24 01/05/24 57704 Huntingdon/4B South Capacity for January 5, 2024
Curtailment - Pipeline 01/03/24 01/03/24 01/04/24 57702 Huntingdon/4B South Capacity for January 4, 2024
Curtailment - Pipeline 01/02/24 01/02/24 01/03/24 57693 Huntingdon/4B South Capacity for January 3, 2024