Westcoast Energy Notice 58729

Source Link

All information here is provided as a service and information is not guaranteed to be accurate. PipeRiv is not responsible for any incorrect information.

 

Westcoast Energy Inc.

Critical Notice

Pipeline Operational Status

 

Notice:

 #58729

Revision: 

 #0

 

Subject:

Pipeline Operational Status for September 27, 2024 16:00 CCT

 

Summary:

       

System Linepack at 15:35 CCT:

2,764

  MMCF

 

Change Since Start of Gas Day September 27, 2024:

-12

  MMCF

 

Target Linepack for Gas Day September 27, 2024:

3,000

  MMCF

 
 

System Status at Report Time:

Low LinepackLow Linepack

System-Wide OFO in Effect:

No

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

Linepack is expected to increase today.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

September 27, 2024

 

September 28, 2024

No details available for this Operational Status.

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

Shippers must ensure accounts are within tolerance.

 

Estimated Imbalances at the end of Gas Day September 26, 2024:

Total Shipper Imbalances(GJ)

-239,582

Total OBA Imbalances(GJ)

-31,215

System Gas on Pipe(GJ)

12,442

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 

Posting Date:27-Sep-2024 15:54 CCT
Effective Date:27-Sep-2024
End Date:27-Sep-2024
Response Date:N/A
Location:N/A
Contacts:N/A
 

Westcoast Energy Inc.

Critical Notice

Pipeline Operational Status

 

Notice:

 #58729

Revision: 

 #0

 

Subject:

Pipeline Operational Status for September 27, 2024 16:00 CCT

 

Summary:

       

System Linepack at 15:35 CCT:

2,764

  MMCF

 

Change Since Start of Gas Day September 27, 2024:

-12

  MMCF

 

Target Linepack for Gas Day September 27, 2024:

3,000

  MMCF

 
 

System Status at Report Time:

Low LinepackLow Linepack

System-Wide OFO in Effect:

No

Pack Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

Draft Tolerances:

Suppliers:

Minimum 500 GJ - Maximum of 8%

Non-Suppliers:

Minimum 500 GJ - Maximum of 2% up to 5,000 GJ

Marketers:

Mandatory zero balance

 

Physical Operations Notes:

Linepack is expected to increase today.

 
 

Operational Status Details:

 

Report for Gas Day

 

Forecast for Gas Day

 

September 27, 2024

 

September 28, 2024

No details available for this Operational Status.

 

Pipeline Status:

Mainline North

Mainline Central

Mainline South

 

Commercial Notes:

Shippers must ensure accounts are within tolerance.

 

Estimated Imbalances at the end of Gas Day September 26, 2024:

Total Shipper Imbalances(GJ)

-239,582

Total OBA Imbalances(GJ)

-31,215

System Gas on Pipe(GJ)

12,442

 

A negative imbalance is owed to the Pipeline.

 

The above information is a forecast based on variable factors and as a result can change once actual data is validated.

If you have any questions, please call the CSR hotline at (403) 699-1800

 

Posting Date:27-Sep-2024 15:54 CCT
Effective Date:27-Sep-2024
End Date:27-Sep-2024
Response Date:N/A
Location:N/A
Contacts:N/A